Adrian PDP
The following e-mail was generated by Eric Bracke on July, 7 2004 waiving
the traffic study:
From: Eric Bracke
Sent: Wednesday July 07, 2004 2:07 PM
To: Susan Joy
Subject: Troy Jones
Eight single family homes produces the following trips:
Adjustment Driveway
Factor Volume
Average Standard
Rate Deviation
Avg. Weekday 2-Way Volume 9.57 3.69 1.00
77
7-9 AM Peak Hour Enter 0.19 0.00 1.00
2
7-9 AM Peak Hour Exit 0.56 0.00 1.00
4
7-9 AM Peak Hour Total 0.75 0.90 1.00
6
4-6 PM Peak Hour Enter 0.64 0.00 1.00
5
4-6 PM Peak Hour Exit 0.37 0.00 1.00
3
4-6 PM Peak Hour Total 1.01 1.05 1.00
8
The project is below the threshold, therefore, no TIS is required.
Eric