Loading...
HomeMy WebLinkAboutFORT COLLINS COLORADOAN - PDP - 41-03 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESFort Collins Coloradoan — Project Development Plan December 16, 2UU3 An outdoor employee plaza space has been designed just west of the main building entry and has access from the exterior walkway system. Pedestrian routes have been carefully thought out and appropriate walkways have been shown on the proposed site plan for all pedestrian circulation. Architectural style is to have clean, simple lines and to reflect a modern theme. The primary building material is to be brick. 6) Description of Variances: No variances are being requested with this development proposal. 7) Description of Avoidance / Mitigation of Conflicts between land uses / Natural Habitats and Features: Adjacent land uses include Railroad tracks to the north, with RC zoning north of the railroad tracks; Riverside Avenue to the south, with E zoning south of Riverside Avenue; Industrial zoning to the east / south-east; and E and I zoning to the west of the property. There are no existing natural habitats or natural features on site as most of the site is covered by asphalt. Existing drainage patterns will be maintained. Total amount of pervious surface will be increased with this development. 8) Neighborhood Meeting Issues: A neighborhood meeting has not yet been held for this development proposal. 9) Name of Project / Prior Names of Project for Conceptual Review: The first Conceptual Review Team meeting was held on December 16, 2002 under the name 1212 Riverside Drive, Coloradoan Building (including old Collins Cashway) Expansion. A second Conceptual Review Team meeting was held on August 25, 2003 under the name New Office Building for the Coloradoan (demolition of the old Collins Cashway) and Remodel and Expansion of Existing Building at 1212 Riverside Drive. 3 Fort Collins Coloradoan — Project Development Plan Objectives 16, 2003 plaza spaces will provide connections for pedestrians from the public walk along Riverside and from parking areas to the building entrances. vi) Buffering — Landscape buffer with berming is provided along Riverside Avenue to the extent possible. Minimum side and rear setbacks are provided and will be landscaped. An exception to the required 30 foot deep landscape yard adjoining the proposed building is allowed for under section 3.5.3.(B)(2)(d)2.c where an established pattern of the existing buildings on site and on adjacent parcels do not comply with this standard and make a pedestrian -oriented street front infeasible. vii) Lighting — Parking areas will be illuminated by 40OW metal halide lights on 20 foot poles. 3) Proposed Ownership and Maintenance of PDP: The property, including landscaping, will be maintained by The Colordoan. 4) Estimate of Number of Employees: There are currently 190 employees that will work within the proposed office building. By the year 2018, it is anticipated that there will be 228 employees working within the building. 5) Description of Design Choices: The building location on the property was driven in part by the need to have the new office building constructed before demolition of the existing Collins Cashway building occurs; in part by site constraints created by program requirements for a future press building expansion adjoining the west fagade of the office building; and in part by circulation requirements for service vehicles, employees, and visitors The existing site is nearly all asphalt. The proposed development actually increases the amount of pervious surface on the property. Existing trees are being preserved to the extent feasible. A substantial increase in quantity of plant material is proposed with this re -development than exists today. Foundation plantings, parking lot plantings, buffer plantings and street trees are all provided, as shown on the landscape plan. Plants have been selected to compliment the architectural style of the building, to provide year round interest, to accent entrances, and to provide shade in heavily used spaces. Landform modification has also been carefully thought out to add to the overall landscape character. Raised beds will be sculpted to create interest and provide a sense of privacy to users of the plaza space. Berming is incorporated into the buffer plantings along Riverside Avenue to more effectively screen parking from the streetscape. FI Fort Collins Coloradoan — Project Development Plan Planning Objectives December 16, 2003 This Project Development Plan for the Fort Collins Coloradoan is a re -development of the existing Collins Cashway office / retail building and site. The re -development proposes a new office building for the Fort Collins Coloradoan. Once the new office building is constructed, the old Collins Cashway building will be demolished. 1) City Plan Principles / Policies achieved by the proposed plan: Principle LU-1 — This project promotes a compact development pattern within a well defined boundary by proposing re -development of an existing office / industrial site. Principle CAD-2 — This project provides an outdoor plaza space for employee and visitor use that is functional, accessible, attractive, safe and comfortable. Principle ECON-1 — This project allows for additional office space for the Fort Collins Coloradoan which supports the City goal of having balanced and sustainable economic development. Principle GM 1 — This project is a re -development within the heart of the City boundaries. This re -development does not create growth at the City's edges. 2) Site Description: i) Open Space — The amount of open space will be increase with this development proposal as the site is currently covered by a substantial amount of asphalt. The existing building footprint is 30,900 sf and the proposed building footprint is 19,600 sf. City open space requirements will be met with this proposed development. ii) Wetlands — There are no existing wetlands on the property. Bioswales will be created to provide water quality treatment prior to release off -site. iii) Natural Habitats / Features — There are no existing natural area on the property. iv) Landscaping — Foundations plantings, parking lot landscape, and tree stocking will be provided per City code. Buffering through landscaping and berming will be provided along Riverside to aid in screening parking areas from the adjacent streetscape. v) Circulation — There will be three separate access points to the property from Riverside Avenue, one of which is an existing access point. Internal drive aisles will provide internal circulation for vehicles. A series of sidewalks and