HomeMy WebLinkAboutFIRST MAINSTREET BANK - FDP - 37-03A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFinal Drainage Report
First Main Street Bank
June 30, 2004
REFERENCES
DMW Civil Engineers, Inc.
I 1) City of Fort Collins, Colorado, Storm Drainage Design Criteria and Construction
Standards, Fort Collins, Colorado, May, 1997, revised 1999
2) Urban Drainage and Flood Control District, Urban Storm Drainage Criteria
Manual, Wright Water Engineers, Denver, Colorado, June, 2001.
3) Greenhorne & O'Mara, Inc., McClellands Basin Master Drainage Plan, Aurora,
Colorado, June 20, 1986
4) United States Department of Agriculture, Soil Survey of Larimer County Area,
Colorado, December 1980.
I
Page 7
t=
4-s),
I
I
I
1
I
I
I
Final Drainage Report
First Main Street Bank
June 30, 2004
DMW Civil Engineers, Inc.
consisting of silt fencing will surround areas of the proposed construction. See the
Grading and Erosion Control Plan for locations of proposed erosion control
measures. In addition to silt fence, Pond 1 will be utilized as a sediment basin for
additional sediment control.
5.5 Water Quality
Structural Best Management Practices (BMPs) are proposed for the FirstMain
Street Bank site to improve water quality of runoff as recommended by the Urban
Storm Drainage Criteria Manual. The detention pond incorporates an extended
detention basin for water quality purposes.
An extended detention basin (EDB) is a sedimentation basin which uses a much
smaller outlet that extends the emptying time of the more frequently occurring runoff
events to facilitate pollutant removal. Soluble pollutant removal can be somewhat
enhanced by providing a small wetland marsh or ponding area in the basin's bottom
to promote biological uptake. The basins are considered to be "dry" because they
are designed not to have a significant permanent pool of water remaining between
storm runoff events. However, EDB may develop wetland vegetation and sometimes
shallow pools in the bottom portions of the facilities.
Pond 1 has been designed to provide 0.16 acre feet of water quality capture volume
in addition to 0.04 acre feet of sediment storage with a water surface elevation of
4996.93. Release of the captured water is controlled by a steel plate with one
column of three 1.25" circular perforations. For detention calculation purposes, this
volume has been added to the 100-year storage requirements.
VI. CONCLUSIONS
- 6.1 Compliance with Standards
All drainage analyses have been performed according to the City of Fort Collins'
Storm Drainage Design Criteria and Construction Standards manual and the Urban
Storm Drainage Criteria Manual, Volume 3, by the Urban Drainage and Flood
Control District. A predetermined release rate of 0.5 cfs per acre was used based
on the McClellands Basin Master Drainage Plan.
I
i
7
L
Page 6
r.
Final Drainage Report
First Main Street Bank
June 30, 2004
DMW Civil Engineers, Inc.
undetained onsite flows from basin 10 are 0.1 and 0.2 cfs respectively.
Runoff from Basin 11(0.11 acres) drains to the east along a shallow swale adjacent
to Harmony Road. The peak 10 and 100-year flows from this basin are 0.3 and 0.7
cfs respectively. These flows are offsite and are undetained.
The offsite pond is assumed to discharge 42.0 cfs from the Pier Condominiums
detention pond west of Boardwalk Drive, will enter the proposed 36 inch concrete
pipe and will be routed to the northeast corner of the site where the flow will enter
a junction box. At the junction box the flow will be combined with the 18 inch RCP
pond outlet pipe as well as flow from basins 3, 0-3 that enter the inlet on top of this
box. The outlet of this junction box is an existing 36 inch storm pipe. This existing
36 inch storm pipe flows to the east along back lot lines to the existing Whalers
Cove detention pond which ultimately outfalls into McClellands Creek.
' 5.3 Detention
Detention Pond 1 is located in the northeast corner of the site adjacent to Whalers
Way. Pond 1 will utilize a single stage release consisting of a water quality control
' structure and a 6" orifice. Pond 1 detains the peak 100-year developed discharge
from the site and releases it at no more than 0.5 cfs per acre. In addition to 0.16
acre-feet of water quality containment volume, Pond 1 provides 0.79 acre-feet of
I detention volume. The maximum 100-year release from Pond 1 is 1.64 cfs with an
associated water surface elevation of 5000.00. This release rate was obtained by
taking the total area (4.82 acres) of the basins that drain into the Pond (Basins 1-5,
' 05) and multiplying them by the allowable release rate of 0.5 cfs per acre (2.41 cfs).
Then the onsite 100-yr flows (0.90 cfs) that go undetained from basins 3,9,10 (0.26
acres) were subtracted from the allowable release rate for these basins (0.26 acres
' * 0.5cfs/acre=0.13 cfs). This undetained 0.77cfs was subtracted from the allowable
release rate of 2.41 to come up with the final allowable release rate of 1.64 cfs.
' The total required storage for this detention pond was calculated using the FAA
Rational Method. These calculations are provided in Appendix C. The total
' storage required for this pond is 0.79 acre-feet. The required Water Quality
Capture Volume (0.16 acre-feet) was added to this volume to come up with the
provided storage of 0.95 acre-feet. There is more discussion on this in the Water
Quality section of this report.
5.4 Erosion Control Plan and Criteria
The erosion control plan presented here is intended to control rainfall erosion. The
1 Erosion Control Reference Manual for Construction Sites (ECRM), City of Fort
Collins, has been referenced for this erosion control plan..
' The proposed rainfall erosion control plan during construction will consist of
temporary structural erosion control measures. Temporary sediment control
Page 5
Final Drainage Report DMW Civil Engineers, Inc.
' First Main Street Bank
June 30, 2004
' discharged into Basin 5 and the proposed detention pond via two curb openings
along the east edge of the parking areas. The peak 10 and 100-year flows from
Basin 1 are 3.7 and 9.4 cfs respectively. The peak 10 and 100-year flows from
' Basin 2 are 7.6 and 19.2 cfs respectively.
Runoff from Basin 3 (0.35 acres) drains overland north of Building C from west to
' east along the north edge of the site. Stormwater is conveyed to the detention pond
from the Basin via a proposed 18" RCP under the proposed drive entrance. The
peak 10 and 100-year flows from basin 3 are 0.8 and 2.1 cfs respectively.
1 Runoff from Basin 4 (0.25 acres) drains to the east along a shallow swale adjacent
to Harmony Road and discharged into Basin 5. The peak 10 and 100-year flows
from this basin are 0.7 and 1.9 cfs respectively. These offsite flows are routed
through the detention pond.
' Basin 5 (1.50 acres) is comprised mostly of the detention pond and landcape berms
and swales around the east and south sides of the parking areas. The peak 10 and
100-year flows from Basin 5 are 1.3 and 3.4 cfs respectively. The cumulative peak
' 10 and 100-year runoff from Basins 1 through 5 and 05 which enter the detention
pond are 12.2 and 33.1 cfs respectively.
' Runoff from Basin 6 (0.80 acres) drains to the north along the east gutter of
Boardwalk Drive. The peak 10 and 100-year flows from this basin are 3.1 and 8.0
' cfs respectively. These flows are offsite and are undetained.
Basins 7 and 07 (0.59 acres) are located at the northeast corner of the site. Runoff
' from these Basins drains undetained to a proposed storm inletrunction box at the
northeast corner of the site. This junction box combines the 36 inch RCP, carrying
offsite flow, and the 18 inch RCP pond outfall pipe. Calculations for this 36 inch
pipe are included in Appendix B. The peak 10 and 100-year flows to this inlet from
Basins 7 and 07 are 0.6 and 1.8 cfs respectively. The peak 10 and 100-year
undetained onsite flows from basin 7 are 0.1 and 0.3 cfs respectively.
Basin 8 (0.04 acres) consists of the proposed drive entrance from Whalers Way.
Runoff from Basin 8 drains overland to the north into Basin 9 where it enters the
southern gutter of Whalers Way. The peak 10 and 100-year undetained onsite
flows from basin 8 are 0.1 and 0.4 cfs respectively.
Runoff from Basin 9 (0.30 acres) drains to the east along the south gutter of
Whalers Way. The peak 10 and 100-year flows from this basin are 2.2 and 5.7 cfs
respectively. These flows are offsite and are undetained.
Runoff from Basin 10 (0.04 acres) drains overland to the south where it enters the
' swale along the north side of harmony Road. The peak 10 and 100-year
Page 4
u
1
1
Final Drainage Report
First Main Street Bank
June 30, 2004
DMW Civil Engineers, Inc.
IV. DRAINAGE DESIGN CRITERIA
4.1 Design Criteria and Restraints
Drainage design criteria specified in the City of Fort Collins Storm Drainage Design
Criteria and Construction Standards manual and the Urban Storm Drainage Criteria
Manual, Volume 3 by the Urban Drainage and Flood Control District have been
referenced in the preparation of this study. A predetermined release rate of 0.5 cfs
per acre was used based on the McClellands Basin Master Drainage Plan.
4.2 Hydrologic Criteria
The rational method has been used to estimate peak stormwater runoff from the
project site. An initial 10-year and major 100-year design storms have been used
to evaluate the proposed drainage system. Calculations made as part of this
investigation, along with other supporting material, are contained in Appendix A.
Rainfall intensity data for the rational method has been taken from rainfall intensity
data tables contained in the City of Fort Collins Storm Drainage Design Criteria and
Construction Standards manual (see Figure 3-1 a). Composite runoff coefficients
were generated using Table 3-3 and 3-4 of the City of Fort Collins Storm Drainage
Design Criteria and Construction Standards manual.
4.3 Hydraulic Criteria
The computer program "Flowmaster° has been used to analyze the capacity of
proposed pipes and chases for the site. Various spreadsheets using City of Fort
Collins criteria have been used in the design of proposed detention ponds.
V. DRAINAGE FACILITIES DESIGN
5.1 Proposed Site Development
Development of the First MainStreet Bank site will consist of a bank building and
two additional commercial. buildings. The proposed site infrastructure includes
paved parking areas with curb, gutter and sidewalk, waterline, sanitary sewer, and
storm utilities.
5.2 Developed Drainage Patterns
The developed site has been divided into eleven (11) on -site and two (2) off -site
drainage basins. Stormwater runoff will be conveyed overland to an onsite
detention and water quality pond and released into existing stormwater utilities at
the northeast corner of the site. The peak 100-year developed discharge from the
site will be released at no more than 0.5 cfs per acre in accordance with the
McClellands Basin Master Drainage Plan.
Basins 1 (0.96 acres) and 2 (1.93 acres) are comprised of a majority of the parking
on the First MainStreet Bank site. Runoff from Basins 1, 2 sheet flows across the
parking lot and along concrete gutters from southwest to northeast. Stormwater is
Page 3
MainStreet Bank site is within Flood Insurance Zone X, the areas determined to be
'outside the 500-year flood plain according to the FEMA Flood Insurance Rate Map,
_. Community -Panel No. 080102-0014 C. This FIRM panel has not been printed
because the entire panel is within Zone X.
III. DRAINAGE BASINS AND SUB -BASINS
' 3.1 Major Basin Description
The First MainStreet Bank site is within the McClellands Drainage Basin as
' identified by the City of Fort Collins Master Drainage Plan but not within any
regulatory floodplains designated by either the City or FEMA. The McClellands
Basin encompasses approximately 3.4 square miles in southeast Fort Collins. The
' storm runoff from the basin originates northeast of College Avenue and Harmony
Road and drains southeast through the Oakridge, Willow Springs, Stetson Creek
and Harvest Park developments. A single major drainageway, McClellands Creek,
conveys flow from the upper end of the basin to the downstream discharge point
along the Fossil Creek Reservoir inlet ditch. The majority of the basin is either
developed, or is being developed, with residential and commercial land areas.
1 3.2 Sub -Basin Description
Stormwater runoff from the First MainStreet Bank site drains overland generally
' from southeast to northwest at slopes ranging from 1.0% to 5.0%. Stormwater
runoff is currently conveyed from the site towards the northeast overland and in
shallow swales. An existing 24 inch concrete pipe enters the northwest corner of
the site from the existing Pier Condominiums detention pond west of Boardwalk
Drive. The existing discharge of the pond, according to the most recent Master
Plan, is 23.8 cfs. However, according to the Rafferty's Final Storm Drainage
Report, the discharge of the pond is 42 cfs. An existing channel crosses the north
portion of the site to convey the pond discharge to the east. Runoff is conveyed
from the site to the east via a 36 inch concrete pipe. This storm sewer flows to the
east along back lot lines to the existing Whalers Cove detention pond which
ultimately outfalls into McClellands Creek.
Harmony Road, Boardwalk Drive and Whalers Way are all currently developed.
Runoff from the north half of Westbound Harmony Road flows to the north and is
1 then carried to the east offsite in a shallow swale at the base of existing berms.
Runoff from the East half of Boardwalk drive flows to the north along the gutter to
an existing 2 foot combination inlet approximately 80 feet north of Whalers Way.
I.
I
The inlet drains to the existing Pier Condominiums detention pond. There is an
existing high point in Whalers Way just East of Boardwalk Drive. Runoff from the
west side of this high point flows to the aforementioned inlet. Runoff from the south
half of Whalers way east of the high point flows to the along the gutter to an existing
2 foot combination inlet located at the southwest corner of Whalers Way and
Seaway Circle approximately 150 feet east of the First Main Street Bank site.
Page 2
u
1
1
1
I
1
I
I
I
L�
Final Drainage Report
for
First MainStreet Bank
Fort Collins, Colorado
July 7, 2004
I. INTRODUCTION
1.1 Objective
This study documents the results of a comprehensive hydrologic and hydraulic
analysis of both pre and post -development conditions for the proposed First
MainStreet Bank development. The construction plans which accompany this
report are entitled Final Construction Plans for First MainStreet Bank prepared by
DMW Civil Engineers.
1.2 Project History and Previous Studies
A Master Drainage Plan for the McClellands Basin was prepared by Greenhorne
& O'Mara, Inc., dated June 20, 1986. Also, the First MainStreet Bank site has
been previously reviewed as Rafferty's PUD, a restaurant site. The previous study
by Stewart and Associates, dated November 27,1995, was approved on December
18, 1995. A portion of both reports are included in Appendices F and G,
respectively.
1.3 Mapping and Surveying
Field survey information and topographic mapping with a contour interval of 1-foot
was obtained by DMW Civil Engineers from King Surveyors, Windsor, Colorado.
Additional topography outside of the project boundary was taken from City of Fort
Collins Aerial Topography with a two (2) foot contour interval.
1.4 Site Reconnaissance
The project engineer performed site visits to the First MainStreet Bank site in Fort
Collins in October, 2003. Existing drainage patterns and structures were observed
for use in defining drainage basin boundaries and flow patterns.
II GENERAL LOCATION AND DESCRIPTION
2.1 Site Location
The site is located in the southeast quarter of Section 36, Township 7 North, Range
69 West of the 6th Principal Meridian in the City of Fort Collins, Colorado. The site
is bounded by Harmony Road on the south, Boardwalk Drive on the west, Whalers
Way on the north and The Mallards Subdivision to the east (See Vicinity Map).
2.2 Site Description
The FirstMain Street Bank site is approximately 5.2 acres of vacant land.
Vegetation on the site consists of native weeds, grasses and trees, and onsite soils
are predominantly Hydrologic Group B with some areas of Hydrologic Group C
according to the Natural Resources Conservation Service (NRCS). The site is
zoned H-C (Harmony Corridor District) and is surrounded with existing commercial
development as well as existing single family and multi family housing. The First
,.I-, Fm F� F f 1� 10 fm lm lm lm lm t� t� t� t� t� t� t� t�
j
j
Min
ILI.�'
_♦
I
VICINITY MAP rt�
SCALE: 1 "=2000' Qoo�
Final Drainage Report
' for
First MainStreet Bank
' EXHIBITS
Exhibit 1 First Main Street Bank Drainage Plan
Appendix A
APPENDICES
Developed Hydrology Computations
Appendix B
Appendix C
Developed Hydraulic Computations
Detention Pond Calculations
Appendix D
Erosion Control Calculations
Appendix E
Water Quality Calculations
Appendix F
McClellands Basin Master Drainage Plan
Appendix G Rafferty's P.U.D., Final Storm Drainage Report
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
1
I
I
Final Drainage Report for
First MainStreet Bank
TABLE OF CONTENTS
VICINITY MAP \
Page No.
I INTRODUCTION
1.1 Objective.................................................1
1.2 Project History and Previous Studies ...................... . ..... 1
1.3 Mapping and Surveying ...................................... 1
1.4 Site Reconnaissance............................:...........1
II SITE LOCATION AND DESCRIPTION
2.1 Site Location..............................................1
2.2 Site Description ............................................
1
III DRAINAGE BASINS AND SUB -BASINS
3.1 Major Basin Description ......................................
2
3.2 Sub -Basin Description .......................................
2
IV DRAINAGE DESIGN CRITERIA
4.1 Design Criteria and Constraints ................................
3
4.2 Hydrologic Criteria ...........................................
3
4.3 Hydraulic Criteria ...........................................
3
V DRAINAGE FACILITIES DESIGN
5.1 Proposed Site Development ..................................
3
5.2 Developed Drainage Patterns .................................
3
5.3 Detention.................................................4
5.4 Erosion Control ............................................
4
5.5 Water Quality ..............................................
6
VI CONCLUSIONS
6.1 Compliance with Standards ................................... 6
REFERENCES..................................................7
CIVIL ENGINEERS
July 7, 2004
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
Re: Final Drainage Report for
First MainStreet Bank
Fort Collins, Colorado
IDear Staff:
1435 WEST 29" STREET
LOVELAND, CO B0538
(970) 461 -2661
FAx (970) 461-2665
WWW. DMWCIVILENGINEERS.COM
DMW Civil Engineers is pleased to submit this drainage study for First MainStreet Bank
for your review. This report complies with technical criteria set forth in the City of Fort
Collins' Storm Drainage Design Criteria and Construction Standards manual and the
Urban Storm Drainage Criteria Manual, Volume 3, by the Urban Drainage and Flood
Control District.
We acknowledge that the City of Fort Collins' review of this study is only for general
conformance with submittal requirements, current design criteria and standard engineering
principles and practices.
If you should have any questions or comments as you review this report, please feel free
to contact me at your convenience.
Sincerely,
DMW CIVIL ENGINEERS
%�o
Jade P. Miller, P.E. (CO #33885)
Project Engineer
Final Drainage Report
for
First MainStreet Bank
Fort Collins, Colorado
July 7, 2004
Prepared for:
Mr. Les Mariotti
Chief Operating Officer
First MainStreet Financial Ltd.
P.O. Box 1159
Longmont, CO 80501-1159
Prepared by:
PIVIL&RSMIL-
1435
Project Number: 0311.00-FMS