Loading...
HomeMy WebLinkAboutHECKART SUBDIVISION - PDP - 35-03 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWM HECKART SUBDIVISION Explanation of Conceptual letter issues Jenny Nichols - Zoning a,b,c - We are submitting a subdivision plat with lot sizes above 5445 square feet. d - One building is existing and the new building will meet setback requirements. Roger Buffington - Water/Wastewater a, b, c, a and f - Acknowledged d - Separate services are designed on the utility plans and the meter pit close to the street. Rob Irish - Light and Power a - Utility easements are provided on the proposed subdivision. b and c - Acknowledged Glen Schlueter - Stormwater a and b - Acknowledged c and d - A drainage report and plan are submitted for review using the Impervious factor of that basin as control. Doug Moore - Natural Resources a - A fugitive dust control permit is not required for one house. b -16 landscape plan submitted fuse. c - Acknowledged d - 50' wide buffer may not apply for this development but ther is also no development within 50 feet of the ditch proposed. Parks Planning Department - Acknowledged Marc Virata - Engineering a and b - Acknowledged c - TIS not required per phone conversation on 8/25/03 with Eric Brache d - This project is dedicating a total 1/2 width of 42 feet. e - The sidewalk is designed but the curb is proposed for escrow until a district is formed. f- Subdivision plat submitted g - See utility plans for driveway and also emergency driveway h - Acknowledged Tom Reiff- Per Eric Brache no TIS required IIE KAKT nun6 hplm u1J &t