HomeMy WebLinkAbout317 & 325 CHERRY ST., CHERRY STREET LOFTS - FDP - 29-03C - CORRESPONDENCE -ALONNO17 MtrToo pi�.k-rzH�
4'X
RNN� IRTo Qswv-I,� Y
cm-5�f4. Lu tTK J
56-�pu us -0
. Z(,O P(P(5
rl\
Ef 1P :N \/A N LA
68 n-C�L-L-
,VZ ()�p
U))L---g N?nbr
�U
N
n
rd
+� 1
N
Lk FT
71fRotL
' - -7/— t( �0--
T PoK
TO ( he zot G-
FMLK
66u7c�5
/'ff
/,� 1
1 AI�vt'll Qb
VS-W
4u (b (7-
1PLA-t
Co�C) -( (N<;- 16>
!�dZIV�vJ,E�/ ea��'epc�s -To R� R9CZM� �a
WKUP 6unP
fps �o W STD t�rv67-
�Nq,�l�t2orN
f6 p ihMftb ei-AZ%F SZ(��- l
Tvoq RuAzLzFv �1ft(zlz SGz
c o�vcT� VAULT tv(ta-6
2 `` Gd�ae
Lj/ rL.P.Z-
VI
2' METAL SIDEWALK
CULVERT AND CONC. 3
CHASE (SEE DETAIL) N
RELOCATE EXISTING
1.00
WATER METER
�s>z
IF,
'ss n
° (e l
4.
—4985.0�
E"—
d- ,.._...__.d-
d _.
e °
d
W d> �•y, I a�
ce 4986.0 s
L 0 .
4986.5 4986 O cId 17
F� 4
T-
a
tl
F E E n c 0 V
9
tl,
` CONNECT SUMP PUMP OUTLET �, `
TO INTERNAL SEWER SYSTEM.
N,
SEE MECHANICAL FOR FINAL `
LOCATION.
t t.9.00 _".
EXISTING ELECTRIC CABINET^= AV" 6
s
TO BE RELOCATED
COORDINATE FINAL LOCATION
WITH CITY OF FORT COLLINS
UTILITIES
Y T
l
G p� o
2.0%'
Project
CLB:
Date:
02/04/05
Scale:
NA
Designed By:
JOD
325 CHERRY STREET
TRASH ENCLOSURE
CONNECT TO EXISTING SERVICE AT EXISTI ..
CURB STOP. EXTEND SERVICE EAST OF N
DRIVEWAY. PLACE NEW CURB STOP AND
METER PIT PER DETAIL, SEE SHEET 8/9 .
RECONNECT TO EXISTING SERVICE TO HOU`
OPEN EXISTING CURB STOP AND PULL STC
BOX AND ABANDON EXISTING OPEN CURB
IN PLACE.
24 LFt 3/4" TYPE K
%— COPPER WATER SERVICE
/< " a
°"
° 4985
TAPER CURB a~ °
d (SEE DETAIL)
,,.. "d
e de IC
< _..........: a ...:....._. da
4985.5
s
4986.0
4986.5 pfl
tj
e
I I
p2� RELOCATED
rn CURB
�n STOP
RELOCATED
3/4" METER PIT
-BELOW GRADE DUMPSTER
(DESIGN BY OTHERS)
LID ELEV = 86.10
INSTALLS SCH40 CONDUIT u
FOR SUMP PUMP POWER. SEE
ELECTRICAL FOR FINAL LOCATION.
�p1 EXISTING BUILDING
1 1'X1' HEADER
CURB
i
a
CIVIL EN123INEER6
1435 West 29th Street. Loveland. Colorado, 60536
Phone: (970)461-2661. Fae (970)461-2665
srr.dmrchilengineas.com
1
Sheet
1
Sheets
CAMBIUM
DEVELOPMENT INC.
2-5-05
ATTN: Katie Moore, City of Fort Collins Engineering Department
RE: Cherry Street Lofts dumpster enclosure
CC: Anne Aspen, Glen Schlueter, Jeff Hill
Dear City Staff,
Please find attached, a series of drawings for the subterranean dumpster enclosure we
discussed at the staff review meeting of February 2, 2005.
Also note the following items :
Dumpster vault will have 6 inch, reinforced concrete walls and floor.
Vault will be water sealed, and contain a submersible sump pump as shown.
The sump pump drain line for incidental rainwater seepage or occasional rinsing will feed
into sanitary sewer system as requested. Per my discussion with Jeff Hill, we will explore
the possibility of piping directly into the existing sewer line that feeds north to Cherry
Street. This line will be used only if it is to be found in suitable condition. If is shows
significant degradation, we will abandon that line and pipe into the new sewer line inside
the building as shown in the attached civil drawing. Drain line will be sealed against
backflow, both gaseous and liquid.
The main hydraulic pump for the lid will be located in a sealed, separately accessible
vault as shown in the civil engineering drawings directly east of the main vault. the vault
will be rated for electrical use and watertight.
The main lid for the dumpster will be water sealed and include two smaller deposit lids
for the residents to place trash bags in. The lids will be engineered to support truck
caliber loads. Each lid will be self -closing and self locking and include an emergency
panic exit bar on the interior.
If you should have any other questions on this particular\r item, please feel free to contact
me directly.
524 (970) 690-2833