HomeMy WebLinkAboutADRIAN SUBDIVISION, 1ST FILING - FDP - 42-03C - CORRESPONDENCE - REVISIONS (3)Response: Updated with new city standard detail Engineering: There are still some inconsistencies between the plans. Response: The plan sets are now coordinated. The detail for the Vine Drive / Impala Drive intersection is not adequate. Response: Now it is. There is an 8% maximum slope requirement for drives. Some are shown to be 10%. Response: Revised The footings for the retaining wall cannot be in easements. Response: Revised The Traffic Engineering Department has some striping comments. Response: Revised There are some scanning issues associated with the plans. Please visit J.R. Wilson of Technical Services for his input. Response: Done Page 3 Number: 148 Response: Removed Number: 149 Response: Revised Topic: Utility Plan Number: 62 Response: Done Number: 67 Response: Fixed. Number: 146 Response: Provided on all sheets as requested. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 89 Response: Revised Number: 121 Response: Done Number: 152 Response: Done Topic: Erosion/Sediment Control Number: 151 Response: Entire site will be landscaped per the landscape plan. The following comments and concerns were expressed at staff review on August 10, 2005: Light & Power: Light & Power has the same comments that were given to the applicant in 2004. The comments have not been addressed with this re -submittal. Nothing is new. Response: Contacted Janet McTague and she stated that the plans are fine and there are no outstanding comments. Please get a set of revised plans to Janet McTague of Light &,Power. Response: Contacted Janet McTague and she stated that the plans are fine and there are no outstanding comments. Stormwater: The water quality structure design is not adequate. Page 2 RESPONSE TO COMMENTS ADRIAN SUBDIVISION, FIRST FILING - FINAL COMPLIANCE - #42-03C ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: General Number: 15 Response: Met with JR and revised as requested Number: 122 Response: DMW never received dedication statements, were they sent to the applicant? Topic: Landscape Plan Number: 150 Response: They have been removed. Topic: Plat Number: 64 Response: Acknowledged Number: 145 Response: Separate documents were submitted Topic: Private Drive Number: 128 Response: Revised Topic: Retaining Wall Number: 125 Response: Revised Topic: Site Plan Number: 72 Response: This has been corrected as suggested. Number: 133 Response: The plan sets are now coordinated. Topic: Street Design Number: 69 Response: Additional spots were added to grading sheet Number: 100 Response: Bike lane is already striped on inside of lane. Stripe was added to outside of lane (next to eop) although this is probably not necessary. Number: 147 Response: Updated all plans Page 1