Loading...
HomeMy WebLinkAboutCINGULAR, TAFT HILL & ELIZABETH (CEDARWOOD PLAZA) WTF - PDP - 31-03A - CORRESPONDENCE - REVISIONS (3)Permit # Plan review response Provide 10 foot separation between water/sewer lines and new underground cable facilities. See A2.0 plan- all clearances have been made. END Page 2 of 2 CHARLES STECKLY ARCHITECTURE, INC. ARCHITECTURE • PLANNING • INTERIOR DESIGN 12/07/05 MATKZO CONSULTING MICHAEL MATZKO PO BOX 3600 AVON, CO 81620 Re: Permit Application # — Cingular Cell Site I am writing to address the plan review comments dated 11/21/2005. Plan review comments are in underlined. General Plannine [11/15/051 Need proper signature blocks and a legal description on cover sheet. Signature blocks should include owner's signature and notary or attorney's certification, and a signature block for the Director of Current Planning. The signature blocks have been added to the cover sheet. Light and Power Equipment enclosure is shown on top of existing electric line. The enclosure will need to be moved to allow a minimum of T clearance from the electric line. The equipment enclosure/lease area has been moved 8'-0" to the south to accommodate the clearances. A single phase 120/240v transformer will be set next to the enclosure to provide power. The new transformer has been indicated on the plans north of the lease area. Stormwater — Water - Wastewater Sewer is not shown There is a water main and a sanitary sewer that extend west from Taft on the south side of the Farmers Table and behind the buildings to the northwest. Field locate these lines and show on the site plan so that potential conflicts (if any) can be identified. The surveyor stated that all utilities have been noted on the civil survey and should be referenced there. Any additional items were not marked with the utility locates.