HomeMy WebLinkAboutFIRST MAINSTREET BANK - FDP - 37-03A - CORRESPONDENCE - (4)Contact Ron Gonzales, at416-2864, or Mike Chavez, at 416-2869, for this
information.
Current Planning:
1. Len Hilderbrand of Xcel Energy indicated that gas service to the bank may be
able to connect to the gas main in Boardwalk Drive instead of the main in East
Harmony Road (this will depend on the actual location of the gas main).
Please re -submit the number of revised copies of each document (to the Current
Planning Department) as shown on the attached Revision Routing Sheet. Another formal
round of staff review, with another staff review meeting, is not required. The issues
may be resolved through direct contact with the appropriate City departments before
mylars will be asked for. Be sure and return all of the red -lined plans when you re-
submit any revised documents.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt
City Planner
cc: Marc Virata
First MainStreet Bank
DMW Civil Engineers
King Surveyors
Current Planning File #37-03A
Page 11
a maximum height of 18". Monument signs are limited to 32 sf per side, 5' maximum
height.
The following comments were expressed at City staff review on August 4, 2004:
Engineering:
1. The sidewalk along Boardwalk Drive must be in an access & transit easement or
in the street right-of-way.
2. The location of the handicapped access ramp at the intersection of Boardwalk
Drive & East Harmony Road is awkward as it relates to the painted crosswalks.
3. The handicapped access ramp at the intersection of Boardwalk Drive & Whalers
Way should be more directional.
4. Remove the sight distance "stuff' from the Striping Plan.
5. The center turn lane in Boardwalk Drive should be continuous, even as it crosses
the access into this development site. Please check with Ward Stanford of
Traffic Operations to verify that this is correct.
6. A variance request must be submitted for the proposed access into this site
from Boardwalk Drive.
Stormwater:
1. The applicants have done what's been asked for by Stormwater.
Water/Wastewater:
1. The labeling of the water mains are not all correct.
2. Show the water and sanitary sewer mains on the Landscape Plan so that
adequate separation from the landscaping can be verified.
3. The subdivision plat is not real clear on the easement definitions. Better,
clearer information is needed.
4. The development plans indicate 4" fire lines to be used. The standard may be 6"
lines. Please check with the Poudre Fire Authority for their requirement.
Page 10
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Genera/
Number: 23 Created: 11/25/2003
[8/3/04]
[4/13/041
[11/25/03] Provide utility easements for all curb stops, fire hydrants, water mains and
sewer mains on the plat. Plat is not clear as to what is and what is not a utility
easement.
Topic: Utility Plans
Number: 91 Created: 8/3/2004
[8/3/04] Show proposed water main in all storm sewer profile views and provide
concrete encasement 10 feet each way on storm sewers at the water main crossing.
Number: 92 Created: 8/3/2004
[8/3/04] PVC water main is not an acceptable product within the City of Fort Collins
service area. Clearly label all water mains and fire lines as Ductile Iron Pipe (D.I.P.).
Number: 93 Created: 8/3/2004
[8/3/04] Provide all standard details appropriate for this development (i.e. Fire
Hydrant, sewer bedding, etc.)
Number: 94 Created: 8/3/2004
[8/3/04] Show all water and sewer lines on the Landscape Plans and maintain the
required landscape/utility separation distances.
See Site, Landscape and utility plans for other comments.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 6 Created: 11/12/2003
(7/14/04] I assume that all of the "dashed" boxes shown on Buildings A & B are
supposed to indicate wall sign locations. If so, a note to that on the plan would be nice.
Also, there still are no wall sign locations shown on Building C.
[4/5/04] The applicant has indicated that the sign locations are shown on the latest
submittal. However, I only see them shown on Bldg. A. Does that mean that Bldg's B &
C are to have no wall signs?
(11/12/03] This property is in the residential neighborhood sign district, wherein only
1 sign per exterior wall is allowed. They must indicate on the elevation drawings where
the probable wall sign locations will be. For their information, individual letter wall
signs are limited to a maximum height of 12", logos and cabinet wall signs are limited to
Page 9
Topic: Landscape plan
Number: 110 Created: 8/6/2004
[8/6/04] The Landscape Plan does not reflect the latest storm sewer locations and
alignments. Please show updated storm sewer design on the landscape plan in ghosted
line weight. Please ensure minimum separation between storm sewers and and trees
are adhered to (min. of 10 feet).
Topic: P/at
Number: 108 Created: 8/6/2004
[8/6/04] Please correct plat note to clearly say what areas are exclusively drainage
easements and make sure building envelopes are not included in blanket easements.
Topic: Utility Plans
Number: 107 Created: 8/6/2004
[8/6/04] Please provide a cross-section showing the storm sewer on the north side of
the site between the proposed building and sidewalk. Please include all other utilities
that would be there including gas and electric in that cross-section.
Please encase storm sewer crossings of waterline along Whaler's Way, at least 10 feet
on either side of the water line.
Please show 100 year H&L on all storm sewer profiles.
Add notes indicating that all storm sewers to be class 3 RCP pipe with water -tight
joints, and calling for all storm sewers to be inspected by City of Fort Collins.
Please provide a riprap detail on the plans.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 85 Created: 7/16/2004
[7/16/04] Please note that the crosswalks striping for the east side crossing Harmony
Road does not align with the new ramp. This may create a bit of a skew in the crosswalk
striping, which is OK. Please correct.
Page 8
Number: 102 Created: 8/3/2004
[8/3/04] FIRE LINE REQUIREMENT:
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line
unless hydraulic calculations can support a smaller fire line.
Department: Police Issue Contact: Joseph Gerdom
Topic: Street Design
Number: 89 Created: 8/3/2004
[8/3/04] Issues resolved. Building will have soffit lighting and landscape modified to
reduce concealment.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Erosion Contra/
Number: 20 Created: 11/25/2003
[8/6/04]
Third Review
August 3, 2004
1. The surety calculation is still incorrect. For areas greater than 5 acres, the cost
to reseed/mulch is $725/acre, you use $665.
2. If the detention area is to be landscaped, outlet protection should remain (or be
placed) on the outlet pipe until this work is completed. This should be indicated by a
note on the plan.
3. The existing Swale/ditch along the north property line carries stormwater runoff.
What is going to be done to protect downstream areas of this ditch during
construction (pipe installation) if a storm hits? Also, what is to protect Whaler's Way
during this construction and the street constructions on Boardwalk Drive and Whalers
Way
4. Please label sheet #5 as the grading and erosion control plan.
Topic: Grading Plan
Number: 106 Created: 8/6/2004
[8/6/04] The grading plan should show the existing grades of the lots to the east of
the proposed berm. Please make sure that all grading can happen within this property
and will not negatively affect the existing neighboring lots to the east.
Page 7
Number: 98 Created: 8/3/2004
[8/3/04] PREMISES IDENTIFICATION: Approved numerals or addresses shall be
provided for all new and existing building in such a position as to be plainly visible and
legible from the street or road fronting the property. 1997 UFC 901.4.4
A. In Multi -story buildings the following requirements shall pertain.
1. The first floor units shall be designated with 100's.
2. The second floor units with 200's
3. The third floor units with 300's, and so forth.
B. All brass letters and numerals shall be posted on a black background.
C. Some multi -family layouts may require address postings from the back side as well
as
the front of the buildings.
D. A counter clockwise addressing pattern shall be maintained when ever possible.
E. An addressing scheme shall be submitted to the fire department for approval prior
to
being posted on the building.
Number: 99 Created: 8/3/2004
[8/3/04] WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute
at a residual pressure of 20 psi. 1997 UFC 901.2.2.2
"NOTE: Contact Michael A. Chavez with Poudre Fire Authority at 970-416-2869 to
discuss an additional fire hydrant location and relocation of the currently proposed
fire hydrant location.
Number: 100 Created: 8/3/2004
[8/3/04] SPRINKLER REQUIREMENTS:
These proposed buildings shall be fire sprinklered.
1997 UFC 1003.2.9
NOTE: When any portion of the facility or any portion of an exterior wall of the first
story of the building is located more then 150 feet from fire apparatus access as
measured by an approved route around the exterior of the building or facility it shall
be fire sprinklered. 1997 UFC 902.2.1
Number: 101 Created: 8/3/2004
[8/3/04] KNOX BOX:
Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new
building equipped with a required fire sprinkler system or fire alarm system.
1997 UFC 902.4; PFA POLICY 88-20
Page 6
Number: 65 Created: 4/13/2004
[8/3/04] Ensure that the phasing plan sheet is given a distinct sheet number and the
title block calls it out as a phasing plan.
(4/13/04] If it is intended to not construct utility services to the other non bank
buildings at the same time as the construction of the bank (phase out the entire
development), a phasing plan in the utility plan set should be provided.
Number: 113 Created: 8/6/2004
[8/6/04] Provide detail 2501 Additions to Existing Sidewalk on the detail sheet.
Department: Light & Power Issue Contact: Janet McTague
Topic: Light d Power
Number: 84 Created: 7/13/2004
[7/13/04] Preliminary transformer locations have been selected. We'll need final
confirmation on these locations as well as C-1 forms for each building.
Department: Natural Resources Issue Contact: Doug Moore
Topic: Landscape plan
Number: 86 Created: 8/2/2004
[8/2/04] Has tree mitigation been resolved with the City's Forestry Department.
There are trees shown as being removed and mitigated, however, there are no trees
shown as being planted for mitigation.
Topic: Plat
Number: 87 Created: 8/2/2004
[8/2/04] Location map on Sheet 1 of 2 is illegible.
Department: PFA Issue Contact: Michael Chavez
Topic: Street Design
Number: 97
Created:8/3/2004
[8/3/04] REQUIRED ACCESS:
A fire lane is required. The fire lane shall be visible by painting and signage, and
maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
The criteria for a required fire lane contain several conditions that must be met.
1. The minimum width shall be 20 feet.
2. Inside turning radius shall be 25 feet and outside turning radius shall be 50 feet.
3. Compacted road base shall be used during the construction phase only. The
permanent fire lane shall consist of asphalt or concrete and shall be required to
support 40 tons
4. The fire lane shall be platted as an "Emergency Access Easement" on the final
Plat.
Page 5
- Remove the indication of striping two sets of opposing arrows between Whalers Way
and the driveway.
- Add right turn only signage directly east of the right turn arrow striping.
Number: 111 Created: 8/6/2004
[8/6/04] The minimum flowline grade is not being met for Boardwalk Drive across
Whalers Way.
Number: 112 Created: 8/6/2004
[8/6/04] Provide spot elevations for the Whalers Way/Boardwalk Drive intersection
(in accordance with LCUA55 7-27).
Topic: Transportation
Number: 15 Created: 11/24/2003
[8/3/04] No variance request was apparently submitted.
[4/13/04] While the traffic study discusses the striping design, a variance request is
still required for not meeting the driveway separation requirements.
(11/24/03] The access drive out to Boardwalk Drive is a variance to the LCUA55,
Chapter 7 with regards to its separation from Whalers Way as well as offset from the
driveway into the apartments across the street. A variance request is required from
the consultant's design or traffic engineer. Of particular concern in my opinion is the
center turn lane being shared between the Bank's entrance off of Boardwalk Drive and
the apartments across the street. With about only 40' of separation between the
drives and Boardwalk Drive, an arterial street, isn't there a possibility that the
proposed striping design will result in movements for northbound into the apartments
and southbound into the bank wanting to both utilize this center turn lane at the same
time? I'd like for the TI5 or the design engineer to address this concern as I feel it's
unsafe.
Topic: Utility Plans
Number: 14 Created: 11/24/2003
[8/3/04] We're currently in the process of finalizing the access ramp detail for
truncated domes in City right-of-way, these details will be sent out when completed.
[4/13/04] Not required at this time but, please ensure LCUA55 Detail 1606 is
included in the detail sheet.
(11/24/03] The access ramps at the intersection of Harmony Road and Boardwalk
Drive shall be "directional" as recently constructed on the Bank One site across the
street.
Page 4
Topic: Street Design
Number: 88 Created: 8/3/2004
[8/3/04] Remove the MOT approval block on sheet 8. MOT will not sign off on the
plan set.
Number: 90 Created: 8/3/2004
[8/3/04] Please provide cross slope measurements (on both the existing and additional
pavement) on each of the cross sections on sheet 10. In addition, label the elevations
at the flowline and crown.
Number: 95 Created: 8/3/2004
[8/3/04] The sidewalk along Boardwalk Drive south of the Harmony Road sidewalk
needs to be realigned such that it better aligns with the crosswalk.
Number: 96 Created: 8/3/2004
[8/3/04] The access ramp at the Whalers Way/Boardwalk Drive intersection should
not lead out to the "corner" and should direct pedestrians "north" across the street
along Boardwalk Drive.
Number: 103 Created: 8/4/2004
[8/4/04] I don't believe the striping plan for Boardwalk Drive is correct. I was under
the impression that Traffic Operations required a continuous center turn lane for
Boardwalk Drive instead of creating the striped turning pockets.
Number: 104 Created: 8/4/2004
[8/4/04] Remove the sight distance line from the signing and striping plan as well as
the shaded additional street width notation, it makes the striping plan difficult to
read.
Number: 105 Created: 8/4/2004
[8/4/04] The striping plan shows that the new eastern edge of the north bound
through lane does not coincide with the seam for the new pavement edge. The patching
of the street should be shown to the center of the new through lane to prevent the
pavement seam from being within the wheel path of vehicles.
Number: 109 Created: 8/6/2004
[8/6/04] In discussion with Traffic Operations, the following comments are offered
on the singing and striping plan:
- Remove the shading, the showing of utilities, and sight distance hatching.
- Continue the center lane striping across the access to the site off Boardwalk Drive
(there should be no break in the striping from Whalers Way to Harmony Road).
Page 3
- A note is required on the plat stating: "Any future widening of Boardwalk Drive at the
intersection of East Harmony Road will require modification to CDOT's existing deeded
access control line."
Topic: Plat
Number: 11 Created: 11/24/2003
[8/3/04] The right-of-way dedication has not changed from the previous submittal.
With the sidewalk now being shown outside of right-of-way, either additional right-of-
way should be dedicated or the sidewalk needs to be within an access and transit
easement.
[4/13/04] The right-of-way dedicated includes the right turn lane for the site as part
of the 56', again the right-of-way dedication of 56' should be exclusive of the
developer's right -turn lane. Ensure the sidewalk is then placed along the back of this
right-of-way.
[11/24/03] The Transportation Impact Study (TIS) indicates that all the curbs at the
Harmony Road and Boardwalk Drive intersection are at "finished" locations. The
current street width would need to change in order to allow for future double lefts;
the Bank One project across the street dedicated additional right-of-way to allow for
this future widening. Please ensure 56' of right-of-way is provided from the existing
street centerline of Boardwalk Drive; this width is exclusive of the developer's right
turn lane which is additional right-of-way required.
Number: 50 Created: 12/2/2003
[8/3/04] Technical Services offers the following comments:
-Previous comment #2 not resolved ("Being a replat of Rafferty's P.U.D.").
-Vicinity Map will not scan or duplicate.
[12/2/03] Technical Services offered the following comments:
1. Legal and plat close, see typo in curve table (redlined).
2. The "sub title" of the plat needs to say: "Being a replat of Rafferty's P.U.D.",
located in the southeast 1/4 .....
3. A "Block 1" designation isn't needed, lot 1 and lot 2 is sufficient and less confusing.
Topic: Site Plan
Number: 78 Created: 4/21/2004
[8/3/04] Show the same information regarding the sidewalk on the east side of the
driveway.
[4/21/04] The Site Plan labels the sidewalk along Whalers Way as existing.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
VF Ripley Associates Date: 08/06/2004
c/o Cathy Mathis
401 West Mountain Avenue, Suite 201
Fort Collins, CO. 80521
Staff has reviewed your submittal for the FIRST MAINSTREET BANK, FINAL
COMPLIANCE - TYPE I (LUC), and we offer the following comments:
ISSUES:
Department: Current Planning
Topic: Utility Pans
Issue Contact: Steve Olt
Number: 114 Created: 8/6/2004
[8/6/04] Dennis Greenwalt of Comcast Cable indicated that they would like to have an
on -site meeting after locates and some staking have been done by the developer so
that Dennis can see where Comcast's existing facilities are located in relationship to
the decel lane along Boardwalk Drive. Comcast's maps show that they have fiber cable
on the east side of Boardwalk Drive and Dennis is concerned that it could be damaged
with construction of the decel lane.
Number: 115 Created: 8/6/2004
[8/6/04] Rick Lee of the Building Department indicated that he is attaching a copy of
the various codes that his department will enforce. From the information submitted
there may be some exterior wall requirements due to the location on the property, per
Section 503.3. Perhaps this could be addressed at the required pre -submittal Code
Review Meeting as outlined in the attachment.
Department: Engineering
Topic: Genera/
Number: 77
[8/3/04] Left as unresolved for reference.
not addressed on the plat.
Issue Contact: Marc Virata
Created:4/21/2004
Note that the previous last comment was
(4/21/04] In discussion with CDOT, an access control permit will not be required.
However, the following items are needed to be addressed:
- CDOT would like to review the latest drainage report for the development (please
route to Engineering).
- A CDOT landscape permit will be required prior to construction.
- CDOT's access ramp detail (with truncated domes) is required for the ramp
construction at Boardwalk Drive and Harmony Road.