Loading...
HomeMy WebLinkAboutRAISING CANE'S - PDP - 6-04 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYFUTURE TRANSIT LEVEL OF SERVICE Travel Time Worksheet Destination Approximate Distance Auto Travel Time Bus Travel Time Travel Time Factor CSU Campus Transit Center 1.5 10 22 Foothills Fashion Mall 1.3 10 22 Fort Collins High School 3.7 15 44 Downtown Fort Collins 2.0 11 25 Total Travel Time 46 113 2.5 Service Level Standards Worksheet Mixed Use Remainder of Standard Centers and the Service Meets Standard Fails Standard Commercial.. Area Hours of Weekday Service 18 hours 16 hours Weekday Frequency of Service 15 minutes 20 minutes Travel Time Factor 2.0 x 2.0 x Peak Load Factor < 1.2 _< 1.2 X 3of4=LOSB 5 Eel G C J V N V Iml I L Q1 O L > y ii V y LO 0 O � V •� v O V ti _ 06. v 0.3 bD u V V 41 �n fld Ed m n n Ol �rAA � u L C l — c � z m n n Ol �rAA � u L C l — c � z � u L C l — c � z Prospect Stuart OSpring Johnson paw O Ru ers m 17 0 Drake SCALE: 1°=10W BICYCLE INFLUENCE AREA m R �o e y � v O a N '• i 0.�.a R N _ O R � J �I y tn N R a �- r C V y V 4 o J y 00 V� 1 ti v U N R a �- r C V y V 4 o J y 00 V� 1 ti v U 4 o J y 00 V� 1 ti v U 1 ti v U Prospect Stuart 5 spdry Johnson pal* O Ru ers m m 0 ro Drake SCALE 1"=IOW PEDESTRIAN INFLUENCE AREA 4d APPENDIX G 3q HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/9/2003 Analysis Time Period: noon pm Intersection: College/Exit Only Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short on total Project ID: 0364 East/West Street: Exit Only North/South Street: College Avenue Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach — Northbound Southbound Movement 1 2 3 1 4 5 6 L T R L T R Volume 1703 Peak -Hour Factor, PHF 0.95 Hourly Flow Rate, HFR 1792 Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes 2 Configuration T Upstream Signal? No No minor street: Approach Westbound Eastbound Movement 7 8 9 10 11 12 L T R I L T R volume 25 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 29 Percent Heavy Vehicles 2 Percent Grade.(%) 0 0 Flared Approach: Exists?/Storage Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 1 7 8 9 I 10 11 12 Lane Config I R v (vph) 29 C(m) (vph) 339 v/c 0.09 95% queue length 0.28 Control Delay 16.6 LOS C Approach Delay 16.6 Approach LOS C HCS2000: Unsignalized°Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/9/2003 Analysis Time Period: noon pm Intersection: o lege/Exit Only Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short long total Project ID: 0364 East/West Street: Exit Only North/South Street: College Avenue Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 3" 1 4 5 6 L T R I L T R Volume 1553 Peak -Hour Factor, PHF 0.96 Hourly Flow Rate, HFR 1617 Percent Heavy Vehicles -- -- -- -- Median Type/Storage Undivided / RT Channelized? Lanes 2 Configuration T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 35 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 41 Percent Heavy Vehicles 2 Percent Grade (%) 0 0 Flared -Approach. Exists?/Storage Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 j 7 8 9 I 10 11 12 Lane Config I R I v (vph) 41 C(m) (vph) 381 v/c 0.11 95% queue length 0.36 Control Delay 15.6 LOS C Approach Delay 15.6 Approach LOS C 37 HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon(9) Year recent short long bkgrd total Project ID: 0364 E/W St: Spring Park/Johnson N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R 1 I I I I I No. Lanes 1 0 1 0 1 1 1 0 1 1 3 0 1 1 3 0 1 LGConfig I LTR I L TR I L TR I L TR 1 Volume 110 0 25 175 0 45 120 2230 20 155 3125 10 1 Lane Width 1 12.0 112.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol 1 0 I 0 I 0 1 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A 1 Thru P Right A I Right P Peds X 1 Peds X WB Left A 1 SB Left P Thru A I Thru P Right A 1 Right P Peds X I Peds X NB Right 1 EB Right SB Right I WB Right Green 12.0 12.0 85.0 Yellow 3.0 3.0 4.0 All Red 2.0 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 159 1661 0.23 0.10 53.0 Westbound L 184 1770 0.43 0.10 54.1 TR 152 1583 0.31 0.10 53.8 Northbound L 60 87 0.35 0.69 17.8 TR 3454 5079 0.69 0.68 5.1 Southbound L 71 103 0.82 0.69 68.0 TR 3456 5083 0.95 0.68 14.0 Intersection Delay = 12.1 (sec/veh) D 53.0 D D D 54.0 D. B A 5.3 A E B 15.0 B Intersection LOS = B 30 HCS2000: Signalized intersections Release 4.1d Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon pm Year recent short ong bkgrd tota Project 0364 E/W St: Spring Park/Johnson N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound I Northbound I Southbound 1 I L T R I L T R I L T R I L T R I No. Lanes 0 1 0 1 1 0 1 3 0 I 1 3 0 LGConfig I LTR I L TR I L TR I L TR I Volume 120 0 15 150 0 50 125 2090 20 155 2510 15 1 Lane Width I 12.0 112.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol 1 0 I 0 I 0 I 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A I Thru P Right A I Right P Peds X I Peds X WB Left A SB Left P Thru A I Thru P Right A I Right P Peds X I Peds X NB Right I EB Right SB Right I WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red 2.0 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary . Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 164 1706 0.23 Westbound L 227 1770 0.23 TR 190 1583 0.28 Northbound L 60 90 0.43 TR 3331 5078 0.66 Southbound L 80 121 0.71 TR 3333 5081 0.79 Intersection Delay = 9.3 0.10 52.9 D 52.9 D 0.13 49.5 D 0.12 50.9 D 50.2 D 0.66 25.1 C 0.66 6.5 A 6.7 A 0.66 47.3 D 0.66 8.4 A 9.2 A (sec/veh) Intersection LOS = A 3 5� HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon pm Year recent short ong bkgrd otal Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound ► I L T R ► L T R I L T R I L T R 1 I I I I I No. Lanes 1 1 1 0 1 1 1 0 1 1 3 0 I 1 3 1 1 LGConfig I L TR ► L TR I L TR I L T R Volume 1180 20 65 135 20 10 160 2390 15 145 2840 140 ► Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 ► Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 E EB Left A 1 NB Left P Thru A I Thru P Right A I Right P Peds X 1 Peds X WB Left A 1 SB Left P Thru A I Thru P Right A I Right P Peds X I Peds X NB Right ► EB Right SB Right ► WB Right Green 26.0 91.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 274 1321 0.69 0.21 54.8 D TR 330 1649 0.27 0.20 44.4 D 51.5 D Westbound L 260 1254 0.14 0.21 42.3 D TR 353 1767 0.09 0.20 42.5 D 42.4 D Northbound L 57 81 1.07 0.71 148.1 F TR 3557 5081 0.69 0.70 4.0 A 7.5 A Southbound L 69 98 0.67 0.71 43.3 D T 3559 5085 0.82 0.70 5.8 A 6.2 A R 1108 1583 0.1.3 0.70 1.9 A Intersection Delay = 9.3 (sec/veh) Intersection LOS = A secs , HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins ' Period: noon pm Year recent short ong bkgrd tot Project 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 ' I L T R I L T R I L T R I L T R 1 I I I I I No. Lanes 1 1 1 0 I 1 1 0 1 1 3 0 1 1 3 1 1 LGConfig I L TR 1 L TR I L TR I L T R I Volume 1210 20 65 150 20 10 170 2145 20 145 2235 90 1 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol I 0 1 0 I 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 ' EB Left A I NB Left P Thru A I Thru P Right A I Right P Peds X I Peds X WB Left A I SB Left P Thru A I Thru P Right A I Right P Peds X I Peds X NB Right I EB Right SB Right I WB Right Green 29.0 88.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs ' Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/C g/C Delay LOS Delay LOS Eastbound L 306 1326 0.72 0.23 54.3 D TR 368 1649 0.24 0.22 41.8 D 50.7 D Westbound L 291 1259 0.18 0.23 40.5 D TR 394 1767 0.08 0.22 40.0 D 40.3 D Northbound L 71 104 1.04 0.68 125.5 F TR 3437 5078 0.66 0.68 5.3 A 9.1 A Southbound L 79 115 0.59 0.68 32.4 C T 3442 5085 0.68 0.68 5.5 A 5.9 A R 1072 1583 0,09 0.68 2.7 A Intersection Delay = 10.5 (sec/veh) Intersection LOS = B 33 APPENDIX F 3Z HCS2000: Unsignalized Intersections Release 4.1d ' TWO-WAY STOP CONTROL SUMMARY Analyst: Michael ' Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/9/2003 Analysis Time Period: noon pm Intersection: College/Exit Only ' Jurisdiction: Fort Collins Units: U. S. Analysis Year: Customary shor long total ' Project ID: 0364 East/West Street: Exit Only North/South Street: College Avenue ' Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 3 1 4 5 6 L T R L T R Volume 1400 Peak -Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 1521 Percent Heavy Vehicles -- -- -- -- ' Median Type/Storage Undivided / RT Channelized? Lanes 2 Configuration T ' Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement 7 8 9 I 10 11 12 L T R I L T R ' Volume 25 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 29 Percent Heavy Vehicles 2 ' Percent Grade (%) 0 0 Flared Approach: Exists?/Storage Lanes 1 . Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 1 7 8 9 I 10 11 12 Lane Config I R v (vph) 29 C(m) (vph) 406 v/c 0.07 95% queue length 0.23 Control Delay 14.5 LOS B Approach Delay 14.5 Approach LOS B 3' HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/9/2003 Analysis Time Period: noon pm Intersection: College/Exit Only Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: isEDlong tots Project ID: 0364 East/West Street: Exit Only North/South Street: College Avenue Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 3 14 5 6 L T R I L T R Volume 1283 Peak -Hour Factor, PHF 0.96 Hourly Flow Rate, HFR 1336 Percent Heavy Vehicles -- -- -- -- Median Type/Storage Undivided / RT Channelized? Lanes 2 Configuration T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement 7 8 9 I 10 11 12 L T R I L T R Volume 35 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 41 Percent Heavy Vehicles 2 Percent Grade (%). 0 _,.._ 0 Flared Approach: Exists?/Storage Lanes 1 Configuration R Approach Movement Lane Config v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS Delay, Queue Length, and Level of Service NB SB Westbound Eastbound 1 4 I 7 8 9 I 10 11 I R I 41 458 0.09 0.29 13.6 B 13.6 B 12 HCS2000: Signalized Intersections Release 4.1d ' Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins ' Period: noon pm Year recent ort long bkgrd otal Project ID: 0 64 E/W St: Spring Park/Johnson NIS St: College Avenue ' SIGNALIZED INTERSECTION SUMMARY I Eastbound 1 Westbound ( Northbound 1 Southbound 1 I L T R I L T R I L T R I L T R 1 I I I i I No. Lanes 1 0 1 0 1 1 1 0 1' 1 3 0 1 1 3 0 I LGConfig 1 LTR I L TR I L TR I L TR 1 Volume 110 0 25 175 0 45 120 1800 20 155 2520 10 1 Lane Width 1 12.0 112.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 1 Duration 0.2§ Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 ' EB Left A 1 NB Left P Thru A 1 Thru P Right A 1 Right P ' Peds X 1 Peds X WB Left A 1 SB Left P Thru A 1 Thru P Right A 1 Right P ' Peds X 1 Peds X NB Right 1 EB Right SB Right 1 WB Right ' Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red 2.0 2.0 2.0 Cycle Length: 125.0 ' Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) V/c g/C Delay LOS Delay LOS Eastbound LTR 159 1661 0.26 0.10 53.2 D 53.2 D Westbound 'L 227 1770 0.39 0.13 51.1 D TR 190 1583 0.28 0.12 50.9' D 51.0 D Northbound L 60 90 0.37 TR 3331 5077 0.59 ' Southbound L 108 162 0.55 TR 3334 5082 0.81 Intersection Delay = 9.4 0.66 20.1 C 0.66 5.9 A 0.66 22.8 0.66 8.8 (sec/veh) 6.0 A C A 9.1 A Intersection LOS = A secs 2Y HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10 17/2003 Jurisd: Fort Collins Period:(_p2oo pm Year recent short ong bkgrd total Project ID: 0364 E/W St: Spring Park/Johnson N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 I L T R I L T R I L T R I L T R 1 I I I I I No. Lanes I 0 1 0 I 1 1 0 I 1 3 0 I 1 3 0 1 LGConfig I LTR I L TR I L TR I L TR I_ Volume 120 0 15 150 0 50 125 1700 20 155 2030 15 1 Lane Width 1 12.0 112.0 12.0 112.0 12.0 112.0 12.0 i RTOR Vol 1 0 1 0 1 0 I 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A I NB Left P Thru A 1 Thru P Right A i Right P Peds X I Peds X WB Left A 1 SB Left P Thru A 1 Thru P Right A I Right P Peds X I Peds X NB Right I EB Right SB Right 1 WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 - All Red 2.0 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 164 1706 0.26 Westbound L 227 1770 0.25 TR 190 1583 0.30 Northbound L 88 133 0.30 TR 3330 5076 0.54 Southbound L 136 205 0.42 TR 3332 5080 0.64 Intersection Delay = 7.7 0.10 53.2 D 0.13 49.7 D 0.12 51.1 D 0.66 11.8 B 0.66 5.4 A 0.66 13.1 0.66 6.3 (sec/veh) 53.2 D 50.4 D 5.5 A B A 6.5 A Intersection LOS = A Z �i HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon pm Year recent short long bkgr total Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R i L T R 1 L T R 1 I I I I I No. Lanes 1 1 1 0 1 1 1 0 ► 1 3 0 I 1 3 1 1 LGConfig I L TR i L TR I L TR ► L T R Volume 1180 20 65 135 20 10 160 1935 15 145 2280 140 1 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 ► RTOR Vol 1 0 1 0 1 0 1 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A I NB Left P Thru A I Thru P Right A ► Right P Peds X I Peds X WB Left A I SB Left P Thru A I Thru P Right A I Right P Peds X ► Peds X NB Right 1 EB Right SB Right I WB Right . Green 26.0 91.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 273 1316 0.78 0.21 61.8 E TR 330 1650 0.30 0.20 44.8 D 56.4 R Westbound L 258 1242 0.16 0.21 42.5 D TR 354 1770 0.10 0.20 42.6 D 42.5 D Northbound L 79 112 0.77 0.71 54.1 D TR 3556 5080 0.56 0.70 3.1 A 4.6 A Southbound L 123 174 0.37 0.71 10.2 B T 3559 5085 0.66 0.70 3.8 A 3.8 A R 1108 1583 0.13 0.70 1.9 A Intersection Delay = 8.0 (sec/veh) Intersection LOS = A Z7 HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Coll' Period: oon pm Year recent short long bkgrd total Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R 1 I I I I I No. Lanes 1 1 1 0 1 1 1 0 I 1 3 0 1 1 3 1 I LGConfig I L TR I L TR I L TR I L T R Volume 1210 20 65 150 20 10 170 1740 20 145 1795 90 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 I 0 1 0 I 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A I Thru P Right A I Right P Peds X 1 Peds X WB Left A 1 SB Left P Thru A 1 Thru P Right A 1 Right P Peds X 1 Peds X NB Right I EB Right SB Right 1 WB Right Green 29.0 88.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) V/c g/C Delay LOS Delay LOS Eastbound L 305 1321 0.81 0.23 62.3 E TR 368 1650 0.27 0.22 42.2 D 56.5 E Westbound L 288 1247 0.20 0.23 40.7 D TR 395 1770 0.09 0.22 40.1 D 40.5 D Northbound L 98 143 0.81 0.68 53.5 D TR 3437 5077 0.58 0.68 4.6 A 6.4 A Southbound L 116 169 0.46 0.68 15.4 B T 3442 5085 0.61 0.68 4.9 A 5.0 A R 1072 1583 0.10 0.68 2.7 A Intersection Delay = 10.1 (sec/veh) Intersection LOS = B ry APPENDIX E HCS2000: Signalized Intersections Release 4.1c Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon pm Year recent short oh kgrd otal Project ID: 4 E/W St: Spring Park/Johnson N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound 1 Northbound I Southbound I L T R I L T R I L T R I L T R 1 I I I I I No. Lanes I 0 1 0 1 1 1 0 1 1 3 0 I 1 3 0 LGConfig I LTR I L TR I L TR I L TR Volume 110 0 25 165 0 45 120 2220 20. 135 3135 10 1 Lane Width 1 12.0 112.0 12.0 112.0 12.0 112.0 12.0 RTOR Vol 1 0 1 0 I 0 I 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A 1 Thru P Right A I Right P Peds X 1 Peds X WB Left A I SB Left P Thru A I Thru P Right A I Right P Peds X I Peds X NB Right I EB Right SB Right 1 WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red 2.0 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound . LTR 159 1661 0.23 0.10 53.0 D 53.0 D Westbound L 227 1770 0.30 0.13 50.2 D TR 190 1583 0.25 0.12 50.6 D 50.3 D Northbound L 60 90 0.35 0.66 19.0 B TR 3332 5079 0.71 0.66 7.1 A 7.2 A Southbound L 64 97 0.58 0.66 37.4 D TR 3334 5083 0.99 0.66 22.9 c 23.1 c Intersection Delay = 17.4 (sec/veh) Intersection LOS = B 2e HCS2000: Signalized Intersections Release 4.1c Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 1 17/2003 Jurisd: Fort Collins Period: noo pm Year recent short on bkgr total Project 0364 E/W St: Spring Park/Johnson NIS St': College Avenue SIGNALIZED INTERSECTION SUMMARY 1` Eastbound I "Westbound 1' Northbound I Southbound I L T R I L T R 1 L T R 1 L T R 1 No. Lanes I` 0 1 0' ) 1 1' 0 1 1 3 0 1 1 3 0 I LGConfig I LTR I L TR 1 L TR F L TR I Volume 120"- 0 15 140 0 50` I25 1 2075-20 130 2520 15 Lane Width 1 12.0 112.0 12.0 112.0.12.0 112.0 12.0 RTOR Vol 1 0 I U I 0 I 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 "' 3 4 I 5 6 7 8 EB Left A I NB Left P Thru A I .. Thru P., Right A I Right P Peds 'g 1 Peds X. WB Left A I SB' Left P Thru" A I Thru P Right A ( Right P Peds X I Peds X NB Right 1 EB Right SB Right' i' WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red " 2.0 2.0 2.0 C cle Len th• 125 0 secs Y g Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach ' Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS ' Eastbound LTR 164 1706 0.23 0.10 52.9 D 52.9 D Westbound L 227 1770 0.19 0.13 49.1 D TR 190 1583 0.28 0.12 50.9 D 50.1 D Northbound L 60 90 0.43 0.66 25.1 C ' TR 3331 5078 0.66 0.66 6.5 A 6.7 A Southbound L 82 124 0.38 0.66 16.5 B ' TR 3333 5081 0.79 0.66 8.5 A 8.6 A Intersection Delay = 8.8 (sec/veh) Intersection LOS = A 23 HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon®m Year recent short on kgr total Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R 1 L T R 1 I I I I I No. Lanes 1 1 1 0 1 1 1 0 1 1 3 0 1 1 3 1 1 LGConfig I L TR i L TR I L TR I L T R Volume 1180 20 65 115 20 10 160 2380 15 135 2850 140 1 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 I RTOR Vol 1 0 1 0 1 0 1 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A 1 Thru P Right A I Right P Peds X 1 Peds X WB Left A 1 SB Left P Thru A 1 Thru P Right A I Right P Peds X 1 Peds X NB Right 1 EB Right SB Right I WB Right Green 26.0 91.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 'secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity. (s) v/c g/C Delay LOS Delay LOS Eastbound L 274 1321 0.69 0.21 54.8 D TR 330 1649 0.27 0.20 44.4 D 51.5 D Westbound L 260 1254 0.06 0.21 41.4 D TR 353 1767 0.09 0.20 42.5 D 42.1 D Northbound L 57 81 1.07 0.71 148.1 F TR 3557 5081 0.69 0.70 4.0 A 7.5 A Southbound L 70 99 0.51 0.71 26.4 C T 3559 5085 0.83 0.70 5.9 A 5.9 A R 1108 1583 0.13 0.70 1.9 A Intersection Delay = 9.0 (sec/veh) Intersection LOS = A Z2 HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: oo pm Year recent short on bkgr total Project 0364 E/W St: Rutgers/University Mall NIS St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 L T R I L T R I L T R I L T R 1 I I I I I No. Lanes 1 1 1 0 LGConfig 1 L TR Volume 1210 20 65 Lane Width 112.0 12.0 RTOR Vol 1 0 1 1 1 0 I L TR 120 20 10 112.0 12.0 1 0 1 1 3 0 I L TR 170 2130 20 112.0 12.0 1 0 I 1 3 1 I L T R 135 2245 90 112.0 12.0 12.0 1 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A I NB Left P Thru A I Thru P Right A I Right P Peds X I Peds X WB Left A I SB Left P Thru A I Thru P Right A I Right P Peds X I Peds X NB Right I EB Right SB Right I WB Right Green 29.0 88.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound. L 306 1326 0.72 0.23 54.3 D ' TR 368 1649 0.24 0.22 41.8 D 50.7 D Westbound L 291 1259 0.07 0.23 39.2 D TR 394 1767 0.08 0.22 40.0 D 39.7 D Northbound ' L 71 103 1.04 0.68 126.0 F TR 3437 5078 0.66 0.68 5.2 A 9.1 A Southbound L 80 117 0.46 0.68 21.0 C T 3442 5085 0.69 0.68 5.5 A 5.7 A R 1072 1583 0.09 0.68 2.7 A Intersection Delay = 10.2 (sec/veh) Intersection LOS = B ' zl APPENDIX D m . . HCS2000: Signalized Intersections Release 4.1c Analyst: Michael Agency: Matthew J. Delich, P.E. Date: 10/17/2003 Period: noo Project ID: 64 E/W St: Spring Park/Johnson Inter.: College/Spring Park/Johnson Area Type: All other areas Jurisd: Fort Collins Year recent shor lonqrbkgrSVtotal N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound I Northbound I Southbound L T R I L T R I L T R I L T R No. Lanes 1 0 1 0 I 1 1 0 I 1 3 0 1 1 3 0 1 LGConfig I LTR I L TR I L TR I L TR I Volume 110 0 25 165 0 45 120 1790 20 135 2530 10 1 Lane Width I 12.0 112.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol 1 0 I 0 1 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A I Thru P Right A I Right P Peds X 1 Peds X WB Left A 1 SB Left P Thru A I Thru P Right A 1 Right P Peds X I Peds X NB Right I EB Right SB Right 1 WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red 2.0 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 159 1661 0.26 0.10 53.2 D 53.2 D Westbound L 227 1770 0.33 0.13 50.5 D TR 190 1583 0.28 0.12 50.9 D 50.7 D Northbound L 60 90 0.37 0.66 20.1 C TR 3331 5077 0.59 0.66 5.8 A 6.0 A Southbound L 109 164 0.34 0.66 11.8 B TR 3334 5082 0.81 0.66 8.9 A 8.9 A Intersection Delay = 9.2 (sec/veh) Intersection LOS = A HCS2000: Signalized Intersections Release 4.1c Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type:; All other areas Date: 1017/2003 Period: noo pm Jurisd: Year Fort ColljnA recent shor long kgrd otal Project ,0364 E/W St: Spring Park/Johnson N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound 1 Westbound ( Northbound Southbound I. I L T R. i L T R I L T R ► L T R ► ► 1 I I. No. Lanes ► 0 1 0 1 1 1 0 1 1 3 0 ► 1 3 0 ► LGConfig 1 LTR ► L TR ► L TR. I L TR ► Volume 120 0 15 140. 0 50 125 1685 20 130 2040 15. ► Lane Width ► 12.0 112.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol ( 0 ► 0 1 0 .1 0 i Duration 0..25. Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A ► Thru P Right A I Right P Peds X I Peds X WB Left A I SB Left P. Thru A I Thru P. Right A 1 Right P Peds X ► Peds X NB Right I EB Right SB Right 1_WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red. 2.0 . 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/C g/C Delay LOS Delay LOS Eastbound., LTR 164 Westbound L 227 TR 190 Northbound L 87, TR 3330 1706 0.26 0.10 53.2 D 53.2 D 1770 0.20. 0.13 49.2 D 1583 0.30 0.12 51.1 D 50.3 D 131 6.30 0.66 12.0. B 5076 0.53 0.66 5.4 A 5.5 A Southbound L 139 209 -.0.22 0.66 6.9 TR 3332 5080 0.64 0.66 6.3 Intersection Delay = 7.5 (sec/veh) A A 6.3 A Intersection LOS = A IT HCS2000: Signalized'Intersections Release 4.1d ' Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon® Year recent short long kgrd total Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED.INTERSECTION SUMMARY I Eastbound i Westbound I Northbound I Southbound 1 ' I L T R I L T R I L T R I L T R I I I I I i No. Lanes 1 1 1 0 I 1 1 0 1 1 3 0 I 1 3 1 1 LGConfig I L TR I L TR I L TR I L T R I Volume I1$0. 20 65 115 20 10 160 1925 15 135 2290 140 1 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol I 0 I 0 I 0 I 0 I ' Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 ' EB Left A I NB Left, P Thru A 1 Thru P Right A I Right P. ' Peds X 1 Peds X. WB Left A 1 SB Left P Thru A I Thru P Right A I Right P Peds X 1 Peds X NB Right ( EB Right SB Right 1 WB Right ' Green 26.0 91.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs ' Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate ' Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 273 1316 0.78 0.21 61.8 E ' TR 330 1650 0.30 0.20 44.8 D 56.4 E Westbound 'L 258 1242 0.07 0.21 41.5 D TR 354 1770 0.10 0.20 42.6 D 42.2 D Northbound ' L 78 110 0.78 0.71 56.3 E TR 3556 5080 0.56 0.70 3.1 A 4.7 A Southbound L 125 176 0.29 0.71 7.3 A T 3559 5085 0.66 0.70 3.8 A 3.7 A ' R 1108 1583 0.13 0.70 1.9 A Intersection Delay = 7.9 (sec/veh) Intersection LOS = A HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: oo pm Year recent short lon kgrd total Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound 1 Northbound I Southbound 1 I L T R 1 L T` R I L T R I L T R 1 I I I I I No. Lanes 1 1 1 0 I 1 1 0 1 1 3 0 1 1 3 1 I LGConfig I L TR I L TR I L TR I L T R Volume 1210 20 65 120 20 10 170 1725 20 135 1805.90 1 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol ( 0 1 0 1 0 1 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8. EB Left A 1 NB Left P Thru A 1 Thru P Right A ( Right P Peds X I Peds X WB Left A 1 SB Left P Thru A 1 Thru P Right A 1 Right P Peds X 1 Peds X NB Right ( EB Right SB Right I WB Right Green 29.0 88.0, Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 305 1321 0.81 0.23 62.3 E TR 368 1650 0.27 0.22 42.2 D 56.5 E Westbound L 288 1247 0.08 0.23 39.3 D TR 395 1770 0.09 0.22 40.1 D 39.8 D Northbound L 96 140 0.82 TR 3437 5077 0.57 Southbound L 118 172 0.35 T 3442 5085 0.62 R 1072 1583 0.10 Intersection Delay = 9.9 0.68 57.2 E 0.68 4.5 A 6.6 A 0.68 10.6 B 0.68 4.9 A 4.9 A 0.68 2.7 A (sec/veh) Intersection LOS = A APPENDIX C Table 4-3 Fort Collins (City Limits) Motor Vehicle LOS Standards (Intersections) Land Use (from structure plan) Other corridors within: Intersection type Commercial Mixed use Low density mixed use All other corridors districts residential areas Signalized intersections (overall) D E* D D Any Leg E E D E Any Movement E E D E Stop sign control (arterial/collector or -local -- N/A P. F" E any approach le Stop sign control (col lector/local—any N/A C C C approach leg) ' mitigating measures required " considered normal in an urban environment ', 4- UNSIGNALIZED INTERSECTIONS Level -of -Service _ Average Total Delay sec/vch A _< 10 >10and<15 C 15 and < 25 --- D > 25 and <<35 — I- > 35 and _< 50 I > s0 SIGNALIZED INTERSECTIONS Lcvcl-of-service Average Total Delay sec/vch A _< 10 B > 10 and < 20 C > 20 and < 35 _ D _ > 35 and _< 55 _ E > 55 and _< 80 1 > 80 13 HCS2000: Signalized Intersections Release 4.1c Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: F Collins Period: noon Year : recent short long bkgrd total Project ID: 64 E/W St: Spring Park/Johnson N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 I L T R I L T R I L T R I L T R 1 I I I I No. Lanes 1 0 1 0 1 1 1 0 1 1 3 0 1 1 3 0. 1 LGConfig 1 LTR I L TR I L TR I L TR 1 Volume 19 0 23 161 0' 44 120 1754 19 132 2479 10 1 Lane Width 1 12.0 112.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 1. Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A 1 NB Left P Thru A 1 Thru P Right A 1 Right P Peds X 1 Peds X WB Left A 1 SB Left P Thru A 1 Thru P Right A 1 Right P Peds X ( Peds X NB Right 1 EB Right SB Right 1 WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red 2.0 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 159 1660 0.24 0.10 53.1 D 53.1 D Westbound L 227 1770 0.32 0.13 50.3 D TR 190 1583 0.27 0.12 50.8 D 50.5 D Northbound L 60 90 0.37 0.66 20.1 C TR 3331 5077 0.58 0.66 5.7 A 5.9 A Southbound L 115 173 0.30 0.66 9.9 A TR 3334 5082 0.79 0.66 8.5 A 8.5 A Intersection Delay = 6.9 (sec/veh) Intersection LOS = A 12, HCS2000: Signalized Intersections Release 4.1c Analyst: Michael Inter.: College/Spring Park/Johnson Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fort Collins Period: noon pm Year recen short long bkgrd total Project 0364 E/W St: Spring Park/Johnson N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes 1 0 1 0 I 1 1 0 I 1 3 0 1 1 3 0 I LGConfig I LTR I L TR I L TR I L TR I Volume 119 0 14 137 0 47 122 1648 19 130 1998 12 I Lane Width 1 12.0 112.0 12.0 112.0 12.0 112.0 12.0 I RTOR Vol 1 0 1 0 I 0 I 0 I Duration -0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A I NB Left P Thru A I Thru P Right A I Right P Peds X I Peds X WB Left A I SB Left P Thru A I Thru P Right A 1 Right P Peds X I Peds X NB Right I EB Right SB Right I WB Right Green 12.0 15.0 82.0 Yellow 3.0 3.0 4.0 All Red 2.0 2.0 2.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity -(s) v/c g/C Delay LOS Delay LOS Eastbound LTR.:', 164 1707 0.23 Westbound L 227 1770 0.19 TR 190 1583 0.28 Northbound L 92 139 0.25 TR 3331 5077 0.52 Southbound L 145 219 0.21 TR 3333 5081 0.63 Intersection Delay = 7.3 0.10 53.0 D 0.13 49.1 D 0.12 50.9 D 53.0 D 50.1 D 0.66 9.7 A 0.66 5.3 A 5.4 A 0.66 6.6 A 0.66 6.2 A 6.2 A (sec/veh) Intersection LOS = A HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 10/17/2003 Jurisd: Fo Collins Period: noon (0) Year ecen short long bkgrd total Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 I L T R I L T R I L T R I L T R I I I I I I No. Lanes I 1 1 1 1 0 1 1 I 1 3 0 I 1 3 1 I LGConfig I L LT R I LT R I L TR I L T R I Volume 150 2 20 113 3 7 16 1884 10 131 2241 90 I Lane Width 112.0 12.0 12.0 ( 12.0 12.0 112.0 12.0 112.0 12.0 12.0 I RTOR Vol i 0 1 0 I 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A I NB Left P Thru A I Thru P Right A 1 Right P Peds X I Peds X WB Left A I SB Left P Thru A 1 Thru P Right A 1 Right P Peds X I Peds X NB Right I EB Right SB Right I WB Right Green 15.0 102.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 160 1301 0.37 0.12 53.8 D LT 215 1863 0.61 0.12 50.9 D 53.2 D R 183 1583 0.13 0.12 52.0 D Westbound LT 170 1477 0.11 0.12 51.8 D 51.6 D R 183 1583 0.04 0.12 51.2 D Northbound L 99 125 0.06 6.79 2.0 A TR 3987 5081 0.48 0.78 1.7 A 1.7 A Southbound L 149 188 0.21 0.79 4.2 A T 3990 5085 0.58 0.78 2.1 A 2.1 A R 1242 1583 0.07 0.78 1.0 A Intersection Delay = 3.2 (sec/veh) Intersection LOS = A �O HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: College/Rutgers/University Mal Agency: Matthew J. Delich, P.E. Area Type: All other areas ' Date: 10/17/2003 Jurisd: F C llins on Period: nopm Year recen short long bkgrd total Project ID: 0364 E/W St: Rutgers/University Mall N/S St: College Avenue ' SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I ' 1 L T R I L T R i L T R I L T R I I I I I I No. Lanes I 1 1 1 1 0 1 1 1 1 3 0 1 1 3 1 1 LGConfig I L LT R 1 LT R I L TR I L T R I Volume 182 4 19 117 3 7 116 1691 14 131 1766 39 1 Lane Width 112.0 12.0 12.0 1 12.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 I 0 I 0 I 0 i ' Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 ' EB Left A I NB Left P Thru A I Thru P Right A I Right P Peds X I Peds X WB Left A 1 SB Left P Thru A 1 Thru P Right A 1 Right P ' Peds X 1 Peds X NB Right I EB Right SB Right I WB Right ' Green 17.0 100.0 Yellow 5.0 4.0 All Red 2.0 2.0 Cycle Length: 130.0 secs ' Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS ,.. Eastbound L 181 1305 0.53 0.14 55.0+ E LT 244 1863 0.02 0.13 49.3 D 53.9 D R 207 1583 0.11 0.13 50.0 D Westbound LT 190 1451 0.13 0.13 50.2 D 50.0 D R 207 1583 0.04 0.13 49.4 D Northbound L 125 161 0.14 0.78 3.3 A TR 3907 5079 0.49 0.77 1.8 A 1.8 A ' Southbound L 148 191 0.24 T 3912 5085 0.53 ' R 1218 1583 0.04 Intersection Delay = 3.8 0.78 4.9 A 0.77 2.0 A 2.0 A 0.77 0.9 A (sec/veh) Intersection LOS = A u APPENDIX B on N Z N N Z tj LV c d J LL m a > Z CCL =�N � co W > w a WU Z UA I.L. O C Gi > 0 3 Z W Z � _ LU > Q N O � d � q� Wa J _ r a 1 5 a ,>e G CO N ` h, wrz o urn O: W N � V C 7 y o 0 0 0 O 1 U') M N p c 0 o o O (D ccN W -j' N M M 7 O O c a_< W, O F-.Nit <0i W m LO N .D C 0 of a .0 To" rl 0` tt ro +t,4 M GO C 7 O f0 t0 CNOZ Fj to M M E 9 4 o w � ti 6d od H m M M M o M N 0 0 0 0 iTy iw� 'h gs5esy: �•St� �3'T �Ni r„� �Pi'{• a0r tOr t0--. 00 co L O O O O V N N in h m x' k .ifav b a� is CO N CCD to coo <o In N � CO CO V M -qr N N n fN7 U') tO co R v v ui iii rA Z M 1✓ O V o U J cc g �i m W a W ? 00 = L: Z _ o c a S- U ix G R N W > Z to LL O C Im LLI C Q = V z O C U LU > r r N N O = J d CC� G 0 eV = 4D T CM W M L c ^J is r is 0 R N M N r M co O. N R O C 7 O 3 J N T O 1,- � C � ¢ � 'A Y� ge NO •: vl i R L � .r t N U) -t v) C O O O oW O F-j O f7 CD Sp0 45 � ) P. N F w m Q> O) 0 C Y 3r - [ u"NN� k�-.•tee �' 0 .�� C 7 N T cocD pp a l.7 V In IA R 0 O N J CO CD 1� ,y sK r r 1 ia,, CO Ch In LO 9 C H co M o r� a f 0 Z J c0 O t0 E e o O l0 0 n F N N N am c 0 0 U- 0 ou 0 U- L4 LU u xoN Lu z 0:8 I. -0 Lu > 0 - 0 0 LU a T ce E 17 do co SO 0 C> m N C> O to O 0 4m cn, -j c) N cn is am"6. co in "ZZ a m cn cc Go cm cn cn cc T cn 4mto cc to 0 r. O x U cn cn, U.) 3 M , CD 0 --zr mr C:) 0 J2 tnmmM O C*oPt r� in cr C4 C4 C4 C4 C4 C4 1 wr Oil I cn W M 1.4, M N m xi 0 I C) C> 'i III Lo C) m (D fl- CD co v is OD ("ll, —I(nlMlCn to I-T C�.j ..r CD Lo co I "t co U') U3 LD U.) "C"o to cn M 40 V* C> 1"I cql R0-T-T I Cn i C% IV N O —1 cn C> I cn lh c S%rCF---V Attachment "B" Transportation impact Study Pedestrian Analysis Worksheet Origin IW. (Project Site) Z (4 OtTiep List the pedestrian destinations wiuun 1.5Lu- (i.D mucs jul Nuliuulb) vi we Fxui— boundary in the spaces above. The pedestrian Level of Service for the facility/corridor linking these destinations to the project site will be based on the directness, continuity, M, types of street crossings, walkway surface condition, visual interest/amenity, and security of the selected route(s). 03 (SPOIA)Q FLA..' k0/z-r4&A(G -( Larimer County Urban Area Street Standards January 2,2001 r gAtsi,ua CA, Jg15 C6ceKorsi Fticg �2tP (GAue!?AToAJ 35zr0 L 173Co , ociT Z4. ¢ 3 �sCo q2 PM 1� 1'1. 4-I ou-r 07 MxY,3c Mor oT>F�u /AI AM PEAK 50� 5 Chapter - Attachments Attachment A Transportation Impact Study Base Assumptions Project Information Project Name 5 tN (' C E is C H (CK 6�U Project Location CASg,be op eOl.Gcr� A% 2T or-PUr (rCi S TIS Assumptions Type of Study Full: E S Intermediate: ,V e Study Area Boundaries North: South: East: West: Study Years Short Range: 2 p p S Long Range: 2025 ' Future Traffic Growth Rate P&-je /,) F F r P Study Intersections 1. All access drives 5. 2. w� C ZP 6. 3. 7. 4. 8. Time Period for Study AM: 7:00-9:00 1 PM :00-6:00 Noon: Trip Generation Rates Reg?L A -,r-r e co Trip Adjustment Factors Passby: -r C. Pn da�ov'4 Captive N/ Market: !11 Overall Trip Distribution TTACHED Mode Split Assumptions MIA Committed Roadway Improvements Other Traffic Studies Areas Requiring Special Study Date: OCTc a c- p- Traffic Engineer. Local Entity Engineer. ►`der twiv-- OR4e 8RA�1=e� ou �a/8�o3 �o t`�sevss Larimer County Urban Area Street Staoaaraa- Repealed and Reenacted October t. M02 Page 44M Adopbd by Larimer County. City of Loveland. Cdy of Fat Coffins I/l APPENDIX A. 1 1 1 1 IV. CONCLUSIONS This study assessed the impacts of the Raising Cane's Restaurant development, located along College Avenue just north of Rutgers Avenue, on the short range (2005) and long range (2025) street system in the ' vicinity of the proposed development. As a result'of this analysis, the following is concluded: The development of the Raising Cane's Restaurant is feasible from ' a traffic engineering standpoint. The Raising Cane's Restaurant will generate approximately 1190 daily trip ends, 154 noon peak hour trip ends, and 106 afternoon peak hour trip ends. ' - Current operation at the key intersections is acceptable. ' - In the short range (2005) future, given development of the Raising Cane's Restaurant and an increase in background traffic, the key intersections will operate acceptably. ' - In the long range (2025) future, given development of the Raising Cane's Restaurant, the key intersections will operate acceptably during the noon and afternoon peak hours. - No geometric improvements are necessary at the key intersections. ' - The first parking stall should be 75 feet from the flowline of College Avenue. ' - Acceptable level of service is achieved for the transit mode based upon the measures in the multi -modal transportation guidelines. Due to physical circumstances beyond the control of this developer, acceptable pedestrian and bicycle level of service cannot be achieved. 21 ' The minimum level of service for "activity corridor" is B for all categories. There are sidewalks along most the streets in this area ' of Fort Collins. The pedestrian level of service is acceptable for all factors, except for street crossings and continuity for the commercial areas west of College Avenue. It is not possible to ' achieve level of service B for the street crossing factor, since College Avenue is already six lanes wide and, as such, the maximum level of service for this factor is C. As mentioned earlier, there are no sidewalks adjacent to a number of properties along College ' Avenue. Also, some of the existing sidewalks were built under previous City standards and, as such, do not meet the current standard, which requires a landscaped parkway to achieve the level of ' service B for this factor. It is not reasonable for any new development to "fix" the existing sidewalk situation along College Avenue and other streets, especially since the City has generally ' accepted this for some period of time. Access to Creek Side Park can be obtained from the Spring Creek Trail which has a tunnel under College Avenue. The site plan for the Raising Cane's Restaurant shows ' a sidewalk along College Avenue and a sidewalk connection to Remington Street and Dartmouth Trail. Bicycle Level of Service Appendix G contains a map of the area that is within 1320 feet of ' the Raising Cane's Restaurant. Based upon Fort Collins bicycle LOS criteria, there are three destination areas within 1320 feet of the Raising Cane's Restaurant. These are: 1) the commercial corridor along ' College Avenue including the University Mall, 2) Spring Park including the Spring Creek Trail, and 3) Creek Side Park including the Spring Creek Trail. A bicycle LOS worksheet is provided in Appendix G. This site does not directly connect to any streets with bike lanes. It ' indirectly connects to Remington Street and the Spring Creek Trail via the local streets at the rear of the site. As such, the bicycle level of service is, by definition, LOS E. Transit Level of Service tCurrently, this area is served by Routes 1 and 63. The Fort Collins Transit System Map shows that College Avenue, will have high ' frequency (20 minute) transit service in the future. A future transit level of service worksheet is provided in Appendix G. Transit level of service will be acceptable at level of service B. 20 0 U Johnson Spring Park f4 Exit Only II� -� - Denotes Lane 4 4 Enter Only I I s 4 Rutgers I SHORT RANGE (2005) AND LONG RANGE (2025) GEOMETRY 19 A& N Figure 10 TABLE 5 Short Range (2005) Total Peak Hour Operation EB E E WB D D College/Rutgers (signal) NB A A SB A A OVERALL B A EB D D College/Spring Park/Johnson (signal) WB D D NB K A SB A A OVERALL A A College/Exit Only Access (RT-out) WB RT B B TABLE Long Range (2025) Total Peak Hour Operation Um College/Rutgers (signal) EB D D WB -- D D NB -A A SB A A OVERALL B A College/Spring Park/Johnson (signal) EB D D wd- D D NB A A SB A B OVERALL A College/Exit Only Access (RT-out) I VM RT c 18 provided in Appendix D. The key intersections will operate acceptably during the noon and afternoon peak hours. In the long range analysis, the higher peak hour factor caused the operation of the eastbound legs to improve. Using the traffic volumes shown in Figure 8, the key intersections operate in the short range (2005) total condition as indicated in Table 5. Calculation forms for these analyses are provided in Appendix E. The key intersections will operate acceptably. Using the traffic volumes shown in Figure 9, the key intersections operate in the long range (2025) total condition as indicated in Table 6. Calculation forms for these analyses are provided in Appendix F. The key intersections will operate acceptably during the noon and afternoon peak hours. Geometry The short range (2005) and long range (2025) geometry is shown in Figure 10. This is the same street geometry that exists today. In the neighborhood meeting, a participant indicated that southbound to eastbound vehicles negotiating the Dartmouth/Remington intersection often "short cut" by crossing into the opposing travel lane. Southbound vehicles are climbing a grade and visibility is limited. A center stripe through this area and a "KEEP RIGHT" sign may correct this practice. Concern was expressed with regard to the location of the first parking stall at the ingress access from College Avenue. Figure 19-6 in LCUASS shows the minimum off-street parking setback distances for various streets. Key to the determination is the daily volume of the parking lot. The subject access is ingress only. The average weekday traffic at this access will be 500 vehicles. Using Figure 19-6 in LCUASS, the setback from the flowline of College Avenue to the first parking space should be 75 feet. This will provide storage for, at least, two' entering vehicles in the event that an "unparking" maneuver is underway at the first parking space. Pedestrian Level of Service Appendix G contains a map of the area that is within 1320 feet of the Raising Cane's Restaurant site. There will be/are five pedestrian destinations within 1320 feet of the Raising Cane's Restaurant. These are: 1) the commercial corridor along College Avenue including the University Mall, 2) the residential area south and east of the site, 3) Spring Park, 4) the residential area northeast of the site, and 5) Creek Side Park. This site is in an area type termed "activity corridor." The Pedestrian LOS Worksheet is provided in Appendix G. 17 TABLE 3 Short Range (2005) Background Peak Hour Operation College/Rutgers (signal) EB E E WB D D NB A A SB A A OVERALL A A College/Spring Park/Johnson (signal) EB D D WB D D NB A A SB A A OVERALL A A TABLE 4 Long Range (2025) Background Peak Hour Operation 'ILI .11-1f,4ervrce_11 EB D D WB D D College/Rutgers (signal) NB A A SB A A OVERALL B A EB D D College/Spring Park/John son (signal) WB D D NB A A SB A C OVERALL A B 16 m C CD 0 D U') N 1 ch O O LO to r' N � 50/45 �— NOM y � 50/75 Johnson NOM _ ` � Spring Park NOM 11 15/25 N m N to N O N I N O Q� O N 35/25 4 Exit Only LD u') LO N O CO r4 N f r Enter Only LO LO Ln N In L j N (h O O M 0 N co 10/10 O N LQ rn N v e— 20/20 i I ,— 5 0/3 50 210/180 ---14( ) t r Rutgers 20/20 O O to 65/65 o 0 O f` , CV v N LONG RANGE (2025) TOTAL PEAK HOUR TRAFFIC f 45/30 45/30 — D a�mo11th --dw- NOON/PM Rounded to Nearest 5 Vehicles N Figure 9 15 a> 0) a) 0 J 0 LO N OLO Lo LoN `� 50/45 NOM 50/75 Johnson 20/10 Spring Park NOM —� 15/25 N o N Lo co o C7 I N C> O n T 35/25 Exit Only C) 0 T N N m T Enter Only o u' O_ N_ N Lo C'7 LO N O m W T N T LO Lo o0)o �10/10 °' TI v e 20/20 + � 50/35 210/180 ) f r Rutgers 20/20 — O LO Lo 65/65 o o t` o N v T 44 --w— 45/30 45/30 i DamoUth SHORT RANGE (2005) TOTAL NOON AND AFTERNOON PEAK HOUR TRAFFIC 14 -�— NOON/PM Rounded to Nearest 5 Vehicles A& N Figure 8 m SITE GENERATED NOON AND AFTERNOON PEAK HOUR TRAFFIC ' 13 Figure 7 RV L0 ch cY) 0 LO N M `— 50/45 e NOM ,— 40/65 Johnson Spring Park 20/103CLON ,/ NOMI( 15/25N N N N U.) O N N LO O N O N OItt � 22 ` `-10/10 CDN U) m NI r) �— 20/20 20/15 University Mall 210/180 t r Rutgers 20/20 o Co Ln 65/65 o Cl) o t'— O N M T N --.— NOON/PM Rounded to Nearest 5 Vehicles LONG RANGE (2025) BACKGROUND NOON Figure 6 AND AFTERNOON PEAK HOUR TRAFFIC 12 Johnson University Mail m m 0 0 m LO N OLO LON Mo 50/45 �- NOM 40/65 20110 � � Spring Park t r — NOM, � 15/25 N rn N Lo O N N LO co O O O N 7 Lo L oco� �10/10 °' " 20/20 f 1 20/15 2101180 t 20/20 —n-- o LO Lo 65/65 o rn o f` N LO N r` ---w— NOON/PM Rounded to Nearest 5 Vehicles Kutgers Rk SHORT RANGE (2005) BACKGROUND NOON Figure 5 AND AFTERNOON PEAK HOUR TRAFFIC Background Traffic Projections Figures 5 and 6 show the respective short range (2005) and long range (2025) background traffic projections. Background traffic projections for the short range and long range future horizons were obtained by reviewing the "North Front Range Regional Transportation Plan" and reviewing other traffic studies for developments in this area of Fort Collins. Traffic on College Avenue and Drake Road is expected to increase at 1.0 percent per year. Rutgers Avenue, west of College Avenue, is being redeveloped for Whole Foods Market. Traffic on the east leg of Rutgers Avenue, Spring Park Drive, and Johnson Drive is not expected to change significantly, since this area of Fort Collins is fully developed. Traffic will only change as properties are redeveloped. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Figure 7 shows the site generated noon and afternoon peak hour traffic assignment. Negative values reflect the passby traffic that is expected to patronize this site. Figure 8 shows the total (site plus background) short range (2005) noon and afternoon peak hour traffic at the key intersections. Figure 9 shows the total long range (2025) noon and afternoon peak hour traffic at the key intersections. Signal Warrants No additional traffic signals are likely to be warranted at any of the intersections in the vicinity of the Raising Cane's Restaurant site. Operation Analysis Capacity analyses were performed at the key intersections. The ' operations analyses were conducted for the short range analysis, reflecting a year 2005 condition. The long range analysis reflects a year 2025 condition. Using the traffic volumes shown in Figure 5, the key intersections operate in the short range (2005) background condition as indicated in Table 3. Calculation forms for these analyses are provided in Appendix C. The key intersections will operate acceptably during the noon and afternoon peak hours. Using the traffic volumes shown in Figure 6, the key intersections operate in the long range (2025) background condition as indicated in Table 4. Calculation forms for these analyses are 10 CD rn Jot ark 20% —s c 0 rn c m w �a\ TRIP DISTRIBUTION Figure 4 9 4 Schematic Site Plan Scale: 1'=50' SITE PLAN Figure 3 III. PROPOSED DEVELOPMENT The Raising Cane's Restaurant is a commercial development located along College Avenue, just north of Rutgers Avenue, in Fort Collins. Figure 3 shows a site plan of the Raising Cane's Restaurant. The Raising Cane's Restaurant will consist of 3,533 square feet with a drive through window. The short range analysis (Year 2005) includes development of the Raising Cane's Restaurant and an appropriate increase in background traffic, due to normal growth. The long range analysis year is considered to be 2025. The site plan shows three primary accesses to the Raising Cane's Restaurant site. One of the accesses to College Avenue is an enter only access and the other is an exit only access. The access to Remington Street/Dartmouth Trail is a full movement access. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. Trip generation information contained in Trip Generation, 7th Edition, ITE is customarily used to estimate trips that would be generated by the proposed/expected uses at this site. However, trip generation from a Raising Cane's Restaurant in Louisiana was provided by the owner. The trip generation rates were calculated based upon this information. Table 2 shows the expected trip generation on a daily and peak hour basis. Passby traffic rates were applied using techniques in The Trip Generation Handbook, ITE. TABLE 2 Trip Generation u=��' '1sy n AYfiDIE v _1�10011 PeeiC tIOUF P'IIh,P8$k IitlUi } M �� rta rta�e j r ��. �_ bra. ,_m�� beak Rafe �►� _ Mate ti.; Raising Can's Restaurant 3.533 KSF 336.82 1190 21.79 77 21.79 77 15.00 53 15.00 53 Trip Distribution Directional distribution of the generated trips was determined for the Raising Cane's Restaurant site using the existing traffic counts, knowledge of the existing and planned street system, development trends, and engineering judgment. Figure 4 shows the trip distribution used in the short range (2005) and long range (2025) futures. 7 Transit Facilities ' Transfort currently serves this area of Fort Collins with Routes 1 and 63. The nearest stops for these routes are just north of the College/Spring Park/Johnson intersection and just south of the College/Rutgers intersection. Route 1 provides 20 minute service on College Avenue. Route 63 provides evening service. TABLE 1 Current Peak Hour Operation 111Eer52C17OT1Z s R r.��3 { �4" I Lµi q9=t: •�--f''�'31-IY �ii.;t Y cif-. {% tS1 �T ('1 zh 'Mf'sL'fi ulw� y :'�Y . R� )i tF+'\a1h fr'm ..hd at'uF•� �M.N.:C` S.x+A P' `,�,t'3Levg'Q ... d'n`"�Y� College/Rutgers (signal) EB D D WB D D NB A A SB A A OVERALL A A College/Spring Park/Johnson (signal) EB D D WB D D NB A A SB A A OVERALL A A 6 Johnson University Mall m m 0 0) rl- NT N c M ` `— 47/44 J 0/0 f 37/61 10/0 Spring Park 14/23 ---4 N 'LTD °' N 6) N 00 V CO N N O c r co r 7/7 "I a' 3/3 17/13 82/50 t 4/2 m a o 19/20 co rn cD -aNOON/PM Rutgers N RECENT NOON AND AFTERNOON Figure 2 PEAK HOUR TRAFFIC 5 ' Both Dartmouth Trail and Remington Street are to the east of the Raising Cane's Restaurant site. Both are designated as local streets. tA rear access to the site will connect to these two streets. Existing Traffic Recent noon and afternoon peak hour traffic counts at the key intersections are shown in Figure 2. Raw traffic data is provided in ' Appendix A. The traffic data for the College/Spring Park/Johnson intersection was collected in October 2003. The traffic data for the College/Rutgers intersection was collected by the City of Fort Collins ' in January 2002. New counts could not be obtained for the College/Rutgers intersection due to construction. Existing Operation ' The key intersections were evaluated using techniques provided in the 2000 Highway Capacity Manual. Using the noon and afternoon peak hour traffic shown in Figure 2, the noon and afternoon peak hour operation is shown in Table 1. Calculation forms are provided in ' Appendix B. A description of level of service for signalized and unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards ' (Intersections) are also provided in Appendix B. The key intersections operate acceptably during both the noon and afternoon peak hours. Acceptable operation at signalized intersections during the peak hours ' is defined as level of service D or better, overall. In a commercial corridor, acceptable operation is considered to be level of service E on any leg or any movement at a signalized intersection. At ' unsignalized intersections, acceptable operation is not applicable for any approach leg for an arterial/collector or arterial/local intersection. ' Pedestrian Facilities ' Sidewalks exist adjacent to most streets in this area of Fort Collins. Along College Avenue, a number of properties do not provide defined sidewalks. Pedestrians generally walk through parking lots. This will likely remain this way until these properties redevelop or the City institutes a sidewalk program. Sidewalks will be incorporated within this development. Bicycle Facilities ' Bicycles are not allowed on College Avenue. The Spring Creek Trail exists adjacent to Spring Park Drive and Johnson Drive. 4 Pros ect Johnson Raising Canes I m CD 0 U Drake Stuart Spring park C _O C E 12 Dart rrbuth Rut ers SCALE: 1 =1000' ' SITE LOCATION Figure 1 3 III. EXISTING CONDITIONS ' The location of the Raising Cane's Restaurant is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use ' Land uses in the area are primarily either residential or commercial. The site is occupied by the shell of a building that was damaged by the Spring 2003 snow storm. This building will be razed. ' The site is located on a segment of College Avenue that increases in grade from north to south. Within the study area, key streets have less than a 2% grade. The site is the approximate centroid of the Fort ' Collins population. This area is considered to be a Commercial Corridor. Roads The primary streets near the Raising Cane's Restaurant site are ' College Avenue (US287), Rutgers Avenue, Spring Park Drive, Dartmouth Trail, and Remington Street. College Avenue is adjacent to the west side of the Raising Cane's Restaurant site. It is classified as a six - lane arterial on the Fort Collins Master Street Plan and an NRA highway by CDOT. Currently, College Avenue has a six -lane cross section near the Raising Cane's Restaurant site. At Rutgers Avenue, College Avenue ' has three travel lanes in each direction, northbound and southbound left -turn lanes, and a southbound right -turn lane. The College/Rutgers intersection has signal control. At Spring Park Drive/Johnson Drive, ' College Avenue has three travel lanes in each direction, and northbound and southbound left -turn lanes. The College/Spring Park/Johnson intersection has signal control. The existing speed limit in this area is 40 mph. Rutgers Avenue is south of the Raising Cane's Restaurant site. It is an east -west street designated as a local street on the Fort Collins Master Street Plan. Rutgers Avenue has a two-lane cross east of College Avenue. West of College Avenue, Rutgers Avenue provides access to the University Mall. At College Avenue, Rutgers Avenue has an eastbound left -turn lane, a eastbound and westbound combined left-turn/through lanes, and eastbound and westbound right -turn lanes. Spring Park Drive, east of College Avenue, is an east -west street designated as a collector street on the Fort Collins Master Street Plan. Johnson Drive, west of College Avenue, is offset with Spring Park Drive at College Avenue. Therefore, signal at this intersection has separate phases for Spring Park Drive and Johnson Drive. At College Avenue, Spring Park Drive has a westbound left -turn lane and a combined through/right-turn lanes. Johnson Drive has all movements combined in a single lane. 2 I. INTRODUCTION This transportation impact study addresses the capacity, geometric, and control requirements at and near the proposed development of the Raising Cane's Restaurant. The proposed Raising Cane's Restaurant site is located along College Avenue, just north of Rutgers Avenue, in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project planning consultant (VF Ripley), the owner/developer (Brad Sanders, Raising Cane's), the project engineering consultant (Northern Engineering Services, Inc.), and the Fort Collins Traffic Engineering staff. This study generally conforms to the format set forth in the Fort Collins transportation impact study guidelines contained in the "Larimer County Urban Area Street Standards (LCUASS)." A Base Assumptions Form and related information are provided in Appendix A. The study involved the following steps: - Collect physical, traffic, and development data; - Perform trip generation, trip distribution, and trip assignment; - Determine peak hour traffic volumes; - Conduct capacity and operational level of service analyses on key intersections; - Analyze signal warrants; - Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation. 1 G LIST OF FIGURES Figure Page 1. Site Location ........................................ 3 2. Recent Noon and Afternoon Peak Hour Traffic .......... 5 3. Site Plan ............................................ 8 4. Trip Distribution .................................... 9 5. Short Range (2005) Background Noon and Afternoon Peak Hour Traffic .......................... 11 6. Long Range (2025) Background Noon and Afternoon Peak Hour Traffic .......................... 12 7. Site Generated Noon and Afternoon Peak Hour Traffic .. 13 8. Short Range (2005) Total Noon and Afternoon Peak Hour Traffic .......................... 14 9. Long Range (2025) Total Noon and Afternoon Peak Hour Traffic .......................... 15 10. Short Range (2005) and Long Range (2025) Geometry .... 19 APPENDIX ' A Base Assumptions Form/Traffic Counts B Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS Standard C Short Range Background Traffic Operation D Long Range Background Traffic Operation E Short Range Total Traffic Operation ' F Long Range Total Traffic Operation G Pedestrian/Bicycle/Transit Level of Service Worksheets TABLE OF CONTENTS Page I. Introduction .......................................... 1 II. Existing Conditions .................................. 2 LandUse ............................................. 2 Roads................................................ 2 Existing Traffic ..................................... 4 Existing Operation ................................... 4 Pedestrian Facilities ................................ 4 Bicycle Facilities .................................... 4 Transit Facilities ................................... 6 III. Proposed Development ................................. 7 Trip Generation ...................................... 7 Trip Distribution .................................... 7 Background Traffic Projections ....................... 10 Trip Assignment ...................................... 10 Signal Warrants ...................................... 10 Operation Analysis ................................... 10 Geometry............................................. 17 Pedestrian Level of Service .......................... 17 Bicycle Level of Service ............................. 20 Transit Level of Service .............................20 IV. Conclusions .......................................... 21 LIST OF TABLES Table Page ' 1. Current Noon and Afternoon Peak Hour Operation ....... 6 2. Trip Generation ...................................... 7 ' 3. Short Range (2005) Background Noon and Afternoon Peak Hour Operation ........................ 16 ' 4. Long Range (2025) Background Noon and Afternoon Peak Hour Operation ........................ 16 ' S. Short Range (2005) Total Noon and Afternoon Peak Hour Operation 18 ' 6. Long Range (2025) Total Noon and Afternoon Peak Hour Operation ........................18 1 RAISING CANE'S CHICKEN FINGERS RESTAURANT TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2004 Prepared for: Raising Cane's Chicken Fingers 1212 South Acadian Thruway Baton Rouge, LA 70806 Prepared by: MATTHEW J. DELICH, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 a" 15M ': i