Loading...
HomeMy WebLinkAbout325 CHERRY STREET - MODIFICATION OF STANDARDS - 29-03 - REPORTS - RECOMMENDATION/REPORT325 Cherry Street - Modification of Standards, File # 29-03 September 4, 2003 P&Z Meeting Page 7 G.. Staff finds that strict application of such a standard would render the project practically infeasible because the site is not large enough to accommodate the proposed redevelopment and on -site parking. 6. RECOMMENDATION: Staff recommends approval of the modification request with the following two conditions: A. that the on -street parking be successfully reconfigured as drawn in the option D diagram; and B. that the future project qualifies as "affordable housing" as determined by Advance Planning staff. 325 Cherry Street - Modification of Standards, File # 29-03 September 4, 2003 P&Z Meeting Page 6 important community need specifically and expressly defined and described in the City's Comprehensive Plan because the waiving the off-street parking requirements would encourage housing to be located in a mixed -use building. E. Finally, staff finds that strict application of such a standard would render the project practically infeasible because the site is not large enough to accommodate the proposed redevelopment and on -site parking. 5. FINDINGS OF FACT/CONCLUSION: A. The requested 325 Cherry Street - Modification of Standards, File # 29-03 is subject to . review by the Planning and Zoning Board. B. Staff finds that the granting of the modification with the recommended condition would not be detrimental to the public good because conveniently located on -street parking spaces would be provided, which would satisfy new parking demand, and pedestrian mobility along Cherry Street will be enhanced. C. Staff finds that the granting of the modification with the recommended condition would satisfy the general purpose of the standard equally well or better than a plan that satisfies the standard because an implemented option D configuration increases the quantity of adjacent on -street parking, which in this case is just as safe, efficient and convenient as for vehicles, bicycles, pedestrian, and transit as off-street parking would be. D. Staff finds that the granting of the modification would substantially address an important community need specifically and expressly defined and described in the City's Comprehensive Plan because a mixed -use redevelopment of the site (with a parking configuration as shown in option D) revitalizes an underutilized property by providing redevelopment with a mix of land uses in a configuration that enhances pedestrian links, while still providing for the needs of the cars. E. Provided that the Planning and Zoning Board approves the modification request with the condition that the project qualifies as "affordable housing" as determined by Advance Planning staff, then staff finds that the modification substantially addresses the community's need by creating affordable housing opportunities. F. Staff finds that the granting of the modification would substantially address an important community need specifically and expressly defined and described in the City's Comprehensive Plan because the waiving the off-street parking requirements would encourage housing to be located in a mixed -use building. 325 Cherry Street - Modification of Standards, File # 29-03 September 4, 2003 P&Z Meeting Page 5 "Existing underutilized commercial and industrial areas will be provided opportunities for mixed -use redevelopment, revitalization and economic growth, while improving upon their unique and positive qualities. Existing development will be encouraged to provide opportunities for a mix of land uses and activities including commercial, industrial, office, housing and retail, as well as places for entertainment, culture and leaming. Underutilized or vacant land will fill-in with building and uses, and transportation links provided between separate developments. The appearance of existing auto - oriented commercial development will be enhanced by creating a sense of identity for each area through common design elements such as landscaping, signage, and compatible architectural design. Renovation and expansion will be viewed as opportunities to make these areas more accommodating to pedestrians, bicyclists, transit uses and cars." Staff finds that the granting of the modification would substantially address an important community need specifically and expressly defined and described in the City's Comprehensive Plan because a mixed -use redevelopment of the site (with a parking configuration as shown in option D) revitalizes an underutilized property by providing redevelopment with a mix of land uses in a configuration that enhances pedestrian links, while still providing for the needs of the cars. C. Additionally, the project substantially addresses the following principle from page 114 of City Plan: "Principle HSG-2: The City will encourage the creation and expansion of affordable housing opportunities and preservation of existing housing stock." Provided that the Planning and Zoning Board approves the modification request with the condition that the project qualifies as "affordable housing" as determined by Advance Planning staff, then staff finds that the modification substantially addresses the community's need by creating affordable housing opportunities. D. Furthermore, staff contends that the project substantially addresses the following policy from page 176 of City Plan: "Policy DD-1.15 Housing. High density, multi -family residential uses will be allowed within the Canyon Avenue sub -district. Housing will be encouraged to locate in mixed -use buildings." In 1997, at the time of the adoption of this language, the Canyon Avenue sub- district of the Downtown zone district included much of what is now the Civic Center sub -district (including this site), therefore this language applies. Staff finds that the granting of the modification would substantially address an 325 Cherry Street - Modification of Standards, File # 29-03 September 4, 2003 P&Z Meeting Page 4 4. ANALYSIS OF MODIFICATION REQUEST This application is a request to waive the requirement to provide up to 14 off-street parking spaces. The applicant contends that rather than serving the future redevelopment's parking needs on the project site, the parking demand generated by the redevelopment can easily be accommodated on -street. The four parking option diagrams (options A through D) provided by the applicant were discussed among Advance Planning, Current Planning, Engineering, Traffic Operations, and Transportation Planning staff. The staff consensus is that staff can support the modification request with an on -street parking configuration as shown in option D. Currently, North Meldrum has diagonal parking south of the site, between Laurel Street and Maple Street, and parallel parking for the two remaining blocks north of Maple Street. Currently driveway cuts along the north side of the existing 325 Cherry Street building preclude parallel parking along Cherry Street. Option D proposes to convert the segment of North Meldrum Street between Maple Street and Cherry Street from parallel parking to diagonal parking, and to provide parallel parking on Cherry Street in front of the building. Cherry Street already has parallel parking established east and west of the site. Provided that the Planning and Zoning Board approves the modification request with the condition that the on -street parking be successfully reconfigured as drawn in the option D diagram, staff finds that the granting of the modification would not be detrimental to the public good because conveniently located on -street parking spaces would be provided, which would satisfy new parking demand, and pedestrian mobility along Cherry Street will be enhanced. Staff contends that the proposed project would, without impairing the intents and purposes of the LUC, substantially address an important community need specifically and expressly defined and described in the city's Comprehensive Plan, adopted policy, ordinance or resolution, and that the strict application of such a standard would render the project practically infeasible as follows: A. As stated in 3.2.2(A) of the LUC, the general purpose of the parking requirements of the LUC are to ensure that "parking and circulation aspects of all developments are well designed with regard to safety, efficiency and convenience for vehicles, bicycles, pedestrians and transit, both within the development and to and from surrounding areas." Staff finds that the granting of the modification would not impair the intents and purposes of the LUC because an implemented option D configuration increases the quantity of adjacent on - street parking, which in this case is just as safe, efficient and convenient as for vehicles, bicycles, pedestrian, and transit as off-street parking would be. B. Staff contends that the project substantially addresses the following goal from page 18 of City Plan, 325 Cherry Street - Modification of Standards, File # 29-03 September 4, 2003 P&Z Meeting Page 3 (a) the general purpose of the standard is satisfied equally well or better than a plan that satisfies the standard, or (b) the proposed project would, without impairing the intents and purposes of the LUC, substantially address an important community need specifically and expressly defined and described in the city's Comprehensive Plan, adopted policy, ordinance or resolution, and that the strict application of such a standard would render the project practically infeasible, or (c) strict application of the standard sought to be modified would result in unusual and exceptional practical difficulties or exceptional or undue hardship due to exceptional physical conditions unique to such property. 3. APPLICANT'S REQUEST The applicant requests a modification to Section 3.2.2(K)(1)(a) of the Land Use Code to waive the requirement of off-street parking spaces for up to 9 one -bedroom mixed -use dwellings which would equate to up to 14 parking spaces. The applicant has proposed that the modification request meets the requirements of LUC 2.8.2 Modification Review Procedures (H) Step 8 (Standards). Please see the attached written justification by the applicant. The applicant submitted drawings of 4 different alternatives to provide parking to serve the site, and one conceptual building elevation. See the following attached drawings: • 325 Cherry Parking Option A; • 325 Cherry Parking Option B; • 325 Cherry Parking Option C; 325 Cherry Parking Option D; and • Conceptual Elevations — Cherry Street Lofts 325 Cherry Street - Modification of Standards, File # 29-03 September 4, 2003 P&Z Meeting Page 2 COMMENTS 1. BACKGROUND The surrounding zoning and land uses are as follows: N: NCB —Existing residential (Martinez Park Neighborhood); LMN — Existing residential (Martinez Park Neighborhood); POL — Existing Martinez Park; NW: NCM — Existing residential (Martinez Park Neighborhood); W: NCB — Existing residential (Martinez Park Neighborhood); NCM — Existing residential (Martinez Park Neighborhood); S: D (Civic Center Sub -district) — Existing residential (Martinez Park Neighborhood), existing auto repair shop, existing municipal government offices; E: D (Civic Center Sub -district) — Existing (Martinez Park Neighborhood), historic trolley barn, municipal fleet parking lot. The property is located at the southeast corner of Cherry Street and North Meldrum Street, and is included in the area of the original town plat of 1873. The existing 5000 square foot building was built over 40 years ago as a wood shop. The 143 feet by 35 feet building is sited on a lot 149 feet by 49 feet in size. The current use is light industrial. The building which was originally constructed in compliance with its zoning, today it is a non -conforming permitted light industrial use in the Downtown - Civic Center Subdistrict zone district. In the snowstorm of March 2003, approximately a third of the building (1584 square feet) completely collapsed under the snow load. The owner has up to 6 months from the date of the calamity to obtain a building permit to rebuild the collapsed portion of the building without the requirement to bring the existing non- conforming use into compliance with the Land Use Code. The applicant intends to submit a Project Development Plan application to redevelop the building as a mixed -use building with 9 one -bedroom mixed -use dwellings and commercial artist studio spaces. 2. THE MODIFICATION PROCESS (A) Section 2.8.2(H) of the LUC specifies that in order to approve a modification the Planning and Zoning Board must find that: (1) the granting is not detrimental to the public good, and that (2) the plan as submitted would satisfy one of the following: l� ITEM NO. 6 MEETING DATE 9/4/03 STAFF Troy Jones Citv of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: 325 Cherry Street - Modification of Standards, File # 29-03 OWNER: Greg Glebe Xylem Design Inc. 325 Cherry Street Fort Collins, CO 80521 APPLICANT: Mickey Willis Paradigm Realty & Development 2969 Spring Harvest Lane Fort Collins, CO 80528 PROJECT DESCRIPTION: The owner of the existing light -industrial building at 325 Cherry Street intends to submit an application to redevelop the building for mixed -use occupancy with commercial artist studio spaces and residential units. The Fort Collins Land Use Code would require a minimum of 14 off-street parking spaces to serve such residential units. The applicant requests a modification to Section 3.2.2(K)(1)(a) of the Land Use Code to waive the requirement that off-street parking spaces be provided for up to 9 one - bedroom residential dwelling units on the site. RECOMMENDATION: Staff recommends approval of the modification request to section 3.2.2(K)(1)(a) of the Land Use Code with two conditions. EXECUTIVE SUMMARY: This is a request for modification to the following section of the Land Use Code: 3.2.2 Access, Circulation and Parking (K) Parking Lots — Required Number of Spaces for Type of Use (1) Residential and Institutional Parking Requirements (a) Attached Dwellings - This section of the Land Use Code requires that multifamily dwellings provide 1.5 spaces for each one -bedroom residential unit. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT