HomeMy WebLinkAboutFORT COLLINS INTEGRATED RECYCLE CENTER - PDP - PDP130020 - CORRESPONDENCE -Comment Number: 2 Comment Originated: 07/02/2013
*07/02/2013: Please describe the outfall in more detail. Is there an existing swale in the Railroad
ROW? Is the swale stable for these proposed flows?
Comment Number: 3 Comment Originated: 07/02/2013
07/02/2013: The calculations show .08 ac-ft is required for extended detention, not .04 ac-ft.
Comment Number: 4 Comment Originated: 07/02/2013
07/02/2013: At final, the design of the LID techniques can be finalized regarding all specifications and
landscaping.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffington(Mcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 07/02/2013
07/02/2013: Will water and sewer service be provided to the Service Shed shown on the plans?
Comment Number: 2 Comment Originated: 07/02/2013
07/0212013: Please include information on the utility plans showing all water/sewer services/facilities
for the site.
Department: Zoning
Contact: Gary Lopez, 970.416.2338, glopez(Mcuov.com
Topic: General
Comment Number: 1
07/01/2013: No comments
Comment Originated: 07/0112013
SL�Q L e "-1w, 4 ivndLrvsa ti
J, M n�Cv2+\Qf - ���WGIwS ,tea iz S �Kl �^ r J�rorn leant, taut
N\ar'ew — A2ML SIJ4?
�ceor�katt- 1.Judl-t.
Page 3of3
Topic: Traffic Impact Study
4
Comment Number: 1 Comment Originated: 07103/2013
07/03/2013: The traffic study mentions that a Full movement intersection or possibly a 3/4 movement
intersection are likely for combined access onto Timberline. It should be noted that preliminary
information from the Timberline design would suggest that a 3/4 movement or possibly right in and
right out is likely for this intersection.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224-6143, lex(a)fcgov.com
Topic: General
Comment Number: 1
07/02/2013: No comments from Environmental Planning.
Department: Light And Power
Contact: Doug Martine, 970-224.6152, dmartineg?fcgov.com
Topic: General
Comment Number: 1
06/14/2013: Light & Power Engineering will need:
'A Commercial Service Information (C-1) form completed.
'A paper or pdf of the electric service 1-line diagram.
'Coordinate a location for an electric transformer.
'A paper or pdf of the signed and recorded subdivision plat.
'The name/address of who to invoice for the electric development charges.
Please contact Light & Power Engineering at (970)221-6700
Comment Number: 2
Comment Originated: 07/02/2013
Comment Originated: 06/14/2013
Comment Originated: 06/14/2013
06/14/2013: After the plans are final, please send an AutoCad drawing (version 2008) of the utility plan
to Terry Cox at TCOX@FCGOV.COM.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218.2932, ischlam&fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 07/02/2013
07/02/2013: The site disturbs more than 10,000 sq-ft, therefore, Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater
Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control
Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion
Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section,
or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Contact: Wes Lamarque, 970.416.2418, wiamargue(@fcqov.com
Topic: General
Page 2 of 3
F6rt Collins
July 03, 2013
Daman Holland
Ripley Design, Inc.
401 W. Mountain Ave. #100
Fort Collins, CO 80525
RE: Fort Collins Integrated Recycle Center, PDP130020, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6760
970.224.6134 - fax
fcgov.com/deve/0pmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Lindsay Ex, at 970-224-6143 or lex@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221.6603, agingerich(Wegov.com
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 07/03/2013
07/03/2013: Please refer to all easements as alignments.
Comment Number: 6 Comment Originated: 07/03/2013
07/03/2013: There is a callout to an 18" RCP on the bottom right of sheet 2 and the RCP is not
currently shown.
Topic: General
Comment Number: 3
Comment Originated: 07/03/2013
07/03/2013: Please shown the future right of way line for Timberline along the frontage of this project.
Comment Number: 4 Comment Originated: 07103/2013
07/03/2013: As discussed previously this project is responsible for its local street portion along
Timberline Road, Approx. 400' of frontage at $204/1.f. Additional discussions should be had as to how
the City works this out internally.
Comment Number: 7
Comment Originated: 07/03/2013
07/03/2013: 1 will be meeting internally this afternoon to discuss this review with Sheri as we have not
been able to discuss prior due to vacation conflicts. I will have my comments finalized this afternoon.
Topic: Site Plan
Comment Number: 2
Comment Originated: 07/03/2013
07/03/2013: Access easements shown on the site plan should be called access alignments as the
City can not dedicate easements to itself. These will need to be processed by separate document.