Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS SOUTHWEST WATER PUMP STATION - PDP - 40-03 - CORRESPONDENCE - (3)HILL AND HILL ATTORNEYS AT LAW A LIMITED LIABILITY COMPANY FORT COLLINS, COLORADO 80522 ALDEN V. HILL BRETT M. HILL December 4, 2003 TO: Ted Shepard The City of Fort Collins Current Planning 281 N. College Avenue Fort Collins, CO 80521 ALDEN T. HILL (1908 - 1998) P. O. BOX 421 160 WEST MOUNTAIN AVE. TELEPHONE (970) 482-3683 FAX (970) 482-7648 RE: The Pleasant Valley and Lake Canal Company Project #40-03 City of Fort Collins Southwest Water Pump Station PDP - Type I (LUC) Staff Review Meeting: December 10, 2003 PROJECT COMMENT SHEET These comments are submitted on behalf of The Pleasant Valley and Lake Canal Company. We are its general counsel. The plans submitted do not appear to affect the Pleasant Valley Ditch. There may be additional comments as we see any changes which come through or learn more about this matter. Please keep us informed. Ve truly yours, Alden V. Hill 1 AVH:skd (aldcn/pv&IccAtr city ted shepud2) cs�� b42-4& P Please add the following standard General Notes to the site plan: "The site is zoned P.O.L., Public Open Land. Refer to the Utility Plan for information on water, electrical and drainage information. There will no new pole -mounted lighting. Any wall -mounted lighting shall be sharp cut-off and down -directional. Developer shall ensure that the landscape plan is coordinated with the plans done by other consultants , so that the proposed grading storm drainage or other construction does not conflict with nor preclude installation and maintenance of landscape elements. Developer is to coordinate electric service location, transformer location, meter location and electrical development charges with Light and Power Department." Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 4 Topic: Drainage Letter Number: 12 Created: 12/9/2003 [12/9/03] Please provide a letter stating what the impervious area added by thi s project would be, justifying the fact that no drainage report or detention would be required. Topic: Floodplain Administration Comments Number: 8 Created: 12/9/2003 [12/9/03] Susan Hayes 1. Please add the FEMA floodplain/floodway limits to the plan. Use the floodplain shown on the recently approved LOMR (approved Nov. 24, 2003). A copy of the LOMR is available in our office. 2. Add BFE's lines for both the City and FEMA floodplain. 3. Please add a note to Sheet 1: "All grading, landscaping, and utility work within the 100-year floodplain requires an approved Floodplain Use Permit prior to start of construction." (One permit can cover all work.) 4. Please add Benchmark and elevation to plans. 5. Although the structure is out of the floodplain, the drainline does extend into the floodplain. What measures ensure water would not back-up into the structure during a flood? Topic: Sediment and Erosion Control Comments Number: 9 Created: 12/9/2003 [12/9/03] December 9, 2003 (Bob Zakely) Plan looks OK. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 2 Created: 11 /28/2003 [11/28/03] Please show and label pumphouse dimensions on site plan. Number: 3 Created: 11 /28/2003 [11/28/03] There is no landscaping shown anywhere around the building. Landscape standards apply. Please provide foundation shrubs in accordance with Section 3.2.1 of the Land Use Code for all but the west elevation. Page 3 Number: 20 Created: 12/9/2003 [12/9/03] Provide a legend, each sheet. Number: 21 Created: 12/9/2003 [12/9/03] Show, label & dimension all property boundaries, utility easements, ROW, etc, each sheet. Number: 22 Created: 12/9/2003 [12/9/031 Provide dimensions and radii for driveway or list all in a curve table so that it can be laid out in the field. Department: Light & Power Issue Contact: Monica Moore Topic: General Number: 6 Created: 12/5/2003 [12/5/03Coordinate power requirements with Light and Power Engineering (221- 6700). The electrical contractor should complete the Commercial Service Form to determine entrance capacity and to verify whether or not the existing transformer is sufficient. Department: PFA Issue Contact: Michael Chavez Topic: General Number: 7 Created: 12/8/2003 The minimum width of the access road shall be 12 Ft. This includes the road up to the existing irrigation pump station. The gravel access road shall be compacted road base able to support a 40-ton vehicle. The road cannot be 3/a inch gravel. Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Grading Plan Number: 10 Created: 12/9/2003 [12/9/03] Please add a legend to the plan. Provide a proposed finished floor elevation for the building, and call out spot elevation along the access road. Please add a proposed cross-section for the swale. Topic: Utility Plan Number: 11 Created: 12/9/2003 [12/9/03] Please provide a detail for the proposed riprap at the outlet end of the drain line. Page 2 �. STAFF PROJECT REVIEW City of Fort Collins BHA DESIGN Date: 12/10/2003 ROGER SHERMAN 4803 INNOVATION DR. FT. COLLINS, COO 80525 Staff has reviewed your submittal for CITY OF FTC SOUTHWEST WATER PUMP STATION PDP - TYPE I, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: General Number: 13 Created: 12/9/2003 [12/9/03] The plan sets have not been submitted in accordance with the Larimer County Urban Area Street Standards (LCUASS). Please see chapters 2, 3, and 7 for design requirements as well as Appendix El, E2, and E4. Any items not included in the next submittal will become a new outstanding item. Topic: Utility Plan Number: 14 Created: 12/9/2003 [12/9/03] See attached appendix E4 for missing or incorrectly shown requirements not specifically addressed in this comment letter. Any items unaddressed with the next submittal will become a new comment. Number: 16 Created: 12/9/2003 [12/9/03] Gravel is not an acceptable surface for the proposed driveway. Identify how you will handle the curb cut to accommodate the proposed driveway. Show the approximate area of construction if getting into the existing parking lot and add the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 17 Created: 12/9/2003 [12/9/03] Show the grading at the proposed drainage swale. Number: 18 Created: 12/9/2003 [12/9/03] Show the limits of the existing pond. Number: 19 Created: 12/9/2003 [12/9/03] Remove the SF line off the grading sheet and show it only on the drainage and erosion control sheet. Page 1