Loading...
HomeMy WebLinkAboutHECKART SUBDIVISION - PDP - 35-03 - CORRESPONDENCE - (5)— Project: Date: Planner: VT Traffic Operations: Engineer: ems Requested —Reidlffinedems Be7eurnev `° -' (a a m � Other Items Re cared q .2 `^ C `-° m a � vmm c ' 0 O Returned Engineering Stormwater Water/Wastewater FCLWD Traffic Operations .Transportation Planning Tra nsfort Engineering Pvmt. Light & Power Technical Services PFA TOTALS 2 Z Other: Note: All redlined items should be returned with the resubmittal/revisions. Please call 221-6750 to schedule a resubmittal gigpointment, M Number: 77 Created: 5/17/2004 [5/17/04) Pocket easement maybe required by owner to set pad - mounted transformer to feed additional load. This transformer would need to be located within 10' of a paved or truck accessible surface. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Utility Number: 79 Created: 5/20/2004 Please provide a signature block for the ditch company on the utility plans. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility Number: 78 Created: 5/18/2004 [5/18/041 No comments Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Abe .� Steve Olt, City Planner Cc: Susan Joy Rob Irish Frank Heckart Page 3 •x Topic: Utility Number: 18 Created: 11/26/2003 [5/12/041 Repeat comment. Please provide a ditch company signature block on the utility sheets. Will need to provide a letter of intent from the ditch company prior to being allowed to go to hearing. [4/12/041 Repeat comment. Ditch signature block was only added to plat. [11/26/031 Show the Ditch Company's easement on all plan sets and provide a New Mercer Signature block on the various plan sets. Number: 40 [5/12/041 Repeat comment. Created: 11/26/2003 [4/12/041 Repeat comment. Please show the building envelope on the plans and coordinate with PFA. [11/26/031 Contact PFA as soon as possible. Lot 2 may be out of service and must be sprinklered. Lot 2 may not meet the 150' accessibility requirement. Number: 71 Created: 5/12/2004 [5/12/04] Sheet 4 - Please label the curb side of the ramps at the driveway entrances so that there is no confusion in the field when this is constructed. Number: 72 Created: 5/12/2004 [5/12/041 Sheet 4 - Please hatch the street cut using a large diagonal for scanability. Number: 73 Created: 5/12/2004 (5/12/041 Sheet 5 - Label the building envelope. Remove the duplicated word in the rip rap label. Number: 74 Created: 5/12/2004 [5/12/04] Please dimension the narrowest width of the emergency access drive aisle. Is it less than PFA's requirement? Department: Light & Power Issue Contact: Rob Irish Topic: Utility Number: 75 Created: 5/17/2004 [5/17/041 The 5' utility & drainage easement on the west side of the property is only adequate for Light & Power facilities. If gas or some other utility is going in this same easement there will not be enough separation. The easement will need to be wider. Number: 76 Created: 5/17/2004 [5/17/041 Owner will need to coordinate meter location with Light & Power. Owner will be responsible for electric development charges & system modification charges if applicable. Page 2 M STAFF PROJECT REVIEW City of Fort Collins Stewart & Associates Date: 06/02/2004 c/o Jack Blake 103 South Meldrum Street Fort Collins, CO. 80526 Staff has reviewed your submittal for HECKART SUBDIVISION - TYPE I (LUC), and we offer the following comments: ISSUES: Department: Engineering Topic: General Number: 16 [5/12/041 Repeat comment plan sets. [4/12/041 Repeat comment plan sets. Issue Contact: Susan Joy Created: 11/26/2003 Show and label building envelope, all Show building envelope, all sheets, all (11/26/031 Do not show the actual building but provide a building envelope instead. Number: 31 Created: 11/26/2003 [5/12/041 Repeat comment. Easements are not shown consistently between the various plan sets. The easements are shown differently and labeled differently on the plat, utility, site, and landscape plans. All of them need to match. [4/12/041 Repeat comment. Easements are still not shown correctly and they are not shown consistently between the various plan sets. (11/26/03) Correct the easement labels to read: 20' Emergency Access Easement 24' Emergency Access and Utility Easement 10' Drainage and Utility Easement Topic: Plat Number: 8 Created: 11/26/2003 [5/12/041 [4/12/041 [11/26/031 From Technical Services: Boundary and legal close. Page 1