HomeMy WebLinkAboutFEEDER SUPPLY - FDP - FDP130039 - CORRESPONDENCE - REVISIONS (3)Water — Wastewater Engineering
Comment #1 Water service sizing calculations provided for apartments.
Comment #2 — Complied with.
Comment #3 — Complied with.
Comment #4 — Complied with.
Comment #5 — Complied with.
Comment #6 — Complied with.
Comment #7 — Complied with.
Comment #8 — Complied with.
JP/sjw
Comment #22 — Schrader Oil Company perpetual easement recording number is 584871.
Forestry
Comment #1 —Complied with.
Comment #2 — Complied with.
Comment #3 — Complied with.
Light & Power
Comment #1 — Acknowledged and complied with.
Comment #2 — There is no new subdivision plat. The relevant plat is the original Fort Collins
plat.
Comment #3 — Will do.
Poudre Fire Authority
Comment #1 — To be complied with.
Stormwater Engineering
Comment #1 — Complied with.
Comment #2 — Complied with.
Comment #3 — Complied with.
Comment #4 — Complied with.
Comment #5 — Complied with.
Technical Services
Comment #1 —12 — Lines over text, sheet numbering, text in hatched areas and other redline
comments are complied with for building elevations, construction drawing, landscape plans and
site plans.
Traffic Operation
Comment #1 — Modified as requested.
Comment #4 — Utility, drainage and emergency access easements will be dedicated by separate
document.
Comment #5 — — City will have designed work for Willow improvements completed by June and
engineering/construction documents completed by October.
Comment #6 — City will have designed work for Willow improvements completed by June and
engineering/construction documents completed by October. This will enable us to avoid
installing interim improvements and allow us to complete final public improvements at that time.
Comment #7 — Repay amount obligation for local portion of Linden Street improvements shall
be included in development agreement.
Comment #8 — Complied with.
Comment #9 — Note has been added.
Comment #10 — Resolved.
Comment #11 — Profile added and storm main has been incorporated into the utility plans.
Comment #12 — City will complete ultimate design by June and engineering and construction
plans by October.
Comment #13 — City will complete ultimate public improvements design by June and
engineering/construction drawings by October.
Comment #14 - City will complete ultimate public improvements design by June and
engineering/construction drawings by October.
Comment #15 — Complied with.
Comment #16 — Complied with.
Comment #17 — Complied with.
Comment #18 — Complied with.
Comment #19 — Complied with.
Comment #20 — We cannot find any cleanout or other concrete evidence of existing Feeder Mill
building sewer service location, although we believe it probably connects from Linden and
comes straight in front of building.
Comment #21 — Barricade has been added.
To: Ted Shepard
From: Jon Prouty
Re: Feeders Supply, FDP 130039, - Response to November 13, 2013 Comments
Date: January 20, 2014
Current Planning
Comment #1 - We are required to have a 30 ft. drive because a) this is an access easement for the
Schrader Property, which we are obligated to honor and b) the fire department required 30 feet
behind the apartment building. We are, however, able to reduce the paved portion of the drive
by about 4 ft. where it intersects Linden. In lieu of pavement, there will be an approximate 4 ft.
border of gravel adjacent to the Thompson Building.
Comment #2 — Transformer has been relocated and there will now be a single transformer in a
landscaped area to the east of Feeders Supply Mill Building.
Comment #3 — Complied with.
Comment #4 — Complied with.
Comment #5 — Complied with.
Comment #6 — Tree has been relocated.
Comment #7 — Has been changed to two spruce trees.
Comment #8 — Complied with.
Comment #9 — Lighting plan provided and cut sheets and requested general note.
Comment #10 — Complied with.
Engineering Development Review
Comment #1 - This additional amount due was paid.
Comment #2 — Tree has been relocated. Drive has been modified to reduce drive scale and to
solve light pole conflict.
Comment #3 — Complied with.