Loading...
HomeMy WebLinkAboutADRIAN SUBDIVISION, 1ST FILING - PDP - 42-03A - REPORTS - TRAFFIC STUDYTIS Adrian PDP The following e-mail was generated by Eric Bracke on July, 7 2004 waiving the traffic study: From: Eric Bracke Sent: Wednesday July 07, 2004 2:07 PM To: Susan Joy Subject: Troy Jones Eight single family homes produces the following trips: Adjustment Driveway Factor Volume Average Standard Rate Deviation Avg. Weekday 2-Way Volume 9.57 3.69 1.00 77 7-9 AM Peak Hour Enter 0.19 0.00 1.00 2 7-9 AM Peak Hour Exit 0.56 0.00 1.00 4 7-9 AM Peak Hour Total 0.75 0.90 1.00 6 4-6 PM Peak Hour Enter 0.64 0.00 1.00 5 4-6 PM Peak Hour Exit 0.37 0.00 1.00 3 4-6 PM Peak Hour Total 1.01 1.05 1.00 8 The project is below the threshold, therefore, no TIS is required. Eric