HomeMy WebLinkAboutHECKART SUBDIVISION - PDP - 35-03 - CORRESPONDENCE - (5)—
Project: Date:
Planner: VT Traffic Operations: Engineer:
ems Requested
—Reidlffinedems Be7eurnev
`°
-'
(a
a
m
�
Other Items Re cared
q
.2
`^
C
`-°
m
a
�
vmm
c '
0
O
Returned
Engineering
Stormwater
Water/Wastewater FCLWD
Traffic Operations
.Transportation Planning
Tra nsfort
Engineering Pvmt.
Light & Power
Technical Services
PFA
TOTALS
2
Z
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
Please call 221-6750 to schedule a resubmittal
gigpointment,
M
Number: 77 Created: 5/17/2004
[5/17/04) Pocket easement maybe required by owner to set pad -
mounted transformer to feed additional load. This transformer would
need to be located within 10' of a paved or truck accessible
surface.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Utility
Number: 79 Created: 5/20/2004
Please provide a signature block for the ditch company on the
utility plans.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility
Number: 78 Created: 5/18/2004
[5/18/041 No comments
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues
related to this project, please feel free to call me at 221-6341.
Yours Truly,
Abe .�
Steve Olt,
City Planner
Cc: Susan Joy
Rob Irish
Frank Heckart
Page 3
•x
Topic: Utility
Number: 18 Created: 11/26/2003
[5/12/041 Repeat comment. Please provide a ditch company signature
block on the utility sheets. Will need to provide a letter of
intent from the ditch company prior to being allowed to go to
hearing.
[4/12/041 Repeat comment. Ditch signature block was only added to
plat.
[11/26/031 Show the Ditch Company's easement on all plan sets and
provide a New Mercer Signature block on the various plan sets.
Number: 40
[5/12/041 Repeat comment.
Created: 11/26/2003
[4/12/041 Repeat comment. Please show the building envelope on the
plans and coordinate with PFA.
[11/26/031 Contact PFA as soon as possible. Lot 2 may be out of
service and must be sprinklered. Lot 2 may not meet the 150'
accessibility requirement.
Number: 71 Created: 5/12/2004
[5/12/04] Sheet 4 - Please label the curb side of the ramps at the
driveway entrances so that there is no confusion in the field when
this is constructed.
Number: 72 Created: 5/12/2004
[5/12/041 Sheet 4 - Please hatch the street cut using a large
diagonal for scanability.
Number: 73 Created: 5/12/2004
(5/12/041 Sheet 5 - Label the building envelope. Remove the
duplicated word in the rip rap label.
Number: 74 Created: 5/12/2004
[5/12/04] Please dimension the narrowest width of the emergency
access drive aisle. Is it less than PFA's requirement?
Department: Light & Power Issue Contact: Rob Irish
Topic: Utility
Number: 75 Created: 5/17/2004
[5/17/041 The 5' utility & drainage easement on the west side of
the property is only adequate for Light & Power facilities. If gas
or some other utility is going in this same easement there will not
be enough separation. The easement will need to be wider.
Number: 76 Created: 5/17/2004
[5/17/041 Owner will need to coordinate meter location with Light &
Power. Owner will be responsible for electric development charges &
system modification charges if applicable.
Page 2
M
STAFF PROJECT REVIEW
City of Fort Collins
Stewart & Associates Date: 06/02/2004
c/o Jack Blake
103 South Meldrum Street
Fort Collins, CO. 80526
Staff has reviewed your submittal for HECKART SUBDIVISION - TYPE I
(LUC), and we offer the following comments:
ISSUES:
Department: Engineering
Topic: General
Number: 16
[5/12/041 Repeat comment
plan sets.
[4/12/041 Repeat comment
plan sets.
Issue Contact: Susan Joy
Created: 11/26/2003
Show and label building envelope, all
Show building envelope, all sheets, all
(11/26/031 Do not show the actual building but provide a building
envelope instead.
Number: 31 Created: 11/26/2003
[5/12/041 Repeat comment. Easements are not shown consistently
between the various plan sets. The easements are shown
differently and labeled differently on the plat, utility,
site, and landscape plans. All of them need to match.
[4/12/041 Repeat comment. Easements are still not shown correctly
and they are not shown consistently between the various plan
sets.
(11/26/03) Correct the easement labels to read:
20' Emergency Access Easement
24' Emergency Access and Utility Easement
10' Drainage and Utility Easement
Topic: Plat
Number: 8 Created: 11/26/2003
[5/12/041 [4/12/041 [11/26/031 From Technical Services: Boundary
and legal close.