Loading...
HomeMy WebLinkAboutSANCTUARY WEST - FDP - FDP110004 (FORMERLY 30-07A) - CORRESPONDENCE - CITY STAFF (11)Page 2 of 2 construction, why Ch. 10 applies to proposed floodway construction, how floodway construction will meet no -rise certification standards, and how it will be re -certified for no -rise with as-builts. o. Site boundaries in the Drainage Report appendix figures must be shown clearly and must be to scale. The repeat comments are the same as those offered during our previous review on April 29, 2011. It must be noted that updates to the Drainage Report were not received under this submittal either, and must be completed before floodplain use permits for work in the flood fringe or floodway will be considered. Brian Brian K. Varrella, P.E., CFM Floodplain Administrator Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 Phone: (970) 416-2217 E-mail: bvarrella(a-)fcgov.com Website: www.fcgov.com/stormwater 1 1012012 Page 1 of 2 Steve Olt From: Brian Varrella [BVarrella@fcgov.com] Sent: Tuesday, January 10, 2012 4:30 PM To: Bill Veio Cc: Lindsay Ex; Shane Boyle; Wes Lamarque; Jon Haukaas; Steve Dush; John Von Nieda; Jeff County; Glen Schlueter; Steve Olt; Sheri Langenberger; 'Terence Hoaglund'; Ken Sampley Subject: Sanctuary West - Overall Floodplain Sheet 70 Bill, Thank you for your help over the phone today at 4:00 PM. I would like to summarize my findings on Sheet 70 of 70 of the Utility Plans, Titled Overall Floodplain. The following comments in red text are still outstanding, as recorded in the summary from Steve Olt by e-mail on Friday, Jan. 6, 2012 at 11:05 AM: 3. Floodplain comments (Brian Varrella) — Brian saw the revised Utility Plans for the first time today; he did not have a chance to go through all of his comments from the April 29, 2011 staff letter, but did note several of his comments still had not been addressed: a. The overall floodplain exhibit has not been updated; b. The floodplain linework is illegible. c. Repeat Comment from April 29, 2011; Cross sections must reflect those used in the floodplain modeling report. d. The drainage sheets and grading sheets must reference the Overall Floodplain sheet. e. Repeat Comment from April 29, 2011; Please add the following notes to the Plat, Landscape Plan, Site Plan, Utility Plans (General Notes), Grading Plan, and Overall Floodplain Sheet: (1) Portions of this property are located in the City 100-year flood fringe and floodway of the West Vine Basin, and are subject to the requirements of Chapter 10 of City Code. (2) No storage of materials or equipment shall be allowed in the floodway, whether temporary (during construction) or permanent. (3) An approved floodplain use permit is required for all site elements (landscaping, fencing, roadway, detention ponds, bike paths, parking lot, utilities etc.) in the floodplain prior to mobilization. (4) No -rise certification is required for all site work including landscaping and fencing within the floodway. Re -certification of no -rise is required for as -built conditions. (5) See floodplain exhibit on Sheet 70 for cross-section locations, BFE lines, and other additional floodplain information. f. Remove all references to Larimer County Floodplain Overlay Districts from the general notes. g. All BFEs must be labeled on the Overall FP Sheet. h. Repeat Comment from April 29, 2011; Please make sure both FW lines are represented on the Overall FP Sheet. i. Repeat Comment from April 29, 2011; Please add benchmark information and vertical datum to the Overall FP Sheet. j. Landscape plans; change SW Note 1 reference from "Frine" to "Fringe". k. Repeat Comment from April 29, 2011; Drainage report must reference the date of the URS floodplain modeling report. I. Repeat Comment from April 29, 2011; Drainage report must include a statement of why floodplain modeling was necessary. This is not currently clear. m. Drainage report section III, A, Regulations, must include a reference to Chapter 10 of the City of FC Municipal Code for 100-year floodplain and floodway areas. n. Repeat Comment from April 29, 2011; Drainage report must discuss all floodway 1/10/2012