No preview available
HomeMy WebLinkAboutADRIAN SUBDIVISION, 1ST FILING - PDP - 42-03A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETA -- F,3i ..,ject: �+� Date: � �- if Planner: Our Traffic Operations: Engineer: d Items Requested Redlinedems Being Returned °aj "' c J _a ° � N m c ' 0 Other Items Required 'Other ,� aReturned ffP Items being EngineeringZ Stormwater Water/Wastewater/F9 Traffic Operations Transportation Planning Transfort Engineering Pvmt. Light & Power Technical Services PFA ♦ 20 �zt -AU., A U TOTALS �c cp, ea7'w,i+ r� Other: Note: All redlined items should be returned with the resubmittal/revisions. Please cal/ 221-6750 to schedule a resubmittal appointment.