update the project mailing list and confirm attendance at neighborhood
4
meetings. Contact the Planning Department (221-6750) if you wish to
receive minutes of this meeting.
Did You Receive
Written NotificationAddress?
of this meeting,?
Correct
Name Address Zip
Yes
No
Yes
No
iL - Lu
�
- rsd,ao= L_ 9) ��,� Lm ✓� a s
,�
,SCC 7"T fc <76l it/d — B�SdS
14
C cif-po yfoC 2
DIv 0 i
�NIol�:•
- � DST � O �
M ED M .' w �, iH R END ® 4994.20
a .
—GRAL-E-�V.:.-
INb'. W ELEV, 499 '
Tom.-'
` / \ Po,C Sit
' MANP01 P.. n .�•' — �7 ' \ 11/
A.993.SD O
OFFICE H
r 1 22,000 sf \ o
2-story LOT 3 I W
aN�IU E J
ANJf R MANHOLE ! t I H
+ EIN - .92 1 1 I �/� -
N INV94
.:, 4` 94.34 I N 91 H
— WGkJV -:.� A 94.34
Sti:dV - 94.45—mibEfeF J v
R
It I 13
1 Q
I� 5 5 ? Q V
5 �u
oI
cQD I o LOT 2 ill 9
7
5'S k8Ir
13 LOT 1
\ 8 cl O f
Z H M E
Q o
7r M Nlr',O�I OFFICE
!^ - I?1 12,6sf
nu 4�995flf. 2-stoto ry
SL Rb1CF tit \� ..i
nC GUARD POST ... "'{' — .-- .
BANK 1 2 3 ;5 I •I
2-story
Tr/ISTEEL FPIPE �"Hu �cCF(I� ►r.�—._.�_ y _
Se balk ! Eoae
44 TRA TI
0 Ji — ... .... �., — na r...... —. .......... .....,I,o .. ....�
T _ _ -- � sT1tu
Ow iy of ort II INI
ALUM
19. Question: Is there a detention pond at the northeast corner of the site?
Answer: Yes, that is where the detention is proposed to be.
20. Question: Will all the existing Russian Olive trees along Whalers Way
be removed?
Answer: Yes, they will be.
21. Question: What about signage for the project?
Answer: The signage package is not yet finally determined. That is a
separate process through the City.
22. Question: What kind of construction time is anticipated?
Answer: First MainStreet Bank will hopefully be under construction
by August, 2004. It maybe finished by December, 2004 or
January, 2005. The bank has a 6 - 7 month construction
schedule.
23. Question: How much cut and fill will be needed?
Answer: The plans call for pretty much of a balance of cut and fill.
24. Question: Will all trees and shrubs be low water users?
Answer: They will be low to moderate water users, with an automatic
sprinkler system included. The system will be evaluated by
the City against its water conservation requirements.
4
11. Comment: Maybe the size of the complex needs to be scaled down a bit.
Response: The larger bank, previously proposed, would generate more
traffic than this proposal. The previous plan also had a
proposed daycare, which is a large traffic generator.
12. Question: How many offices will be in these office buildings?
Answer: There may be 4 separate tenants in Building B. Building C
may have 3 - 4 tenants. The parking will also help determine
the number of people in the buildings. A total of 139 spaces
are being proposed.
13. Comment: We have been told that the people along Whalers Way do not
want a street light. along that street.
14. Comment: We will have more traffic in the area and Lemay Avenue will
be very hard to get across to get to school.
15. Question: After this development is done how many cars will be on
Whalers Way?
Answer: Please call the City's Traffic Operations Department for this
information. Also, VF Ripley Associates, the applicant's
planner, can make a copy of the traffic study for you.
16. Question: Vehicles will use Whalers Way for cut -through traffic at high
speeds. Can speed bumps be built up?
Answer: They are noisy and harmful to vehicles. The City has
discontinued using them.
17. Question: Can the landscaping be done strategically to provide good
buffering to homes to the east?
Answer: The landscape plan for the development proposal does
provide for good buffering; however, VF Ripley Associates can
continue to work with neighbors on this.
18. Question: What about lighting in the parking lot?
Answer: Lights must be designed to provide cut-offs, be down -
directional, and allow no spillage.
3
3. Question: Will you do all the infrastructure and landscaping for the
site?
Answer: First MainStreet Bank will do all of the general
improvements to the entire site with development of its
building.
4. Question: How much change to the buildings can occur after approval?
Answer: Some minor changes to the architecture can occur, maybe
requiring a minor amendment that would be submitted to
the City for review.
5. Question: Can the uses change, say to a restaurant, after approval?
Answer: Not without additional City review and approval.
6. Question: I am very concerned about the additional traffic to be
generated on Boardwalk Drive and Whalers Way. What
efforts can be made to reduce the traffic?
Answer: We can do studies of existing traffic with projected traffic
from development.
7. Comment: This project will increase the traffic in the area by 10% or
less.
8. Question: How can we get a copy of the Traffic Study?
Answer: Please call Traffic Operations. They can provide you with a
study.
9. Comment: Practically speaking, people leaving this development will
have to turn north onto Boardwalk Drive.
Response: This will become 3-lane traffic on Boardwalk Drive.
10. Comment: Right now it is almost impossible to make a left,
southbound, turn from Whalers Way onto Boardwalk Drive
at rush hour.
Response: Signals do degrade roadways. They are used as a last result.
2
Commi. .ry Planning and Environmental rvices
Current Planning
City of Fort Collins
NEIGHBORHOOD INFORMATION MEETING
PROJECT: First MainStreet Bank @ Northeast Corner of East Harmony
Road and Boardwalk Drive
DATE: April 12, 2004
APPLICANT & VF Ripley Associates
CONSULTANT: c/o Cathy Mathis
CITY PLANNER: Steve Olt
The applicants are proposing a 11,300 square foot bank building and 34,600
square feet of office uses (users undetermined) in 2 other buildings on about
6.0 acres located at the northeast corner of East Harmony Road and Boardwalk
Drive. There would be a total of about 140 parking spaces for the 3 buildings in
the development. Access to the site is proposed to be from Boardwalk Drive (to
the west of the site) and from Whalers Way (to the north of the site). The
property is in the HC - Harmony Corridor Zoning District.
................. QUESTIONS, CONCERNS, COMMENTS, RESPONSES .................
1. Question: Is the plan to build all 3 buildings at the same time, or just
the bank?
Answer: Initially, First MainStreet Bank will build just the bank
building.
2. Question: What is the timeline for this project?
Answer: If approved, First MainStreet Bank will move forward
immediately with plans for its building. The bank will sell the
other lots and buildings for others to develop.
1