Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS SOUTHWEST WATER PUMP STATION - PDP - 40-03 - CORRESPONDENCE - REVISIONS (4)agree that foundation planting is not needed. Per discussion with Ted Shepard, we have provided an additional tree to offset the lack of foundation planting. Please add the following standard General Notes to the site plan: "The site is zoned P.O.L., Public Open Land. Response: Done Refer to the Utility Plan for information on water, electrical and drainage information. Response: Done There will no new pole -mounted lighting. Any wall -mounted lighting shall be sharp cut-off and down -directional. Response: Done Developer shall ensure that the landscape plan is coordinated with the plans done by other consultants , so that the proposed grading storm drainage or other construction does not conflict with nor preclude installation and maintenance of landscape elements. Response: Done Developer is to coordinate electric service location, transformer location, meter location and electrical development charges with Light and Power Department." Response: Done Be sure and return all of your redlined plans when you re -submit. Response: Redlined plans are included with the re -submittal. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 5 RESPONSE: Letter has been submitted to Glen Schlueter requesting a variance for the requirement of a drainage report. Topic: Floodp/ain Administration Comments Number: 8 Created: 12/9/2003 [12/9/03] Susan Hayes 1. Please add the FEMA flood pla i n/floodway limits to the plan. Use the floodplain shown on the recently approved LOMR (approved Nov. 24, 2003). A copy of the LOMR is available in our office. RESPONSE: FEMA floodplain/floodway limits have been added to Utility Plans. 2. Add BFE's lines for both the City and FEMA floodplain. RESPONSE: City and FEMA BFE's have been added to Utility Plan set. 3. Please add a note to Sheet 1: "All grading, landscaping, and utility work within the 100-year floodplain requires an approved Floodplain Use Permit prior to start of construction." (One permit can cover all work.) RESPONSE: Note has been added. 4. Please add Benchmark and elevation to plans. RESPONSE: Project benchmarks have been added to cover sheet and General Notes sheet of Utility Plans. 5. Although the structure is out of the floodplain, the drainline does extend into the floodplain. What measures ensure water would not back-up into the structure during a flood? RESPONSE: A check valve has been added to the drainline to prevent backflow. Topic: Sediment and Erosion Control Comments Number: 9 Created: 12/9/2003 [12/9/03] December 9, 2003 (Bob Zakely) Plan looks OK. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 2 Created: 11 /28/2003 [11/28/03] Please show and label pumphouse dimensions on site plan. RESPONSE: Done Number: 3 Created: 11 /28/2003 [11/28/03] There is no landscaping shown anywhere around the building. Landscape standards apply. Please provide foundation shrubs in accordance with Section 3.2.1 of the Land Use Code for all but the west elevation. RESPONSE: For security reasons the Utility Department does not wish to have foundation planting. This has been discussed with the Parks Department and they Page 4 [12/5/03Coordinate power requirements with Light and Power Engineering (221- 6700). The electrical contractor should complete the Commercial Service Form to determine entrance capacity and to verify whether or not the existing transformer is sufficient. RESPONSE: Note has been added to the Utility Plan drawings. C-1 form has been completed and coordination of power is ongoing with Doug Martine. Department: PFA Topic: General Number: 7 Issue Contact: Michael Chavez Created: 12/8/2003 The minimum width of the access road shall be 12 Ft. This includes the road up to the existing irrigation pump station. The gravel access road shall be compacted road base able to support a 40-ton vehicle. The road cannot be 1/4 inch gravel. RESPONSE: Class 6 Roadbase will be used. The access drive will be constructed to the Southwest Pump Station only. Department: Stormwater Utility Topic: Grading Plan Number: 10 Issue Contact: Basil Hamdan Created: 12/9/2003 [12/9/03] Please add a legend to the plan. RESPONSE: A legend has been added to the Construction Notes — Sheet 3 of the Utility Plans. Provide a proposed finished floor elevation for the building, and call out spot elevation along the access road. RESPONSE: Finished floor elevation for building and curve table for access drive has been added to the Grading Plan. Please add a proposed cross-section for the swale. RESPONSE: Proposed cross-section for drainage swale has been added to the Grading Plan. Topic: Utility Plan Number: 11 Created: 12/9/2003 [12/9/03] Please provide a detail for the proposed riprap at the outlet end of the drain line. RESPONSE: Proposed riprap has been eliminated from the design. Outlet velocities from drainline are not considered erosive. Topic: Drainage Letter Number: 12 Created: 12/9/2003 [12/9/03] Please provide a letter stating what the impervious area added by thi s project would be, justifying the fact that no drainage report or detention would be required. Page 3 Construction limits are shown on the plans. No construction is anticipated within the existing parking lot area. Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. RESPONSE: Street cut is not required. The existing curb cut will be used. City curb standards have been added to the grading plan. Number: 17 Created: 12/9/2003 [12/9/03] Show the grading at the proposed drainage swale. RESPONSE. Typical section for the drainage swale has been added to the grading plan. Number: 18 Created: 12/9/2003 [12/9/03] Show the limits of the existing pond. RESPONSE: Limits of existing pond has been added. Number: 19 Created: 12/9/2003 [12/9/03] Remove the SF line off the grading sheet and show it only on the drainage and erosion control sheet. RESPONSE: Silt fence has been removed from the grading plan. Number: 20 Created: 12/9/2003 [12/9/03] Provide a legend, each sheet. RESPONSE: Legend has been provided on the Construction Notes- Sheet 3 of the Utility Plans. Number: 21 Created: 12/9/2003 [12/9/03] Show, label & dimension all property boundaries, utility easements, ROW, etc, each sheet. RESPONSE: Utility easement for existing waterlines has been added to the Utility Plan drawings. Number: 22 Created: 12/9/2003 [12/9/03] Provide dimensions and radii for driveway or list all in a curve table so that it can be laid out in the field. RESPONSE: Curve table has been added for the access drive on the Grading Plan. Department: Light & Power Topic: General Number: 6 Issue Contact: Monica Moore Created: 12/5/2003 Page 2 6 961ft1 Citcof Fort Collins BHA DESIGN ROGER SHERMAN 4803 INNOVATION DR. STAFF PROJECT REVIEW FT. COLLINS, COO 80525 Date: 12/10/2003 Staff has reviewed your submittal for CITY OF FTC SOUTHWEST WATER PUMP STATION PDP - TYPE I, and we offer the following comments: ISSUES: Department: Engineering Topic. General Number: 13 Issue Contact: Susan Joy Created: 12/9/2003 [12/9/03] The plan sets have not been submitted in accordance with the Larimer County Urban Area Street Standards (LCUASS). Please see chapters 2, 3, and 7 for design requirements as well as Appendix El, E2, and E4. Any items not included in the next submittal will become a new outstanding item. RESPONSE: The plan sets have been revised to reflect the requirements of Larimer County Urban Area Street Standards (LCUASS) where applicable. Topic: Utility Plan Number: 14 Created: 12/9/2003 [12/9/03] See attached appendix E4 for missing or incorrectly shown requirements not specifically addressed in this comment letter. Any items unaddressed with the next submittal will become a new comment. RESPONSE: The plan sets have been revised to reflect the requirements of Appendix E4 of LCUASS where applicable. Number: 16 Created: 12/9/2003 [12/9/03] Gravel is not an acceptable surface for the proposed driveway. Identify how you will handle the curb cut to accommodate the proposed driveway. Show the approximate area of construction if getting into the existing parking lot and add the street cut note: RESPONSE: Class 6 roadbase will be used to construct the access drive. The existing curb cut near the southwest corner of the parking lot will be used for access to the Southwest Pump Station. Curb cut repair details have been added to the grading plan should any damage occur to the existing curb during construction. Page 1