December 4, 2003
TO: Ted Shepard
The City of Fort Collins
Current Planning
281 N. College Avenue
Fort Collins, CO 80521
ALDEN T. HILL
(1908 - 1998)
P. O. BOX 421
160 WEST MOUNTAIN AVE.
TELEPHONE (970) 482-3683
FAX (970) 482-7648
RE: The Pleasant Valley and Lake Canal Company
Project #40-03 City of Fort Collins Southwest Water Pump Station PDP - Type I (LUC)
Staff Review Meeting: December 10, 2003
PROJECT COMMENT SHEET
These comments are submitted on behalf of The Pleasant Valley and Lake Canal Company.
We are its general counsel.
The plans submitted do not appear to affect the Pleasant Valley Ditch.
There may be additional comments as we see any changes which come through or learn more
about this matter. Please keep us informed.
Ve truly yours,
Alden V. Hill 1
AVH:skd
(aldcn/pv&IccAtr city ted shepud2)
cs�� b42-4& P
Please add the following standard General Notes to the site plan:
"The site is zoned P.O.L., Public Open Land.
Refer to the Utility Plan for information on water, electrical and drainage
information.
There will no new pole -mounted lighting. Any wall -mounted lighting shall be
sharp cut-off and down -directional.
Developer shall ensure that the landscape plan is coordinated with the plans
done by other consultants , so that the proposed grading storm drainage or
other construction does not conflict with nor preclude installation and
maintenance of landscape elements.
Developer is to coordinate electric service location, transformer location, meter
location and electrical development charges with Light and Power Department."
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Page 4
Topic: Drainage Letter
Number: 12 Created: 12/9/2003
[12/9/03] Please provide a letter stating what the impervious area added by thi s
project would be, justifying the fact that no drainage report or detention would be
required.
Topic: Floodplain Administration Comments
Number: 8 Created: 12/9/2003
[12/9/03] Susan Hayes
1. Please add the FEMA floodplain/floodway limits to the plan. Use the floodplain
shown on the recently approved LOMR (approved Nov. 24, 2003). A copy of the
LOMR is available in our office.
2. Add BFE's lines for both the City and FEMA floodplain.
3. Please add a note to Sheet 1: "All grading, landscaping, and utility work within
the 100-year floodplain requires an approved Floodplain Use Permit prior to start
of construction." (One permit can cover all work.)
4. Please add Benchmark and elevation to plans.
5. Although the structure is out of the floodplain, the drainline does extend into the
floodplain. What measures ensure water would not back-up into the structure
during a flood?
Topic: Sediment and Erosion Control Comments
Number: 9 Created: 12/9/2003
[12/9/03] December 9, 2003 (Bob Zakely)
Plan looks OK.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 2 Created: 11 /28/2003
[11/28/03] Please show and label pumphouse dimensions on site plan.
Number: 3 Created: 11 /28/2003
[11/28/03] There is no landscaping shown anywhere around the building.
Landscape standards apply. Please provide foundation shrubs in accordance with
Section 3.2.1 of the Land Use Code for all but the west elevation.
Page 3
Number: 20 Created: 12/9/2003
[12/9/03] Provide a legend, each sheet.
Number: 21 Created: 12/9/2003
[12/9/03] Show, label & dimension all property boundaries, utility easements, ROW,
etc, each sheet.
Number: 22 Created: 12/9/2003
[12/9/031 Provide dimensions and radii for driveway or list all in a curve table so that
it can be laid out in the field.
Department: Light & Power Issue Contact: Monica Moore
Topic: General
Number: 6 Created: 12/5/2003
[12/5/03Coordinate power requirements with Light and Power Engineering (221-
6700). The electrical contractor should complete the Commercial Service Form to
determine entrance capacity and to verify whether or not the existing transformer is
sufficient.
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 7 Created: 12/8/2003
The minimum width of the access road shall be 12 Ft. This includes the road up to
the existing irrigation pump station. The gravel access road shall be compacted road
base able to support a 40-ton vehicle. The road cannot be 3/a inch gravel.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Grading Plan
Number: 10 Created: 12/9/2003
[12/9/03]
Please add a legend to the plan.
Provide a proposed finished floor elevation for the building, and call out spot
elevation along the access road.
Please add a proposed cross-section for the swale.
Topic: Utility Plan
Number: 11 Created: 12/9/2003
[12/9/03] Please provide a detail for the proposed riprap at the outlet end of the
drain line.
Page 2
�. STAFF PROJECT REVIEW
City of Fort Collins
BHA DESIGN Date: 12/10/2003
ROGER SHERMAN
4803 INNOVATION DR.
FT. COLLINS, COO 80525
Staff has reviewed your submittal for CITY OF FTC SOUTHWEST WATER PUMP
STATION PDP - TYPE I, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 13 Created: 12/9/2003
[12/9/03] The plan sets have not been submitted in accordance with the Larimer
County Urban Area Street Standards (LCUASS). Please see chapters 2, 3, and 7
for design requirements as well as Appendix El, E2, and E4. Any items not
included in the next submittal will become a new outstanding item.
Topic: Utility Plan
Number: 14 Created: 12/9/2003
[12/9/03] See attached appendix E4 for missing or incorrectly shown requirements
not specifically addressed in this comment letter. Any items unaddressed with the
next submittal will become a new comment.
Number: 16 Created: 12/9/2003
[12/9/03] Gravel is not an acceptable surface for the proposed driveway. Identify
how you will handle the curb cut to accommodate the proposed driveway. Show the
approximate area of construction if getting into the existing parking lot and add the
street cut note:
Limits of street cut are approximate. Final limits are to be determined in the field by
the City Engineering Inspector. All repairs to be in accordance with City street repair
standards.
Number: 17 Created: 12/9/2003
[12/9/03] Show the grading at the proposed drainage swale.
Number: 18 Created: 12/9/2003
[12/9/03] Show the limits of the existing pond.
Number: 19 Created: 12/9/2003
[12/9/03] Remove the SF line off the grading sheet and show it only on the drainage
and erosion control sheet.
Page 1