Loading...
HomeMy WebLinkAbout317 & 325 CHERRY ST., CHERRY STREET LOFTS - FDP - 29-03C - CORRESPONDENCE - REVISIONS (3)44: The additional off -site survey information and additional alley design work has been provided in the Utility Plan set as requested. Also see DMW responses. 54: See comment responses DMW Civil Engineers. 55: See the attached drainage report. 62: See comment responses DMW Civil Engineers. Transportation Planning Comments 59: Acknowledged. Water/Wastewater Comments 56: See comment responses DMW Civil Engineers. 57: See comment responses DMW Civil Engineers. 58: Trees have been shifted to provide adequate separation. Zoning Comments See revised site plan. V12: See revised site plan. 3: A variety of shrubs have been integrated as requested. 5: Actual height is now listed on sheet 1 of 5, and also on the building elevations. ✓6: Storage closets are part of the garage building and have been clarified on the site plan. /: Modifications have been referenced on sheet 1 of 5 on general note 46. / / : See the site plan and landscape plan. The bike rack is labeled. Cherry Street Lofts Response to Final Compliance Comments January 19, 2005 from M. Torgerson Architects Current Planning Comments ✓24: The buildings on the lot to the south are now shown. The curb, -gutter and sidewalks are shown across /the street to the north and west. TIK // , / 26: See the revised site plan. The western access doors for the garage are shown. 71K 0: The Building Inspection Department's comments have been forwarded to Dana Lockwood, who is the LI project architect. He will incorporate the comments into the building permit application. Engineering Comments 15: The additional off -site survey information and additional alley design work has been provided in the Utility Plan set as requested. Also see DMW responses. 17: See comment responses DMW Civil Engineers. 18: See comment responses DMW Civil Engineers. 12: Two copies of the soils report are included in the submittal. 13: Both the M. Torgerson Architects drawings and the DMW drawings have been revised to meet scalability requirements. 20: See comment responses DMW Civil Engineers. 21: Redline comments have been incorporated into the revisions. 22: See comment responses DMW Civil Engineers. 38: See the utility plan set for the new pole location. The pole is only moving slightly to the west. 40: Acknowledged. 52: The building design has been revised and there is no longer any portion of the building overhanging the right-of-way. 53: The footing detail for the foundation wall has been revised so that no portion of the wall will be constructed within the right-of-way. No part of the dumpster enclosure is proposed within the right-of- way. 61: See comment responses DMW Civil Engineers. 11: The sidewalk has been moved to that the parkway is not 8 feet wide. Light and Power Comments 51: See comment responses DMW Civil Engineers. Stormwater Comments