Water/Wastewater:
1. There is water and sanitary sewer in the LaPorte Avenue right-
of-way.
2. There is an existing 8" sanitary sewer service stub into the
property.
3. Where is the fire hydrant for Poudre Fire Authority service?
Stormwater:
1. Type 'R' - 15" pipe must be used.
Light & Power:
1. Electric service is from LaPorte Avenue.
2. Please contact Rob Irish, at 224-6167, if you have electric
service -related questions.
This development proposal is in a condition to be able to be
scheduled for an administrative public hearing. Please contact me to
schedule a date and time for the hearing, which must be held in the
evening because the property for proposed development is in a
residential neighborhood. We must have the required notification
letter out to all Affected Property Owners at least 14 days prior to
the date of the public hearing.
The comments contained in this letter may be addressed with a re -
submittal prior to public hearing or with a final plan check after
the hearing. Please be sure and return all of your red -lined plans
when you re -submit documents.
If you have any questions regarding these issues or any other issues
related to this project, please feel free to call me at 221-6341.
Yours Truly,
Azp
Steve Olt
City Planner
cc: Susan Joy, City Engineering
Frank Heckart
Current Planning File #35-03
Page 7
Number: 4 Created: 11/24/2003
[11/24/031 Provide existing sewer inverts in the existing manhole.
Our records indicated that an existing 8-inch stub and a sewer
service already exist in the existing sanitary sewer manhole (see
print out attached to utility plans). Remove the existing 8-inch
stub and install new service in this existing location. Include note
to grout opening closed with non -shrink grout.
Number: 5 Created: 11/24/2003
[11/24/031 See site, landscape and utility plans for other
comments.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 1 Created: 11/4/2003
[11/4/03] On Lot 2, there is no need to show the location of the
proposed house on the site and landscape plans. It may change when
it comes time to actually build. Its location will be reviewed when
the permit is applied for to be sure that it complies with setbacks,
etc.
********************************************************************
The following comments were expressed at staff review on November
26`h:
Engineering:
1. The design and construction for necessary improvements to
LaPorte Avenue associated with this development request must be
done at this time.
2. See Appendix 6 for scanability requirements.
3. Easements to Lot 2 are needed.
4. The curb returns must have a radius.
5. A building envelope, rather than a building, should be shown on
the Site Plan.
6. Tie the proposed sidewalk along LaPorte Avenue into the existing
walk.
7. An easement for the New Mercer Ditch, and a signature block for
the Ditch Company, must be added to the subdivision plat.
8. Erosion control for Lot 2 must be provided.
9. There is a little off -site grading needed for this development
that requires an easement from -that property owner.
Page 6
1
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 6 Created: 11/24/2003
(11/24/031 How will lot be addressed - concern about directing
emergency vehicles.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 41 Created: 11/26/2003
The inlet and storm sewer need to be improved with this PDP. A 5-
foot Type-R inlet with a 15-inch diameter outlet pipe is required to
replace the existing inlet and pipe. Please call Wes Lamarque at
416-2418 if you have nay questions.
Number: 43 Created: 11/26/2003
Please revise the benchmark on the cover sheet. See redlined plan.
Topic: Erosion/Sediment Control
Number: 42 Created: 11/26/2003
There should be some text in the report and some proposed erosion
control measures shown on the plans for this site even though the
site is small. There are some improvements to be made on both lots.
Please call Bob Zakely at 221-6700 for information regarding what is
to be required.
Department: Transfort
Topic: General
Number: 7
[11/24/031 No comments
Department: Transportation Planning
Topic: Transportation
Number: 38
[11/26/031 No comments
Issue Contact: Garold Smith
Created: 11/24/2003
Issue Contact: Tom Reiff
Created: 11/26/2003
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 2 Created: 11/24/2003
[11/24/03] Meter pit and curb stop may not be located with in public
right of way. Place curb stop 1 foot from rear of utility easement
and meter pit no more than 2 feet beyond that. Provide utility
easement for meter pit for Lot 2 on Lot 1. Label proposed 24 foot
wide access easement as access and utility. Maintain 10 feet of
separation on both sides of water and sewer lines to utility
easement.
Number: 3 Created: 11/24/2003
(11/24/031 Has 27-inch water main been pot holed? Pothole the
existing water main now, to determine if this area is in a lowered
section for the ditch crossing. The water service may not be located
in lowered section of water main.
Page 5
0
Number: 28 Created: 11/26/2003
[11/26/031 Provide a flowline profile for the design and
construction of this development's frontage along LaPorte Avenue.
Number: 29 1Created: 11/26/2003
[11/26/03] Remove and replace the area inlet shown in LaPorte
Avenue with a Type 3 inlet. Provide the appropriate details and
approximate street cut. Provide the street cut note:
Limits of street cut are approximate. Final limits are to be
determined in the field by the City Engineering Inspector. All
repairs to be in accordance with City street repair standards.
Number: 30 Created: 11/26/2003
(11/26/031 Show where the existing yard hydrant is being relocated
to.
Number: 31 Created: 11/26/2003
(11/26/031 Correct the easement labels to read:
20' Emergency Access Easement
24' Emergency Access and Utility Easement
10' Drainage and Utility Easement
Number: 32 Created: 11/26/2003
(11/26/031 What's happening with the sewer clean -out shown on Sheet
3? Does it tie into something? Is it being removed? Abandoned?
Number: 34 Created: 11/26/2003
[11/26/031 Detail Sheet.- Remove detail 706 and replace with 707.
Change the design in accordance with 707.
Number: 35 Created: 11/26/2003
(11/26/031 Place the Construction Notes on Sheet 6 behind the
General Notes - in other words, Sheet 6 should be Sheet 2.
Number: 37 Created: 11/26/2003
[11/26/03] Provide erosion control for Lot 2 and show on the
Drainage & Erosion Control Sheets.
Number: 40 Created: 11/26/2003
(11/26/03] Contact PFA as soon as possible. Lot 2 may be out of
service and must be sprinklered. Lot 2 may not meet the 150'
accessibility requirement.
Department: Natural Resources
Topic: General
Number: 44
[11/28/03) No Issues.
Issue Contact: Doug Moore
Created: 11/28/2003
Page 4
u
Topic: Landscape
Number: 39 Created: 11/26/2003
[11/26/031 Show all utilities on the Landscape Plan.
Topic: Plat
Number: 8 Created: 11/26/2003
[11/26/031 From Technical Services: Boundary and legal close.
Number: 9 Created: 11/26/2003
(11/26/033 From Technical Services: What about the New Mercer
Ditch at the NE corner of Lot 1? You need to show the Ditch
Company's easement and provide a signature block for them to sign
off on the plat.
Number: 10 Created: 11/26/2003
[11/26/03] From Technical Services: There needs to be a utility
easement across Lot 1 to service Lot 2.
Number: 11 Created: 11/26/2003
[11/26/031 From Technical Services: The text does not meet City
scanning standards.
Number: 24 Created: 11/26/2003
(11/26/031 Radial curb returns required at drive entrances.
Number: 25 Created: 11/26/2003
[11/26/031 The emergency access easement requires 25' inside
turning radii.
Number: 26 Created: 11/26/2003
[11/26/03] Provide utility easements to Lot 2.
Number: 45 Created: 12/2/2003
(12/2/03] Provide the Notice of Documents, see attached.
Topic: Site
Number: 19 Created: 11/26/2003
(11/26/031 Remove contours and utilities.
Number: 20 Created: 11/26/2003
[11/26/031 Spell out all UE and DE labels to read "Utility
Easement" and "Drainage Easement".
Number: 21 Created: 11/26/2003
(11/26/031 Remove the "Existing 20' Gravel Driveway" label and
replace with a 1124' Emergency Access and Utility Easement" label.
Topic: Utility
Number: 27 Created: 11/26/2003
[11/26/031 Sheet 3 - Provide a curve table and dimensions for the
sidewalk along LaPorte Avenue so that they can lay this out in the
field.
Page 3
Number: 48 Created: 12/3/2003
[12/3/03] There appears to be an error in the east property lines
of Lot 1 and the road right-of-way. The two distances of 319.98, +
42.00' do not add up to 350.001. They would equal 361.981.
Topic: Site
Number: 49 Created: 12/3/2003
[12/3/03] Please see red -lined Site Plan for Current Planning
comments.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 12 Created: 11/26/2003
(11/26/031 This development is responsible for the design and
construction of LaPorte Avenue along their frontage. Please revise
all plan sets to include this requirement.
Number: 13 Created: 11/26/2003
[11/26/03] See Appendix E6 for scanability requirements. The
current plan sets do not meet the City's scanning standards.
Number: 14 Created: 11/26/2003
[11/26/031 Please revise all plan sets to provide driveway access
to LaPorte Avenue in accordance with detail 707.
Number: 15 Created: 11/26/2003
(11/26/031 Provide utility easements to Lot 2.
Number: 16 Created: 11/26/2003
[11/26/031 Do not show the actual building but provide a building
envelope instead.
Number: 17 Created: 11/26/2003
[11/26/031 The proposed sidewalk shown along LaPorte Avenue needs
to tie into existing. Taper and terminate as shown on the redlines.
Number: 18 Created: 11/26/2003
(11/26/031 Show the Ditch Company's easement on all plan sets and
provide a New Mercer Signature block on the various plan sets.
Number: 23 Created: 11/26/2003
(11/26/03] Coordinate the comments among the various plan sets so
that they all provide the same information.
Number: 36 Created: 11/26/2003
[11/26/031 Is the placement of the Emergency Access drive
acceptable to PFA? The current configuration has the fire truck
staging approximately 50' away from the building. That leaves only
100' to the back of the furthest part of the building in order to
meet fire code. Is the buildings eventual placement going to meet
that requirement or does the emergency drive need to be adjusted
now?
Page 2
STAFF PROJECT REVIEW
CitYof Fort Collins
a
Stewart & Associates Date: 12/3/2003
c/o Jack Blake
103 South Meldrum Street
Fort Collins, CO. 80521
Staff has reviewed your submittal for HECKART SUBDIVISION - TYPE I
(LUC), and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Landscape
Number: 50 Created: 12/3/2003
[12/3/03] Please see red -lined Landscape Plan for Current Planning
comments.
Number: 51 Created: 12/3/2003
[12/3/03] The 2 proposed Autumn Purple Ash trees to be used as
street trees along LaPorte Avenue are not on the City's Approved
Street Tree List. Please make another selection from the list.
Topic: Plat
Number: 46 Created: 12/3/2003
[12/3/03] Len Hilderbrand of Xcel Energy offered the following
comments:
a. The proposed 5' utility easements are not adequate. If the
owner requests natural gas then the 5' easements would need to
be unencumbered.
b. No fences, trees, or bushes can obstruct the installation of
gas lines.
C. Is it possible to make the access drive a utility easement?
Number: 47 Created: 12/3/2003
[12/3/03] Rob Irish of City Light & Power offered the following
comments:
a. Power for this property will come from LaPorte Avenue.
b. The owner will need to coordinate the electric meter location
with Light & Power.
C. Any modifications or relocations of existing electric
facilities will be at the property owner's expense.
d. The property owner will be responsible for'residential
development charges.
Page I