Loading...
HomeMy WebLinkAboutSUMMITVIEW COMMUNITY CHURCH WTE - PDP - 34-03 - CORRESPONDENCE - (3)Nov 19 03 09:14p Suki Richie 201-963-6970 p.2 die walker group uc September 18, 2003 Mr. Greg Richard Summitview Community Church 1601 West Drake Ft Collins, CO 80525 RE: Update of Wireless Communication Equipment Documents Dear Mr. Richard: Per our last conversation, we received positive feedback from the Fort Collins planning department on September 8`h regarding the updated site plan for the equipment shelter. As previously mentioned, AT&T Wireless/General Dynamics did agree to turn the site to an east/west orientation in order to ensure that traffic is not obstructed in any way. In addition, increased landscaping will be added to the site and decorative masonry blocks will secure the comers of the 6-foot cedar fencing surround the equipment shelter. I have enclosed 2 copies of the final Zoning Drawings (dated 9/12/03 on the Drawing Index of page T01). o Please date and sign the top page of one set of the Zoning Drawings and return it to us in the enclosed self-addressed envelope. Please date and sign the other set of Zoning Drawings and keep them for your files. Your signature will indicate the church's approval of the final plans for the equipment shelter. o Please sign below confirming you agree to replace the exhibit from the March 12`h, 2003 lease between AT&T Wireless and Faith Evangelical Free Church with your copy of the dated and signed Zoning Drawings inserted as the new lease exhibit. Please return this page in the self- addressed envelope. Signed Print Name Date 9 — Z4 -Oie the walker group llc • 7436 S. Ivy Way • Centennial, Colorado Phone: 303-868-6866 • Fax: 720-200-3595