Loading...
HomeMy WebLinkAboutFIRST MAINSTREET BANK - PDP - 37-03 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW4. Stormwater Utility: a. Acknowledged. b. Acknowledged. c. Drainage and erosion control reports are part of the submittal. d. The current rainfall criteria have been used to calculate detention requirements for the site. e. The detention pond is located at the northeast corner of the project. 5. Light & Power: a. Acknowledged. b. Acknowledged. c. We will coordinate the transformer location. d. Easements will be provided in the form of standard utility easements — see plat. e. Acknowledged. 6. Transportation Planning: a. A TIS is a part of the submittal package and it addresses. b. Acknowledged. c. The nearest transit stop is located within '/a mile from the site, at JFK Parkway. d. Bicycle parking is provided at the northeast corner of the building. e. The issue of dual left turn lanes is addressed in the TIS. 7. Natural Resources: a. Acknowledged. b. Acknowledged. c. The existing trees are either Chinese or Siberian Elms. We will contact the City Forester to evaluate the quality of these trees. d. The trash enclosure will match the building materials and will contain room for recycling containers. 8. Poudre Fire Authority: a. A fire hydrant is shown at the main entrance off of Boardwalk Drive. b. Acknowledged. c. Acknowledged. d. A 20' wide fire lane is shown on the site plan. The building will be equipped with an automatic fire suppression system. 9. Lot 2 will not be a part of the proposed PDP and will be developed at a later date. 10. See response to neighborhood meeting comments. 11. Acknowledged. 12. Acknowledged. Ftiplgy.0CIATES INC Landscape Architecture Urban Design Planning November 4, 2003 Steve Olt City of Fort Collins Planning Department 281 North College Avenue PO Box 580 Fort Collins, CO 80522 RE: Response to conceptual review letter for First MainStreet Bank Project Development Plan, Type I Dear Steve, The comments below address the issues raised at the First Main Street Bank Conceptual Review meeting. 1. Zoning: a. Acknowledged. We are anticipating a Type I Hearing based on the proposed land use. b. Acknowledged. c. The parking for the site exceeds the maximum by 6 spaces. d. Acknowledged. 2. Engineering: a. A full set of Utility Plans is included with submittal. b. Acknowledged. c. A TIS is provided. d. Acknowledged. e. Acknowledged. f. Additional right-of-way is provided along Boardwalk to allow for a decel lane in order to access the site and Whalers Way. g. Acknowledged. h. Acknowledged. i. This property is not seeking any access to Harmony Road. 3. Water/Wastewater: a. Water service will come from the main in Boardwalk Drive. b. Sewer service will come from an existing tap in Boardwalk Drive. c. Acknowledged. d. Acknowledged. Phone 970.224.5828 Fax 970.224. 1662 401 West Mountain Ave. Suite 201 Fort Collins, CO 80521-2604 vfripley.com