HomeMy WebLinkAboutFORT COLLINS COLORADOAN - PDP - 41-03 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW291 The new office building will be subject to the architectural requirements of
Section 3.5.3(D) of the Land Use Code.
RESPONSE: Comment Acknowledged.
RESPONSE: An exception to the required relationship between building
entrance and pubic streetscape is allowed for under section 3.5.3.(B)(2)(d)2.c
where an established pattern of the existing buildings on site and on adjacent
parcels do not comply with this standard and make a pedestrian -oriented street
front infeasible.
30. Since the new office building faces southwest, shade trees should be considered
between the parking lot and the building. For further information on energy
conservation, please contact Doug Swartz, Energy Service Engineer, City of Fort
Collins Utilities, 221-6700
RESPONSE: Deciduous Shade trees are shown on the proposed landscape
plan (part of this PDP submittal) on the south side of the building.
standard drainage and erosion control report and construction plans are required
and they must be prepared by a professional engineer registered in Colorado.
RESPONSE: Comment Acknowledged.
24. This report needs to document the outfall system to the river which may need
some maintenance. The site presently does not drain onto Riverside which is
11 already carrying too much runoff, so no additional runoff will be allowed. Onsite
�Q 4�tl�water quality extended detention is the recommended water quality treatment.
V% 1 v Parking lot islands could possibly be used to treat the runoff.
\
`' J►�' ,-_._RESPONSE: Agreed. The drainage study for this site will examine the
downstream draiange a We have also graded the site so that runoff from all
impervious areas will not be directed to Riverside. We will also include several
water quality BMP's, including some extended detention, to pre -treat runoff
from this site.
25. The site is on Stormwater inventory map #10I. A copy of the map can be
obtained from the Utilities office at 700 Wood Street. As long as there is no
increase in the volume of stormwater runoff, the Natural Resources Department
will not require an easement if the outfall system drains across their natural areas
and is changed in quantity, quality or character. For further information, please
contact Glen Schlueter, 221-6681.
RESPONSE: We have discussed this project with Glen. As mentioned this site
is already developed with a high percentage of impervious area. This
development does not add any impervious areas, and therefore will not be
increas' e amounts of developed flows downstream. The quality of the
runo shoul be improved, with the implementation of water quality BMP's to
the sys
26. Phase One will be assessed a Capital Expansion Fee of $0.53 cents per square
foot based on the "commercial" category. The Phase Two expansion would be
"industrial" and assessed a fee of $0.15 cents per square foot. The fee is collected
at the time of building permit issuance. Please note that the fee is adjusted
annually based on the Denver -Boulder consumer price index.
RESPONSE: Comment Acknowledged.
27. If the portions of Phase Two exceed 40 feet in height, then a shadow analysis will
be needed.
RESPONSE: Phase two is not included with the PDP being submitted to the
City. Phase two will go through the City review process at some point in the
future.
28. The demolition of any existing structure or portions of an existing structure will
require a Demolition Permit from the Building Inspection and Permits
Department.
RESPONSE: Comment Acknowledged.
RESPONSE: Comment Acknowledged.
18. Riverside is a sub -standard arterial and lacks on -street bike lanes. The
Transportation Impact Study should address the bicycle Level of Service to
determine if this existing deficiency needs to be addressed by the proposed
expansion.
RESPONSE: The Traffic Study addresses vehicular, pedestrian and bicycle
traffic issues. ,E}W0 r„y r /✓H.*r ?
19. The Transportation Department is concerned about the number of driveways
intersecting with Riverside. Generally, the City desires as few driveway/arterial
intersections as possible. The Transportation Impact Study should address this
issue. The anticipated use and volume at these driveways should be estimated.
The T.I.S. should address Phase One and Phase Two improvements and note that
two driveways are scheduled for closure with Phase Two. The site is unique in
that there are numerous circulation needs associated with the operation. For
example, the site must accommodate large truck circulation, small truck
deliveries, trash removal, carrier pick-up, employee parking and customer access
all of which contribute to the requirements of multi -faceted internal circulation
system. For further information, please contact Eric Bracke, 221-6630.
RESPONSE: The number of access points proposed have already been
discussed and agreed to by Eric Bracke. This proposal now only includes a
single phase, the new office building. The Traffic Study will address traffic
related to the proposed development.
20. The driveways should be designed with a radial curb return.
RESPONSE: We are proposing three driveways into the site. The two
southernmost driveways will be new construction, and as such, radial curb
returns have been included. The northernmost driveway will be temporary until
such time that the future building is constructed. Therefore, we would like to
utilize the existing driveway section, and minimize the impacts to Riverside
Avenue. Unfortunately, this existing driveway does not have radial curb returns.
We will be happy to prepare a variance request for this specific driveway if
needed.
21. Be sure to provide a bicycle rack near the office entrance.
RESPONSE: The site plan indicates proposed bike rack locations.
22. Be sure to provide a sidewalk ramp system to accommodate the existing
pedestrian crosswalk across Riverside.
RESPONSE: Sidewalk ramps for the walkway along Riverside Avenue have
been included with the proposed site plan.
23. This site is in the Spring Creek drainage basin where the new development fee is
$2,175/acre which is applied to imperviousness greater than 350 square feet. The
based on the Denver -Boulder consumer price index. (There is information on the
Street Oversizing Fee on the City's website at WWW.fCg0V.00M.
RESPONSE: Comment Acknowledged.
13. Any existing sidewalk, curb, or gutter that is damaged or in disrepair must be
repaired prior to issuance of Certificate of Occupancy.
RESPONSE: Comment Acknowledged.
14. There is a concern about the closeness of the parking stalls to the travel lane in
Riverside. One of the Engineering standards is that parking stalls be set back
from the travel lane a specified distance based on the volume of traffic within the
parking lot. Where this standard cannot be achieved, a variance procedure is
available. This is an internal variance that may be reviewed by the City Engineer.
This is not a Modification of Standard to be reviewed only by the Planning and
Zoning Board. The Transportation Impact Study should address this issue. A key
factor may the turnover of the parking spaces in question. If these are long-term
parking spaces for employees only, then this needs to be documented in support
of a variance. It appears that the setback will have to be in the 40 to 50-foot
range.
RESPONSE: Parking spaces are proposed to be setback 45 feet from the north
flow line of Riverside Avenue. how DoEs TM4+ G6M4,4Atie "'l 7'h6 Sr"Rr1/,0
15. Driveways should intersect with Riverside as close to 90 degrees as possible for
25 feet.
RESPONSE: The western most of the three access points off Riverside is
existing. Two additional access points are proposed. Access points off
Riverside Avenue have been designed to be as close to 90 degrees as possible.
16. Riverside Drive is classified as an "arterial" street and is eligible to be classified
as a "constrained" arterial. If considered constrained, there must be 51 feet of
right-of-way from property line to centerline of the roadway. Therefore,
additional right-of-way dedication may or may not be needed depending on how
much right-of-way exists now. It appears that one extra foot of right-of-way may
be needed, as well as a 15-foot wide utility easement both of which may be
dedicated by separate legal document as opposed to replatting.
RESPONSE: Currently, it appears that there is 50' of Right -of -Way existing. We
are planning on dedicating 1' of additional Right -of -Way along Riverside, as
well as dedicating a 15" utility easement along the entire frontage of the
property. At this point in time, there is no intention of replotting this site,
therefore, these two easements, as well as any other additional easements,
which may be needed, will be dedicated by separate document.
17. A Development Agreement may be needed prior to recording of the plans
depending on the extent of public improvements that are constructed for this
expansion. For further information, please contact Susan Joy, Development
Review Engineer, 221-6605.
for emergency change -out. The large switching cabinets in southeast corner of
the property must be preserved as these serve a large regional area.
RESPONSE: The C-1 form will be submitted when the design is for enough
along to have the actual load information. The location of the transformer will
meet City requirements. We were aware that the switching cabinets need to
remain.
9. The site is served by the City of Fort Collins Water and Wastewater Department.
There is a 12-inch diameter water main in Riverside. There are two sanitary
sewer lines in Riverside. There is an eight -inch diameter sewer line west of
McHugh and a 12-inch diameter sewer line east of McHugh. If there is a new or
increased water or sewer service, then Plant Investment Fees and Water Rights (or
cash -in -lieu) will be due for the net increase over that which is already in place.
Fees would be due at the time of building permit issuance. If there is a need to
abandon any water or sewer service, then such service must be abandon all the
way back to the main. For further information, please contact Roger Buffington,
221-6681.
RESPONSE: At this time, we are proposing to install a new 1 '/2" domestic
water service and a 6" sewer service. At this point in time, we assume that there
is an existing 3/a" water service to the old Collins Cashway building, which we
hope tb utilize for landscape irrigation, and a 4" sewer service, which will be
abandoned. Details for the service abandonments will be included in the Utility
plans for the project.
10. A fire flow test can be set up with Poudre Fire Authority. Any open floor area
that exceeds 5,000 square feet must be treated with an automatic fire
extinguishing system. The building must be within 300 feet of a fire hydrant. All
portions of the building's exterior must be within 150 feet of the designated fire
access lane. For further information, please contact Ron Gonzales, 221-6570.
RESPONSE: At this time we are planning on having an internal sprinkler
system. A new hydrant is being planned close to the main entrance of the new
building, and it appears that all portions of the buildings exterior are within
150"feet of a fire lane, and that the building is within 300' of a fire hydrant.
11. A Transportation Impact Study will be required. To determine the scope of this
study and which intersections to analyze, please contact Eric Bracke, 221-6630.
Keep in mind that all modes of travel must be analyzed, not just vehicles.
RESPONSE: A Transportation Impact Study has been prepared for this
development and is included with the PDP submittal.
12. The Street Oversizing Fee will be based on square footage and anticipated trip
generation for the new office building and the new portions of the existing
building. The City also collects the Larimer County Road Impact Fee. Please
contact Matt Baker, 221-6605, for an estimate of these fees which are payable at
the time of building permit issuance. Please note that fees are adjusted annually
3-),DGbq = -37 X J = W 115 i bd EXL,e,rr JPA•c6J.
a• RESPONSE: The total proposed parking count is W.
• 3. Since the parking lot exceeds 100 spaces, 10% of the interior must be in
landscape islands.
RESPONSE: Parking lot landscaping has been provided to meet the minimum
10% requirement.
4. Please add street trees on 30 to 40-foot intervals along Riverside. The area along
Riverside in front of the new Phase Two improvements are more industrial in
character and this area may warrant more landscape material for screening
purposes. For example, foundation shrubs will be needed along the southwest
elevations of the Phase Two mail room, press support and press components.
RESPONSE: Street trees are shown on the planting plan. Any screening
required for the press building will be addressed when that project is submitted
for review.
5. For Phase One, the trash enclosure must be constructed to match the predominant
material of the building and be sufficiently sized for containers for recyclable
materials.
RESPONSE: The trash enclosure shown at the northeast corner of the building
has been sized to meet the needs of this office building. The enclosure is
anticipated to be 6 feet in height and will be constructed of brick to match the
building.
6. A sidewalk connecting the new office building's main entrance to the street
sidewalk should be provided including an enhanced crosswalk (including change
of texture) where this walk crosses a drive aisle.
RESPONSE: A connection from the sidewalk along Riverside Avenue links
pedestrians to the walkway system along the front of the office building.
7. The site will be served electricity by the City of Fort Collins Light and Power
Department. The existing electrical transformer is in place and any relocation
would be at the applicant's expense. Normal electrical charges will apply. Any
system modification to upgrade the power for an office will also be at the
developer's expense. For an estimate of these charges please contact Alan Rutz at
221-6700. Please contact Doug Martine if the internal workflow requires
electrical supply on both the east and west sides of the building.
RESPONSE: The project lighting consultant has been in contact with Alan Rutz
from the start of the project and is continuing to work with him to develop
design and costs. The current plans are to have service only on the East end of
the office building.
8. A Commercial One ("C-1") Form must be completed by an electrical contractor
to determine entrance capacity. The location of the electrical transformer must be
coordinated with Light and Power and Planning so that it is not located along the
roadway, but, rather, in a less visible location yet within ten feet of hard surface
-m C . A . GMZ m drAl J
ITEM: New Office for the Coloradoan (demolition of the old
Collins Cashway building) and Remodel and Expansion of
Existing Building at 1212 Riverside Drive
MEETING DATE: August 25, 2003
APPLICANT: The Coloradoan c/o Mr. Corky Bradley, RB+B Architects,
Inc., 315 East Mountain Avenue, Fort Collins, CO. 80524.
LAND USE DATA: Request to demolish the old Collins Cashway building and
construct a new two-story office building containing approximately 37,000 square feet as
Phase One. Phase Two would include expansion and remodel of the existing Coloradoan
Building at 1212 Riverside by adding a new press and mailroom between the existing
building and the old Collins Cashway building. Phase Two also includes partial
demolition of 1212 Riverside. The loading would be relocated to the rear and an existing
metal building on the east side of the site would be removed. There would be other
minor upgrades as well.
COMMENTS:
The parcel is zoned I, Industrial which allows both offices (Phase One) and print
shops (Phase Two), subject to Administrative Review.
RESPONSE: Only phase one, the office building, is being submitted with this
PDP. The press shop will be submitted as a separate application at some point
in the future.
2. The maximum number of parking spaces for general office is 3.0 spaces per 1,000
square feet of gross floor area. Additional parking spaces may be allowed based
on occupant load, square foot per employee, or other factors unique to the
applicant's request such as shift overlap. Please refer to Section 3.2.2(K)(4) for
further information on allowances for increased parking for offices. The print
shop is considered industrial and is allowed a maximum of .75 spaces per
employee.