HomeMy WebLinkAboutADRIAN SUBDIVISION, 1ST FILING - FDP - 42-03C - CORRESPONDENCE - (4)8tormwater. 1. The water quality structure design is not adequate. Engineering: 1. There are still some inconsistencies between the plans. 2. The detail for the Vine Drive Drive / Impala Drive intersection is not adequate. 3. There is an 8% maximum slope requirement for drives. Some are shown to be 100/6. 4. The footings for the retaining wall cannot be in easements. 5. The Traffic Engineering Department has some striping comments. 6. There are some scanning issues associated with the plans. Please visit J.R. Wilson of Technical Services for his input. This completes staff (and outside reviewing agencies) review and comments at this time. Red -lined plan from City departments are included with this comment letter. Additional comments and red -lined plans may be forthcoming. Another round of staff review is determined to be necessary. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being August 24, 2005) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your red -lined plans when you re -submit. The number of copies of each document to re -submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Y urs Truly, Steve 1 , -- City Planner cc: Susan Joy DMW Engineers King Surveyors Current Planning File #42-03C Page 5 [9/3/04] The grading plan needs to clearly show that all drainage within a proposed basin that was designed to drain to the detention pond will actually drain to the pond after construction. Due to the building footprints being proposed very near the slope grading along the east and part of the south sides of the site, lots 1 through 4 may act more like Type B lots than Type A lots. This would result in drainage entering the private drive which can not be allowed. A retaining wall may have to be designed or the building footprints reduced and the grading plan has to clearly show that drainage will flow to the private drives west of the lots. Spot elevations need to be shown with high points, swale inverts, etc. which clearly illustrates the flows going around the structures and to the private drive. Number: 121 Created: 12/ 10/2004 [8/ 12/05] I will e-mail you the new water quality outlet structure detail. [ 12/ 10/04] The water quality outlet structure is not designed specifically to the site and there still is some missing design elements that are needed for construction. The City is developing a standard detail that can be used for this site and should be completed in a couple of weeks. Number: 152 Created: 8/ 15/2005 [8/ 15/05] The report needs to include pond sizing calculations including a stage -storage table. Topic: Erosiort/Sediment Control Number: 151 Created: 8/ 12/2005 [8/ 12/05] 1. There should be a note on the plan indicating what areas are to be seeded/mulched, and/or sodded (e.g. the WO pond, etc?). 2. Please put the most current erosion control notes on the plan. s****ssssssss*ssss*ss*sssssss***ssr*ss*•s*s**ss�**s*ss******s*s**sr*******ssss***s*** The following comments / concerns were expressed at the staff review meeting on August 10, 2005: Light & Power: 1. Light & Power has the same comments that were given to the applicant in 2004. The comments have not been addressed with this re -submittal. Nothing is new. 2. Please get a set of revised plans to Janet McTague of Light & Power. Page 4 provide a 6' bike lane both sides of street and widen out Vine as necessary to accommodate that. Show eoa. Label Taft Street. Number: 147 Created: 8/9/2005 [8/9/05] The asphalt taper at Briarwood and Vine is not consistent from sheet to sheet. Number: 148 Created: 8/9/2005 [8/9/05] Please remove the sight distance hatching. No sight distance easements are required of this project. Number: 149 Created: 8/ 10/2005 [8/ 10/05] Vine Drive Improvements: Bellwhether has included the road widening design from Briarwood to Taft in their plan set so Adrian will need to remove that, portion of the design from this plan set. Please place a note on the plans references the other utility plan set and tie your design into theirs. JR Engineering is the designer on Bellwhether and you can call them for plans or wait until I get the mylars and I can make copies for you in a week or two. Topic: Utility Plan Number: 62 Created: 7/30/2004 [8/9/05] [12/10/041 [9/8/04] [7/30/041 See redlines for other comments. Number: 67 Created: 7/30/2004 [8/9/05] Repeat. The legend still has errors in it, please see redlines. [ 12/ 10/04] The legend needs to be corrected on each sheet. Currently shows the same line weight for everything on the list and some of the line work on the plans are missing from the legend. [9/8/04] All of the line weights arethe same and its hard to read the plans. Please differentiate the line weights so that the plans are more clear. 17/30/041 Please include in the design and the legend both the existing and proposed row and utility easements. Number: 146 Created: 8/9/2005 [8/9/05] Please provide a City signature block on each sheet. Department: 8tormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 89 Created: 9/3/2004 [8/ 12/05] More detail is needed near the pond along the south property line. See redlined plans. [ 12/ 10/04] More detail and spot elevations are needed for this area. A meeting may be required to go over the requirements. Page 3 Number: 145 Created: 8/9/2005 [8/9/05] From Technical Services: Offsite easements/row need to be dedicated by separate document. Topic: Private Drive Number: 128 Created: 12/ 13/2004 [8/9/05] Repeat comment - grades at both drive entrances exceed the max. [ 12/ 13/04] Sheet 10 - Profile, where is the flat spot for the sidewalk? Grades at both drive entrances exceed the max. Code says 1:12 max so this would need to be approximately 8.3% max. Also please show the points called out in the profile in the plan view as well. Topic: Retaining Wall Number: 125 Created: 12/ 13/2004 [8/9/05] Show the PL and UE in the wall typical section. Please note that no structures of any kind (including the footing) is allowed in the UE. [ 12/ 13/04] Sheet 6 - The retaining wall needs to be designed and included in this plan set. Can be designed by DMW or others, either one. Will need a typical section and or separate sections where the wall differs. Topic: Site Plan Number: 72 Created: 7/30/2004 [8/ 10/05] The row is not correctly called out. Please see redlines. [12/10/041 Repeat. [9/8/04] Dimension existing and proposed row. [7/30/04] Show, dimension and label all easements and row. Number: 133 Created: 12/ 13/2004 18/ 10/05] [ 12/ 13/04] The site plan doesn't match the utility or plat. Topic: Street Design Number: 69 Created: 7/30/2004 [8/9/05] Repeat. Or you can put the spots on the grading sheet in accordance with detail 7-28. [ 12/ 13/04] Please provide a street intersection approach detail at Impala and Vine. See detail 7-28. [9/8/04] [7/30/041 Please show how the proposed improvements to Impala and Vine tie into the existing. Number: 100 Created: 9/8/2004 [8/9/05] Please see Traffic Engineering for striping comments. The plans still do not show the proposed bike lane striping from Briarwood to Taft, both sides of the street. [12/13/041 Repeat comment. [9/8/04] Vine Drive Improvements - Need to show/label/dimension all existing row and easements. Show existing and proposed striping. Must Page 2 STAFF PROJECT REVIEW Cityof Fort Collins M. Torgerson Architects Date: 08/24/2005 c/o Troy Jones 223 North College Avenue Fort Collins, CO. 80524 Staff has reviewed your submittal for ADRIAN SUBDIVISION, 1ST FILING - FC - #42-03C, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: General Number: 15 Created: 7/27/2004 [8/9/05] Please see J.R. Wilson in Technical Services with your plans regarding scanning requirements. [12/10/041 The plans still have scanning problems. Please see redlines - I've highlighted some of the problem areas in pink highlight. The shading doesn't scan at all and will need to be changed to some sort of hatching. [9/8/04] Correct all overlapped labeling and rotate all labeling to the reader. Do not shade areas of removal as this will not scan. Hatching works much better. Please see Appendix E6 for scanning requirements. [7/27/041 Please see Appendix E6 for scanning requirements. Number: 122 Created: 12/ 13/2004 [8/ 16/05] The legal descriptions and exhibits were reviewed and found to be accurate. I will send you the appropriate dedication statements that the applicant will need to fill out and sign so that I can take the dedications through the City's process. [ 12/ 13/04] Will need to dedicate the additional foot and a half of row along the undeveloped tract to Vine Drive row so that the sidewalk can be installed. You may do this by separate document and will need to provide a legal description and exhibit along with the dedication statement. I can email you this document in word if you send me an email at sjoy®fcgov.com Topic: Landscape Plan Number: 150 Created: 8/ 10/2005 [8/ 10/05] Remove the sight distance triangles as they are not required of this development. Topic: Plat Number: 64 Created: 7/30/2004 [8/9/05] [9/8/04] [7/30/041 From Technical Services: Boundary and legal close. Page 1