HomeMy WebLinkAboutSHAW REPLAT - PDP - 36-03 - CORRESPONDENCE -Department: Stormwater Utility
Topic: Drainage
Number: 34
Issue Contact: Wes Lamarque
Created:3/9/2004
The Swale at the back of the lots needs to be included in the drainage
easement. The Swale can be moved closer to the lot line, or the drainage
easement can be enlarged.
This item has been scheduled for an administrative public hearing on Tuesday,
March 23, 2004, beginning at 5:30 p.m., at 281 North College Avenue. The
issues and concerns expressed in this letter can be addressed with your Final
Compliance plan submittal after the public hearing. Be sure and return all red -
lined plans when you submit Final Compliance.
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt,
City Planner
cc: Katie Moore
John Shaw
Current Planning file #36-03
Page 2
6 STAFF PROJECT REVIEW
City of Fort Collins
Stewart & Associates Date: 03/18/2004
c/o Jack Blake
103 South Meldrum Street
Fort Collins, CO. 80521
Staff has reviewed your submittal for SHAW REPLAT - TYPE I (LUC), and we
offer the following comments:
ISSUES:
Department: Engineering
Topic: Oenerai
Number: 8
Issue Contact: Katie Moore
Created:11/21/2003
[3/2/04] Thank you for letting me know in the comment letter how the ROW
was dedicated, but it should be labeled on the plat as well. See redlines.
[2/4/04] How the alley ROW was dedicated was not addressed.
[11/21/03] How was the ROW for West St, Elm St. and the alley originally
dedicated?
Number: 9
Created:11/21/2003
[3/2/04] [2/4/04] FYI reminder
[11/21/03] A Development Agreement will be needed for this subdivision to
address concerns about the alley and sidewalk improvements. The alley will
have to be designed and constructed if more than one dwelling unit takes access
off of it. The current sidewalk along Elm St does not meet standards, so each
lot would be responsible for constructing a sidewalk to standards as it develops.
Number: 23 Created: 2/4/2004
[3/2/04] [2/4/04] Please see redlines for any additional comments.
Number: 25
Created:2/4/2004
[3/2/04] A variance request for this item was received and approved.
list this approval in the general notes.
[2/4/04] Driveways are required to be straight for 25' from the curb
reconfigure the driveway off of Elm.
Please
Please