HomeMy WebLinkAboutRAISING CANE'S - PDP - 6-04 - CORRESPONDENCE - (3)r
separation from Enterprise. Joint access with Enterprise may not be as difficult since the
grade change becomes less severe closer to College Avenue.
14. There is a requirement that the first parking stall be set back from the College Avenue
flowline by as much as 100 feet. This is to prevent any disruption in through traffic on
the roadway while cars are maneuvering in the parking lot. This distance could possibly
be reduced depending on volume on the roadway and would require an analysis that
would be part of the Transportation Impact Study. Any reduction from the standard must
be approved as an administrative variance granted by the City Engineer. Please contact
Marc Virata, 221-6605 for further information.
15. The design of the new curb, gutter and sidewalk on College Avenue may need to extend
beyond the limits of the property in _order to evaluate the impact on the abutting
properties. The walk must be at least seven feet wide and the parkway at least ten feet
wide.
16. Utility Plans are required as part of the submittal for a Project Development Plan. A
Development Agreement will be required between the developer and the City for the
construction and inspection of public improvements. A Development Construction
Permit and Fee is required prior to beginning work on the site. For further information
regarding civil engineering issues, please contact Marc Virata, 221-6605.
17. A plat will be required. The plat will need to show a dedication of public right-of-way so
that there is 70.5 feet from property line to the centerline of College Avenue. Behind the
right-of-way, there will need to be a 15-foot wide utility easement.
18. Improvements to College Avenue include minimum two-inch caliper deciduous shade
trees planted at 30 to 35 foot intervals located in the parkway between sidewalk and curb.
19. The corporate prototype architecture will have to be toned down in order to comply with
Section 3.5 of the Land Use Code. In particular, the large mural may be questionable and
warrants further discussion. Outdoor patio dining is highly encouraged.
20. The adjacent residential area may have to be protected from headlight glare, noise from
equipment, security lighting, etc. by landscaping and screening that exceeds the minimum
requirements of the Land Use Code. Parking lot security lights may have to be equipped
with "house side shields" to prevent illumination from spilling into the residential area.
21. A neighborhood meeting with the residents of the adjacent condominiums and owners of
the offices and rental car company will be required.
22. The size of the trash enclosure should be enlarged to include space for containers for
recyclable materials. The use of irrigated turf is discouraged. Native plants and grasses
are encouraged. For a list of drought -tolerant species, please contact either Doug Moore
at 221-6750 or Laurie D'Audney at 221-6700.
addition to the tap fees, there is the Raw Water Acquisition Fee. All fees are due at the
time of building permit issuance. For an estimate of these fees, please contact Mary
Young. For further information regarding water and sewer issues, please contact Jeff
Hill. Both are available at 221-6700.
8. The site will be served by the Poudre Fire Authority. A fire hydrant must be within 300
feet of the building capable of delivering a minimum of 1,500 gallons per minute at 20
p.s.i. Access to buildings must such that no portion of the building can be more than 150
feet from where the fire truck sets up. If there are internal fire access lanes, then these
lanes must feature no less than 25 feet inside and 50 feet outside turning radii.
Designated fire lanes must feature curbs painted red and "No Parking — Fire Lane" signs.
Addresses must be no less than six inches in height and visible from South College
Avenue. The hood and vent system must meet the Uniform Building Code and Larimer
County Health Department. If the exterior features of the hood and vent system must be
screened from view. For further information, please contact Ron Gonzales, 221-6570.-
9. The Street Oversizing Fee will be $25.07 per square foot of building and payable at the
time of building permit issuance. Keep in mind all City fees are adjusted annually. In
addition, the City collects the Larimer County Road Fee. There is information on the
City's web site explaining the Street Oversizing Program. Please contact Matt Baker,
221-6605, for additional detail regarding this fee.
10. A Transportation Impact Study will be required. Please contact Eric Bracke, 221-6630,
to determine the scope of the study and the number of intersections that need to be
analyzed. All modes of travel (bikes, pedestrians and transit) must be addressed in the
Study.
11. Staff supports the incorporation of Tract Two into the Project Development Plan (P.D.P.)
.in order to facilitate both water quality extended detention and bicycle pedestrian access
to Remington Street. If there is to be vehicle access out to Remington, then such access
should be analyzed in the Transportation Impact Study.
12. The Capital Improvement Expansion Fee is .53 cents per square foot, payable at the time
of building permit. For an accurate estimate of this fee, please contact the Building
Inspection Division, 221-6760. Please note fees are adjusted annually.
13. The applicant should be aware that Highway 287 is under the jurisdiction of the Colorado
Department of Transportation. As such, access is controlled by CDOT and their policy is
to consolidate extraneous curb cuts and driveways on the state highway system. The City
works very closely with CDOT on administration of the State Highway Access Code.
After meeting with CDOT on July 17, 2003, the City will require that southerly of the
two curb cuts be restricted to one-way right -in only travel. This would allows the parking
stalls be diagonal. The northerly curb cut must be restricted to one-way right -out only
and should be consolidated with Enterprise Rental Car. If it is not possible to
consolidate, then the northerly curb cut should be shifted as far south as feasible to gain
for emergency change -out and screened for aesthetic purposes, if visible from a public
street.
4. A Commercial One ("C-1") Form must be completed by a licensed electrical contractor
to determine entrance capacity. Normal electrical development fees and charges will
apply. Any change to the existing electrical system or facilities will'be at the developer's
expense. With frontage along a public street, shade trees will be required in the parkway
between sidewalk and curb. Street trees must be kept 40 feet from streetlights and
ornamentals must be kept 15 feet from streetlights where applicable. For further
information, please contact Judy Dahlgren, 221-6700.
5. This site is in the Spring Creek drainage basin where the new development fee is
$2,175/acre which is applicable only to the amount of new impervious surface. Existing
impervious surface is grandfathered-in. Extended stormwater detention, however, is
required to treat the runoff prior to release into the approved outfall system. The outfall
would be Remington Street. Stormwater is not allowed to drain onto College Avenue or
into the Arthur Ditch.
The design engineer will need to document the existing imperviousness and the drainage
outfall points. If the site drains to the Arthur irrigation ditch, which is no longer allowed,
an outfall to a City Right Of Way or drainage easement is required. There is a storm
sewer in College Avenue which can be used as an out fall. This storm sewer will need to
be verified since the inventory map 8K shows it draining into the Arthur ditch but other
information has indicated it drains to Spring Creek.
The standard drainage and erosion control reports are required and they must be prepared
by a professional engineer registered in Colorado. For further information regarding
design of the stormwater system, please contact Glen Schlueter, 221-6700.
Since the property does have a small portion of the Arthur ditch on it, The ditch company
will need to approve the construction plans. The Arthur Irrigation Company
superintendent is Bob Hartung (970) 493-4575, the president is Calvin Johnson (970)
223-5148.
6. The site will continue to be served by the City of Fort Collins Water and Wastewater
Utility. Regarding the sanitary sewer, there is a possibility that Mister Money was served
by an old septic system. The restaurant must hook up to the existing six-inch diameter
sanitary sewer in Dartmouth. A grease and oil interceptor is required.
7. Regarding the water service, the existing water service could be a small as three-quarters
diameter and would not be sufficient to serve the proposed use. A new water service
must be tapped at the main and the old one must be abandoned at the main. The water
main is in College Avenue. A street cut permit and fee are required from the City and
Utility Permit is required from Colorado Department of Transportation (CDOT) which
has jurisdiction over State Highway 287. The water meter pit must be located outside the
building. The existing services would be credited towards the Plant Investment Fees. In
CONCEPTUAL REVIEW STAFF COMMENTS
of Fort Collins
ITEM: Raising Cane's Drive -Through Restaurant 2104 South College
Avenue
MEETING DATE: July 14, 2003
APPLICANT: Mr. Brad Sanders and Mr. Joshua Demoruelle, Raising Cane's,
1212 S. Acadian Thruway, Baton Rouge, LA, 70806.
LAND USE DATA: Request. for 3,533 square foot drive -through restaurant at 2104 South
College Avenue (formerly Mister Money). The lot (Tract One) is approximately one-half acre in
size. Tract Two is 18,040 square feet in size and may or may not be incorporated into the Project
Development Plan. The site is located on the east side of South College Avenue, between
Rutgers and Spring Park Drive, just south of Enterprise Rental Car.
COMMENTS:
1.. The site is zoned C, Commercial. The land use is permitted, subject to review by the
Planning and Zoning Board. In preparing the site layout, please be aware that there is a
maximum of 15 parking spaces allowed per 1,000 square feet of building area which
would allow up to 52 parking stalls. Also, the building must meet the "build -to line"
standard along an arterial street and must not be placed more than 25 in back of the front
property line. The parking lot must feature no less than 6% interior landscaping in the
form of islands. There must be a landscape island for every 15 consecutive parking
spaces. The trash enclosure must be made of materials that match the building. The
menu board sign is deducted from the overall signage allowance. All signs are governed
by the Sign Code and are reviewed and permitted separately from the P.D.P. The mural
would come out of the signage allowance.
2. It appears the property is not part of an approved subdivision plat. In order to pull a
building permit, the property would need to be platted as part of an approved subdivision.
All dedications for right-of-way and for access, utility and drainage easements can be
dedicated by plat.
3. The source of electrical power is an existing overhead power line. This line will have to
be placed underground and placed within an easement. Three-phase power is available in
the southeast corner of the site. The location of the transformer must be coordinated with
Light and Power. Transformers must be both accessible (within ten feet) to hard surface
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
Comma .,Ly Planning and Environmental _ xvices
Current Planning
City of Fort Collins
July 18, 2003
Mr. Brad Sanders
Raising Cane's
1212 S. Acadian Thruway
Baton Rouge, LA 70806
Dear Brad:
For your information, attached is a copy of the Staff's comments for the Raising Cane's Drive -
Through Restaurant, 2104 South College Avenue which was presented before the Conceptual
Review Team on July 14, 2003..
The comments are offered by staff to assist you in preparing the detailed components of the
project application. Modifications and additions to these comments may be made at the time of
formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 970-221-6750.
Sincerely,
i�
Ted Shepard
Chief Planner
cc: Project Planner
File
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6750 - FAX (970) 416-2020