HomeMy WebLinkAboutSUMMITVIEW COMMUNITY CHURCH WTE - PDP - 34-03 - CORRESPONDENCE -was that the proposed AWS Antennas would be bracketed to the existing power pole and would not extend
above the pole like a Christmas Tree.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 7 Created: 10/13/2003
No comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 2
i.�.. STAFF PROJECT REVIEW
City of Fort Collins
AT&T WIRELESS Date: 10/15/2003
GENERAL DYNAMICS, LIZ WALKER
7436 S. IVY WAY
CENTENNIAL, CO 80112
Staff has reviewed your submittal for SUMMITIEW COMMUNITY CHURCH WTE - TYPE I
(LUC), and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: General
Number: 8 Created: 10/15/2003
Previous exhibits represented a more stealth design, with the antennas pulled closer to the pole. This is a high
visibility area, the design should minimize the impacts on the adjacent arterial street, natural area and
residential area.
Number: 9 Created: 10/15/2003
Two additional masonry columns will need to be included within the front side of the enclosure fence. The
wooden fence should include a top cap rail, a more formal fence to match the masonry columns.
Number: 10 Created: 10/15/2003
Please label the additional landscaping. These should be medium-sized evergreen trees.
Number: 11 Created: 10/15/2003
The coax cable on the pole will need to be included within a shroud to screen the cable to a minimum
height of 20 feet.
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
Number: 1 Created: 10/6/2003
Power will come from oval vault located approx 300' east of this site.
Number: 2 Created: 10/6/2003
Applicant will be responsible for labor and material charges to install primary cable and new transformer
Number: 3 Created: 10/6/2003
Transformer will be placed within an easement next to the parking lot at the site. Applicant is responsible for
obtaining this easement. Contact Light & Power for transformer location.
Number: 4 Created: 10/6/2003
Will need a Commercial Loading Form (C-1).
Number: 5 Created: 10/6/2003
Electric meter must be placed so that it can be read from outside of the enclosed site.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 6 Created: 10/9/2003
Stealth technology - after several meeting with the applicant's representative, I understood that this project
would be designed using stealth technology because of this very visible location. The submitted photo
simulations and plan set that were submitted donl seem to true reflect this. My interpretation of the meeting