HomeMy WebLinkAboutFORT COLLINS COLORADOAN - FDP - 41-03A - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSponds up in the area on the north side of their property in heavy storms and
then percolates into the soil.
• All of your plan and report redlines have been addressed or responded to on the plans
or in the report.
Engineering - Susan Joy
• All items indicated on Appendix E-4 are now included on the plan.
• All of your plan redlines have been addressed or responded to on the plans.
We feel that we have adequately addressed all comments. Please feel free to contact me with
any questions concerning this project.
CC: Corky Bradley, RB+B Architects
Bruce Hendee, BHA Design
Sincerely;
Northern Engineering Services
C Uv`a�
Mark Oberschmidt, PE
Project Engineer
Page 2
NORTHERN
ENGINEERING
NESERVICES, INC.
March 16, 2004
Ted Shepard
City of Fort Collins Planning
281 North College Ave
P.O. Box 580
Ft. Collins, CO 80522-0580
Project: Fort Collins Coloradoan — Response to comments dated 02/25/04
Dear Ted
We have revised the plans for the Fort Collins Coloradoan per city comments dated 02/25/04.
There have been a few site changes from the last set of plans, which are listed below
o Revisions to parking lot on the east side of the site.
o Retaining walls were added at the northwest and northeast sides of the
building.
o The proposed utility services from the street were relocated to the central
driveway.
o The walks along the front of the building are now all 8-feet wide.
Our responses are as follows:
Water Wastewater — Jeff Hill General Comments
• The proposed fire line alignment has been corrected per your comments and all pipe
lengths have been labeled
• The limits of the abandonment of existing service are clearly defined as to phase and
method.
• Your entire plan redlines have been addressed or responded to on the plans.
Stormwater— Wes Lamarque
• Drainage easements will be provided for the water quality pond. These will be
provided along with the other easements that are being dedicated by separate
document on the plan.
• A site -specific water quality device is provided on the detail sheet. You will note that
is labeled "modified for the Coloradoan".
• We have added additional discussion of the drainage outfall for this site. Excerpts are
included here.
o Historically stormwater from the site leaves the site via surface flow at
northeast comer of the site. A site visit on Saturday 12/13/03 showed this to
be the case. This outfall is poorly defined and appears to be drain rather
poorly. We have verbal reports from the neighbors to the east that water
Page 1
420 SOUTH HOWES. SUITE 202 / FORT COLLINS, COLORADO 80521 / 970.221.4158 / FAX 970.221.4159