HomeMy WebLinkAboutSUMMITVIEW COMMUNITY CHURCH WTE - PDP - 34-03 - REPORTS - RECOMMENDATION/REPORTSummitview Community Church, WTE, #34-03 Type I Administrative Review Page 4 FINDINGS OF FACT/CONCLUSIONS After reviewing the Summitview Community Church Wireless Telecommunication Equipment Project Development Plan, #34-03, staff makes the following findings of fact and conclusions: 1. The proposed land uses are permitted in the Public Open Lands district. 2. The Project Development Plan complies with all applicable district standards of Section 4.10 of the Land Use Code, Public Open Lands zone district. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. RECOMMENDATION: Staff recommends approval of Summitview community Church Wireless Telecommunication Equipment Project Development Plan, #34-03 Summitview Community Church, WTE, #34-03 Type I Administrative Review Page 3 this structure. All parties involved must negotiate in good faith to achieve co -location of telecommunication equipment on existing structures. Setbacks — The ground equipment will be 31 feet from the sidewalk along Drake Road. Since this is not a structure, it is not subject to the setback criteria within Sections 4.10 or 3.5.3 of the land use code. Wireless Telecommunication Equipment — The antenna equipment will have the same material and finish as the existing utility pole. Landscaping and Fencing — The equipment enclosure will be located behind the curbside landscaping along Drake Road. The six-foot wooden fence will include masonry posts every eight feet. Five additional evergreen trees will be planted in front of the enclosure to provide additional screening. All existing landscaping will remain. Lighting — The only lighting associated with the project is service lighting which will be included within the equipment enclosure. This lighting would only be used for services performed when it is dark. Historic Sites and Structures — The wireless telecommunication equipment is not located on a historic structure, nor is the site located within a historic district. Stealth Technology — The wireless telecommunication equipment is located on an existing metal electric utility pole. The poles themselves are not considered an attractive asset to the neighborhood, and is strictly a utility function. The antennas have been designed to minimize their appearance, considering the location directly adjacent to Drake Road and the adjacent residential. The design will have less of an impact than the existing antennas located to the east of the site, in front of the Preserve Apartments. 4. Neighborhood Information Meeting Based on the nature and the materials presented as part of the project submittal, and the limited impacts on adjacent property owners, a neighborhood meeting was not held for this application. Summitview Community Church, WTE, #34-03 Type I Administrative Review Page 2 EXECUTIVE SUMMARY: The project development plan has been reviewed in accordance with the applicable requirements of the Land Use Code (LUC) and was found to be in substantial compliance with the following: The process located in Division 2.1 — General Procedural Requirements, Division 2.2 — Common Development Review Procedures for Development Applications, and Division 2.4 — Project Development Plan located within Article 2 — Administration; and the design standards located within Article 3 — General Development Standards; and the standards located in Section 4.10, Public Open Lands (POL) of Article 4 — Districts. ANALYSIS: Background The surrounding zoning and land uses are as follows: N: POL — Ross Natural Area S: RL — Church E: MMN — Multi -Family Residential W: POL — Ross Natural Area The property was annexed in September 1965 as part of the Fourth College Annexation. 2. Division 4.10 of the Land Use Code, Public Open Lands District The proposed use of wireless telecommunication equipment is permitted in the Public Open Lands zone district subject to Administrative Review. 3. Division 3.8, Supplemental Regulations A. Section 3.8.13, Wireless Telecommunication Location — The wireless telecommunication equipment is proposed to be located on an existing non-residential structure within the Public Open Lands zone district. Co -location — There are no other existing wireless telecommunication facilities or equipment within the general area which the applicant may co -locate upon. The applicant may not prevent future telecommunication carriers from co -locating upon ITEM NO. MEETING DATE STAFF_V.t6 t22KJya City of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: Summitview Community Church — Wireless Telecommunication Equipment, Project Development Plan - #34-03 [Type I Administrative Review] APPLICANT: AT&T Wireless C/o General Dynamics 7436 South Ivy Way Centennial, CO 80112 OWNER: Summitview Community Church 1600 West Drake Road Fort Collins, Co 80525 PROJECT DESCRIPTION: Summitview Community Church is a Project Development Plan for a wireless telecommunication antenna to be located on the top of an existing 75-foot electric transmission pole. The pole is located within the Drake Road Right -of -Way, adjacent to the parking lot for the Summitview Community Church. The pole is a part of the Platte River Power Authority electric transmission line which parallels Drake Road. The antenna array will consist of three individual antennas, directly attached to a support pole, which is attached to the side of the transmission pole. The supporting ground equipment will be located in the adjacent Summitview Community Church Parking lot. The equipment will be concealed within a 25 feet by 17 feet fenced area at the entrance to the lot. The fence will include masonry columns for greater aesthetics. Additional evergreens will be planted to help provide additional screening of the equipment. The property is zoned POL — Public Open Lands. RECOMMENDATION: Approval COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT