HomeMy WebLinkAboutSHAW REPLAT - PDP - 36-03 - CORRESPONDENCE - (3)• r designated in the design criteria as established by the City. (c) A description of the hydrologic conditions of the site with analysis of water table fluctuation and a statement of site suitability for the intended construction and proposed _ X landscaping. (6) VV Draina e report (4 copies) and calculations. �� (7) lists of names and addresses of all owners of record of real property within five hundred (500') feet (see Supplemental Notice Requirements of Section 2.2.6 of the Land Use Code for further information) of the property lines of the parcel of land for which the overall development plan is proposed, exclusive of public right-of- way. lists shall be typed on mailing labels (33 labels per sheet), the other list shall be a reproducible copy of those labels. (8) A Transportation Impact Analysis (6 copies) prepared in accordance with the Transportation Impact Analysis Guidelines. (9) One (1) rendered set (unfolded), ten (folded) sets of the plat and 81/2" x 11" (Photo Mechanical Transfer) PMT of subdivision plat to be submitted prior to the public hearing. (10) A list of street names proposed for use in the development. (11) Other information and data as the Director may require for full and complete consideration of the development. Rcviscd May 31, 2002 3 Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 21 Created: 1/30/2004 (1/30/041 Water services may not cross adjacent lots. Adjust water service for lot 3 to avoid crossing corner of lot 2. Show locations of existing gas and electric mains. Maintain 4 feet minimum separation between curb stop/meter pits and all gas and electric lines. See utility plans and replat for other comments Be sure and return all redlined plans with any re -submittal. ************************************************************** If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6341. Yours Truly, Steve Olt, City Planner cc: Katie Moore, City Engineering John Shaw, Property Owner Page 4 Number: 23 Created: 2/4/2004 [2/4/04] Please see redlines for any additional comments. Number: 24 Created: 2/4/2004 [2/4/04] Utility easement widths on the utility plan don't match the plat. Please have them match the plat. Number: 25 Created: 2/4/2004 [2/4/04] Driveways are required to be straight for 25' from the curb. Please reconfigure the driveway off of Elm. Number: 26 Created: 2/4/2004 [2/4/04] Concentrated flows and flows from areas greater than 650 s.f. are not allowed to flow over a public sidewalk, and this is what is proposed as shown on the grading plan. Please re -grade and/or provide an under -walk drain (D-10). Topic: Plat Number: 22 Created: 2/4/2004 [2/4/04] Please provide the dimensions of the width of the driveway easement as it abuts the ROW and the distance from the lot corner to the driveway easement. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 27 Created: 2/6/2004 Please include half of Elm Street and half the alley in the impervious calculations. The alley should be assumed paved for the purpose if this calculation. The allowed impervious area without detention is 50o for this basin. Number: 28 Created: 2/6/2004 The existing inlet needs to be in good condition to be a part of this design due to increased flows. If the inlet is not in good condition, a new inlet per current City standards would need to be installed. Topic: Erosion/Sediment Control Number: 29 Created: 2/6/2004 Erosion Control should still be looked into and a design shown. There should be protection for Arthur Ditch (silt fence, etc.) and inlet protection for the inlet on Elm Street. The escrow is adequate. Page 3 Also, a letter of notification to Affected Property Owners (APO) within 500' of the property, in all directions, must be mailed out by the Current Planning Department at least 14 days prior to the public hearing. This requirement is set forth in Section 2.2.6 of the City's Land Use Code. I see no record of an APO list being included in the original submittal of the Shaw Replat and I find no APO list in our files. One must be submitted as soon as possible (see attached information about the APO submittal requirement), so that the public hearing can be scheduled and Affected Property Owners appropriately notified. Topic: Plat Number: 30 Created: 2/11/2004 (2/11/041 Wally Muscott of the Technical Services Department offered the following comments: a. The legal description does not close or match the plat. The plat, as drawn, closes. b. The plat name does not match the Ownership & Subdivision statement. C. The Basis of Bearings does not match the monumentation described on the plat. Please contact Wally, at 221-6605, if you have questions about these comments. Department: Engineering Issue Contact: Katie Moore Topic: General Number: 8 Created: 11/21/2003 [2/4/04] How the alley ROW was dedicated was not addressed. [11/21/031 How was the ROW for West St, Elm St. and the alley originally dedicated? Number: 9 Created: 11/21/2003 [2/4/04] A FYI reminder. [11/21/03] A Development Agreement will be needed for this subdivision to address concerns about the alley and sidewalk improvements. The alley will have to be designed and constructed if more than one dwelling unit takes access off of it. The current sidewalk along Elm St does not meet standards, so each lot would be responsible for constructing a sidewalk to standards as it develops. Page 2 0 STAFF PROJECT REVIEW Citvof Fort Collins Stewart & Associates Date: 2/11/2004 c/o_Jack Blake 103 South Meldrum Street Fort Collins, CO. 80521 Staff has reviewed your submittal for the SHAW REPLAT - TYPE I (LUC), and we offer the following comments: ISSUES: Department: Current Planning Topic: Gas Service Number: 31 [2/11/04] Len Hilderbrand of Xcel following comments: Issue Contact: Steve Olt Created: 2/11/2004 Energy offered the a. Gas meters will need to be located on the west wall of a building on Lot 2 and the east wall of a building on Lot 3 to meet the minimum clearances to water and sanitary sewer. b. There is an existing gas main that lays 21' north of the south right-of-way line of Elm Street. Street/asphalt cuts will be required to install gas services. Topic: General Number: 32 Created: 2/11/2004 [2/11/04] There are still some discrepancies between title/names shown the plat and the utility plans. In all cases, the title/name should be Shaw Replat, not PDP. Number: 33 Created: 2/11/2004 [2/11/04] The replat and utility plans are in a condition that this request can now be scheduled for an administrative public hearing. There are items that have to be addressed and changes made; however, this can be done through final plan checks after the public hearing. Steve Olt will assist you in scheduling the public hearing. It will take place some weekday evening, probably starting at 6:00 p.m. and will be held in a conference room at 281 North College Avenue. The administrative public hearing officer is yet to be identified and, therefore, availability is unknown. Page 1