Loading...
HomeMy WebLinkAboutFORT COLLINS INTEGRATED RECYCLE CENTER - PDP - PDP130020 - CORRESPONDENCE -Comment Number: 2 Comment Originated: 07/02/2013 *07/02/2013: Please describe the outfall in more detail. Is there an existing swale in the Railroad ROW? Is the swale stable for these proposed flows? Comment Number: 3 Comment Originated: 07/02/2013 07/02/2013: The calculations show .08 ac-ft is required for extended detention, not .04 ac-ft. Comment Number: 4 Comment Originated: 07/02/2013 07/02/2013: At final, the design of the LID techniques can be finalized regarding all specifications and landscaping. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221.6854, rbuffington(Mcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 07/02/2013 07/02/2013: Will water and sewer service be provided to the Service Shed shown on the plans? Comment Number: 2 Comment Originated: 07/02/2013 07/0212013: Please include information on the utility plans showing all water/sewer services/facilities for the site. Department: Zoning Contact: Gary Lopez, 970.416.2338, glopez(Mcuov.com Topic: General Comment Number: 1 07/01/2013: No comments Comment Originated: 07/0112013 SL�Q L e "-1w, 4 ivndLrvsa ti J, M n�Cv2+\Qf - ���WGIwS ,tea iz S �Kl �^ r J�rorn leant, taut N\ar'ew — A2ML SIJ4? �ceor�katt- 1.Judl-t. Page 3of3 Topic: Traffic Impact Study 4 Comment Number: 1 Comment Originated: 07103/2013 07/03/2013: The traffic study mentions that a Full movement intersection or possibly a 3/4 movement intersection are likely for combined access onto Timberline. It should be noted that preliminary information from the Timberline design would suggest that a 3/4 movement or possibly right in and right out is likely for this intersection. Department: Environmental Planning Contact: Lindsay Ex, 970.224-6143, lex(a)fcgov.com Topic: General Comment Number: 1 07/02/2013: No comments from Environmental Planning. Department: Light And Power Contact: Doug Martine, 970-224.6152, dmartineg?fcgov.com Topic: General Comment Number: 1 06/14/2013: Light & Power Engineering will need: 'A Commercial Service Information (C-1) form completed. 'A paper or pdf of the electric service 1-line diagram. 'Coordinate a location for an electric transformer. 'A paper or pdf of the signed and recorded subdivision plat. 'The name/address of who to invoice for the electric development charges. Please contact Light & Power Engineering at (970)221-6700 Comment Number: 2 Comment Originated: 07/02/2013 Comment Originated: 06/14/2013 Comment Originated: 06/14/2013 06/14/2013: After the plans are final, please send an AutoCad drawing (version 2008) of the utility plan to Terry Cox at TCOX@FCGOV.COM. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218.2932, ischlam&fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 07/02/2013 07/02/2013: The site disturbs more than 10,000 sq-ft, therefore, Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970.416.2418, wiamargue(@fcqov.com Topic: General Page 2 of 3 F6rt Collins July 03, 2013 Daman Holland Ripley Design, Inc. 401 W. Mountain Ave. #100 Fort Collins, CO 80525 RE: Fort Collins Integrated Recycle Center, PDP130020, Round Number 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov.com/deve/0pmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Lindsay Ex, at 970-224-6143 or lex@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Andrew Gingerich, 970-221.6603, agingerich(Wegov.com Topic: Construction Drawings Comment Number: 5 Comment Originated: 07/03/2013 07/03/2013: Please refer to all easements as alignments. Comment Number: 6 Comment Originated: 07/03/2013 07/03/2013: There is a callout to an 18" RCP on the bottom right of sheet 2 and the RCP is not currently shown. Topic: General Comment Number: 3 Comment Originated: 07/03/2013 07/03/2013: Please shown the future right of way line for Timberline along the frontage of this project. Comment Number: 4 Comment Originated: 07103/2013 07/03/2013: As discussed previously this project is responsible for its local street portion along Timberline Road, Approx. 400' of frontage at $204/1.f. Additional discussions should be had as to how the City works this out internally. Comment Number: 7 Comment Originated: 07/03/2013 07/03/2013: 1 will be meeting internally this afternoon to discuss this review with Sheri as we have not been able to discuss prior due to vacation conflicts. I will have my comments finalized this afternoon. Topic: Site Plan Comment Number: 2 Comment Originated: 07/03/2013 07/03/2013: Access easements shown on the site plan should be called access alignments as the City can not dedicate easements to itself. These will need to be processed by separate document. Page 1 of 3