HomeMy WebLinkAboutRAISING CANE'S - PDP - 6-04 - CORRESPONDENCE - REVISIONSNumber: 5
Acknowledged.
Current Planning — Ted Shepard
1. See plans
A. Elevations to be turned in after coordination meeting to be held on Mar. 26.
B. Acknowledged. Trees and wall are intended for necessary buffering. Any
additional required buffering to be discussed at Mar. 26 meeting.
Xcel Energy
1. Acknowledged.
2. Acknowledged.
Technical Services
1. Legal has been revised properly.
2. The Arthur Ditch has been properly dimensioned on the plans.
3. A legend has been added to the plat.
Thank you for your consideration,
Amy C. Johnson
VF Ripley Associates.
Responses here also provided by Chris Parton at Northern Engineering
Traffic Operations — Eric Bracke
Topic: Traffic
Number: 1
Parking has been changed accordingly.
Transportation Planning — Tom Reiff
Topic: Transportation
Number: 29
More information is shown for the area south of the site, including grades.
Number: 30
Ramps have been indicated.
Number: 31
More space has been provided for pedestrian circulation around bike rack.
Number: 32
Acknowledged — the trees have been properly labeled.
Water Wastewater — Jeff Hill
Topic: landscape
Acknowledged.
Topic: Utility
Number: 25
Appropriate detail regarding utility locations, grease/oil separators, etc., has been added
to the plans.
Number: 26
The existing manhole in the Dartmouth/Remington intersection will be core drilled for
the proposed sanitary sewer line connection.
Number: 27
All water fittings, pipes, meters, service lines, etc., have been called out on the plans.
Number: 28
Acknowledged.
Zoning — Peter Barnes
Topic: zoning
Number: 3.
A tree has been put in the island.
Number: 4
The ramp has been labeled.
PFA — Michael Chavez
Topic: General
Number: 9
Acknowledged
Number: 10
A fire hydrant is located just south of the proposed entrance onto College Avenue, and
should satisfy the requirements for hydrant locations.
Number: 11
1. Escape lane width has been adjusted. See plans.
2. Radius has been adjusted. See plans.
3. Acknowledged.
4. Acknowledged.
Number: 12
Acknowledged — fire lane will be provided.
Number: 13
Acknowledged.
Number: 14
Acknowledged.
Police — Joseph Gerdom
Topic: General
Number: 17
Lighting plan is being submitted, and landscaping has been adjusted.
Stormwater Utility — Wes Lamarque
Topic: Drainage
Number: 33
The requested calculation is attached.
Number: 34
The proposed stormwater quality pond will discharge into the face of the curb for the new
drive. Stormwater then flows north on Remington to Spring Creek. There is no low -
point at the intersection of this private drive and the Dartmouth/Remington intersection,
therefore a valley pan has not been added to the plans.
Number: 35
A drainage report documenting proposed runoff calculations and exhibits, stormwater
quality calculations and exhibits, etc.
Number: 36
Acknowledged.
Number: 38
The proposed contours have been shown to tie into the existing grades along the east side
of College Avenue.0
Topic: Plat
Number: 20
Corrected.
Number: 21
Corrected.
Number: 37
The access easement has been added to the plat.
Number: 39
A copy of the ditch company's compliance with the general compliance is included.
Topic: Utility
Number: 19
Appropriate wording regarding the proposed street patches has been added to the plans.
Number: 23
The proposed retaining walls will be constructed outside of the right-of-way for College
Avenue.
Number: 40
The proposed drive at the northeast corner of the site is shown to be reconstructed, and is
believed to be in compliance with the LCUASS as it is shown in the revised plans.
Number: 41
.All paving on the site will be concrete, including the aprons off of College Avenue. The
radii for the proposed entrance and exit into and out of the site has been added to the
plans.
Light and Power — Bruce Vogel
Topic: General
Number: 16
Transformer pad has been located east of building.
Natural Resources — Doug Moore
Topic City Plan Principles and Policies
Number: 2
Acknowledged.
V FriiPI�yASSOCIATES INC
Landscape Architecture Urban Design Planning.
March 23, 2004
Ted Shepard
City of Fort Collins Planning Department
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
RE: Response to comments letter, for RAISING CANE'S.
Dear Ted,
The comments below address the issues raised by city staff regarding the Raising Cane's
Project. Please also refer to the redlines/plans for additional responses.
ISSUES:
Engineering — Marc Virata
Topic: General
Number: 6.
Parking has been changed accordingly.
Number: 7
Curb has now been turned on. See plans.
Number: 8
Appropriate signage and pavement markings have been added to the plans in order to
direct traffic throughout the site.
Number 18
The drives have been adjusted. See plans
Number: 22
The wall that appears to obstruct the sidewalk is existing, and will be removed. The new
retaining wall should not conflict with the new sidewalk, if constructed properly.