HomeMy WebLinkAboutEVERGREEN PARK, BLOCK 4, LOT 13 - PDP - 9-04 - CORRESPONDENCE - REVISIONSThis completes staff (and outside reviewing agencies) review and comments at this
time. Additional comments and red -lined plans may be forthcoming. Another round of
staff review is determined to be necessary. This proposal is subject to the 90-day
revision re -submittal requirement (from the date of this comment letter, being
March 22, 2004) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure
and return all of your red -lined plans when you re -submit. The number of copies of
each document to re -submit is shown on the attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt
City Planner
cc: Marc Virata
Mark Langel & Mike Sutton
Page 9
to public hearing.
S&A Response: The owner is working on a letter.
2. A letter of intent from WAPA, because of its easement on this property, is
needed before this item can go to public hearing.
S&A Response: Okay.
3. Too much storm water flows are being proposed to go over the drive.
S&A Response: Revised
4. The wrong kind of stormwater discharge pipe is being used.
S&A Response: Not in right-of-way. Okay.
5. Legal descriptions are needed.
S&A Response: Acknowledged
Water/Wastewater:
1. The utility plans must show where the gas main is.
S&A Response: Done
2. The standard notes are needed on the utility plans.
S&A Response: Done.
Stormwater:
1. The lower 1/3 of the detention pond does not drain.
S&A Response: Revised
2. The proposed grading plan puts this site back into the floodplain.
S&A Response: Part of the site was always in the flood plain.
3. The whole site needs to be raised to get it out of the floodplain.
S&A Response: This was discussed with Marsha and the building is out and the rest of the site can
be in the floodplain. Also, the whole site was never totally out of the flood plain.
Transportation Planning:
1. There are no connecting walkways to Blue Spruce Drive. Now is this facility to be
used? Why are no pedestrian connections being provided?
S&A Response: Added walkway.
Page 8
Number: 18 Created: 3/16/2004
[3/16/04] Include all standard general notes on the utility plans (i.e. depth or bury,
polywrapping, backf low, etc.).
S&A Response: Added
Number: 19 Created: 3/16/2004
[3/16/04] Show and label the location of the proposed curb stop and meter pit.
See site, landscape and utility plans for other comments.
S&A Response: Added to notes.
Department: Zoning
Topic: ZOAIIA16
Number: 1
[3/1/04] Site plan is incomplete
S&A Response: Revised
Number: 2
Issue Contact: Jenny Nuckols
Created: 3/1/2004
Created: 3/1/2004
[3/1/04] Need to see bike rack location. Suggest on the end of the building near the
landscaped area
S&A Response: Added at end of building per your suggestion.
Number: 3 Created: 3/1/2004
[3/1/04] There needs to be at least one handicap space and that needs to be van
accessible - 16' total width.
S&A Response: Revised to 1-16 foot -wide HC.
Number: 4 Created: 3/1/2004
[3/1/04] Are the building envelope and footprint the same - please note on the site
plan
S&A Response: Yes.
Number: 5 Created: 3/1/2004
[3/1/04] What is the proposed use of the building. Please clarify
S&A Response: Light IndustriatlCommercial/Storage
The following comments / concerns were expressed at staff review on March 17, 2004:
Engineering:
1. A letter of intent from the Food Bank, to the north, is needed before this item
Page 7
S&A Response: Raised to 69.9 per our meeting.
2. Please include a note on the plans and in the drainage report that no hazardous,
explosive, flammable, toxic, or water reactive materials shall be stored in the
outside storage area that is within the floodplain.
S&A Response: Added note to Sheet No. 4.
3. A floodplain use permit is required for the site work and outdoor storage.
S&A Response: Acknowledged
4. The fencing does not need to be above the floodplain elevation as stated in the
drainage report.
S&A Response: Removed from Drainage Report.
Department: Transfort
Topic: General
Number: 6
[3/2/04] No comments
S&A Response: Acknowledged
Department: Transportation Planning
Issue Contact: Garold Smith
Created: 3/2/2004
Issue Contact: David Averill
Topic: General
Number: 20 Created: 3/16/2004
[3/16/04] Does this building have a common "main" entrance through which tenants
access their work bays/units? Or does each unit have its own private entrance? In any
case, there is no discernable connecting walkway or defined pedestrian access from the
proposed sidewalk to the building. Please address the requirements of section
3.2.2(c.5.a) on future plan sets.
S&A Response: We have added sidewalks now. However, each unit has their own entrance
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 16 Created: 3/16/2004
(3/16/04] Is the electric overhead or underground? Show and label the location of
the gas main.
S&A Response: The electric is underground The gas main is now shown as per Excel responses
for location of their line.
Number: 17 Created: 3/16/2004
[3/16/04] Maintain a 4 feet minimum separation between the curb stop/meter pit and
the electric, gas, and any permanent structures.
S&A Response: Added meter/curb stop to drawings
Page 6
measured by an approved route around the exterior of the building or facility it shall
be fire sprinklered.
S&A Response: Acknowledged
Department: Police
Topic: General
Number: 8
[3/11/04] Need Lighting Plan.
S&A Response: The owner is working on one
Department. Stormwater Utility
Topic: Drainage
Issue Contact: Joseph Gerdom
Created: 3/11/2004
Issue Contact: Wes Lamarque
Number: 27 Created: 3/16/2004
The outlet pipe does not drain the bottom .6 feet of the pond due to the outlet pipe
invert set at 66.1. The entire depth of the pond needs to have a positive outfall.
Please revise.
S&A Response: Revised, however, with extended retention I thought that it would not matter.
Topic: Erosion/Sediment Control
Number: 26 Created: 3/16/2004
1. Please place the latest version of the City erosion control plan standard. notes
ON THE SEDIMENT/EROSION CONTROL PLAN SHEET. Delete the old City
notes on the cover sheet.
S&A Response: The latest notes are on Sheet 7 and the old notes on Cover .Sheet are
deleted
2. Please clarify your legend. Is the symbol that states "fence" silt fencing, or
some other type of fencing?
S&A Response: Added a silt fence to plan legend
3. Please place on the erosion control plan the note from your report that states
the detention pond will be constructed first and utilized as a sediment trap
during construction. Then indicate on the plan in the area of the detention pond
whether the outlet is to be protected or if the pond is to be over -excavated.
S&A Response: Added to Sheet 4.
Topic: Floodplain
Number: 28
Created: 3/17/2004
1. The building needs to be raised so that the ground surrounding the building and
the finished floor elevation are above the most upstream BFE.
Page 5
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 21 Created: 3/16/2004
(3/16/04] Prairie Dog Removal. Before the commencement of grading or other
construction on the development site, any prairie dogs inhabiting portions of the site
within the LOD (Limits of Development) shall be relocated or eradicated by the
developer using city -approved methods as set forth in Chapter 4 of the City Code and,
when applicable, using methods reviewed and approved by the Colorado Division of
Wildlife. Fort Collins land Use Code 3.4.1(N)(5)
S&A Response: Acknowledged
If Prairie Dogs continue to relocate to the site during construction the project will be
required to install temporary barrier fencing. Contact either Doug Moore or Donna
Dees at 221-6600 for detail on barriers fencing.
S&A Response: Acknowledged
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 12 Created: 3/15/2004
[3/15/04] REQUIRED ACCESS: A fire lone is required. The fire lane shall be visible
by painting and signage, and maintained unobstructed. 1997 UFC 901.2.2.1; 901.3;
901.4.2; 902.2.1; FCLUC
S&A Response: Acknowledged
Number: 13 Created: 3/15/2004
[3/15/04] ADDRESS NUMERALS: Address numerals shall be visible from the street
fronting the property, and posted with a minimum of 6 inch numerals on a contrasting
background. 1997 UFC 901.4.4
S&A Response: Acknowledged
Number: 14 Created: 3/15/2004
[3/15/04] WATER SUPPLY: No commercial building can be greater then 300 feet from
a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an
approved roadway. Each hydrant must be capable of delivering 1500 gallons of water
per minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2
S&A Response: Fire hydrant is shown on Sheet 3 of 7 and is directly across Blue Spruce Drive
Number: 15 Created: 3/15/2004
[3/15/04] SPRINKLER REQUIREMENT: This proposed building shall be fire
sprinklered. When any portion of the facility or any portion of an exterior wall of the
first story of the building is located more then 150 feet from fire apparatus access as
Page 4
Number: 25 Created: 3/16/2004
[3/16/04] Not required at this time but just as an FYI, provide legal descriptions for
the additional utility easement emergency access easement and slope easement for
review. The applicant will be required to provide the necessary deeds of dedication
and recording fees for these easements.
S&A Response: Thanks! I have the slope easement legal and will do the emergency access
easement.
Number: 29 Created: 3/17/2004
[3/17/04] In further discussion with PFA, the fire lone required specified in #12
consists of a 20' emergency access easement to be dedicated around the entire
building connecting to the driveway and out to Blue Spruce Drive.
S&A Response: Acknowledged in Number 25. We have made a 20' emergency access
easement and will dedicate the easement to the City.
Topic: Utility
Number: 22 Created: 3/16/2004
(3/16/04] The amount of drainage directed over the sidewalk exceeds LCUA55
criteria. In general the City Engineer has ruled that an area of up to 750 sq. ft. is
allowed to drain over the sidewalk which is exceeded in the present design.
S&A Response: Highpoint has moved and there is only 744 square feet now flowing to the
sidewalk.
Number: 23 Created: 3/16/2004
(3/16/04] ADS is not allowed in right-of-way. 5pecify C900 or other City approved
pipe.
S&A Response: This pipe is not in the right-of-way. Therefore, I prefer to use ADS for this size
pipe
Number: 24 Created: 3/16/2004
(3/16/04] Is an asphalt Swale at 0.6% sufficient to carry drainage flow? It seems
that the amount of slope isn't sufficient for asphalt and standing water. Degrading the
pavement is likely. (thought or suggestion, not a requirement)
S&A Response: Revised swale to 1 % and Thank you!
Department: Light & Power Issue Contact: Doug Martine
Topic: Light A Power
Number: 7 Created: 3/3/2004
[3/3/04] The builder/developer will need to coordinate power availability, location and
costs with Light & Power Engineering (221-6700).
S&A Response: Acknowledged
Page 3
Number: 32 Created: 3/22/2004
(3/22/04] The Broadmoor and Buffalo Junipers (especially the Buffalo), in conjunction
with the Cotoneaster and Serviceberry, along the north and south property lines are a
little too low to provide good screening of the vehicular use areas. These evergreens
will be counted on to provide the bulk of the Winter screening. Please select a taller
variety of evergreen material.
S&A Response: Revised the Buffalo & Broadmoor - Can't get too high due to the overhead lines
on the North side.
Number: 33 Created: 3/22/2004
(3/22/04] How is the "outside gravel storage" area, on the west side of the building,
to be screened from adjacent properties? Also, what is to be stored?
S&A Response: 6' high wood fence
Number: 34 Created: 3/22/2004
(3/22/04] Please see red -lined plans for Planning comments that may not be included
in this letter.
S&A Response: Revised red -lined plans
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 9 Created: 3/15/2004
[3/15/04] The owner of the transmission line easement will need to provide a letter of
intent agreeing in principle to the development proposal. In general, having the
driveway access within this easement seems to be unusual, will the developer secure
permanent legal right for the operation of the driveway?
S&A Response: We created an approval block on Sheet 3 for their signature
Number: 10 Created: 3/15/2004
[3/15/04] The slope easement directly north of the site requires a letter of intent
from both the Food Bank and the power line easement holder.
S&A Response: We are working with the owners to get a slope easement.
Number: 11 Created: 3/15/2004
(3/15/04] The development illustrates a radius style driveway approach on the plans.
The Street Standards allow for the radial access in cases where there are more than
350 trips a day. The traffic report states that the site will generate less than 200
daily trips, thus the use of a radius style driveway is not to standards.
S&A Response: This site is commerciablindustrial, which uses the radius style driveway. I believe
the 200 TPD is for multi-family/residential
Page 2
`�"j STAFF PROJECT REVIEW
E'ih� n€ iari t'n ll.i: ss
STEWART & ASSOCIATES RESPONSES TO STAFF PROJECT REVIEW
4-20-04
Stewart & Associates Date: 03/22/2004
c/o Jack Blake
103 South Meldrum Street
Fort Collins, CO. 80521
Staff has reviewed your submittal for EVERC,REEN PARK, BLOCK 4, LOT 13 - PDP, and
we offer the following comments:
ISSUES:
Department: Current Planning
Topic: 6enerol
Issue Contact: Steve Olt
Number: 30 Created: 3/19/2004
(3/19/04] Rick Lee of the Building Department offered the following comments:
a. The toilet rooms do not satisfy the requirements of accessibility, so an overview
of the requirements is attached to this letter.
S&A Response: The units are to be tenant finish; all we are doing is installing the services.
b. It appears as if the use of each space in the building will fall within an F-1
occupancy as regulated by the Uniform Building Code.
S&A Response: Acknowledged
C. Be aware that there may be some occupancy separation requirements between
other occupancies such as auto repair. Without proper separation the use of
these spaces may be limited.
S&A Response: Acknowledged
d. A copy of the various codes that the Building Department will enforce is
attached to this letter.
S&A Response: Acknowledged
Number: 31 Created: 3/22/2004
[3/22/04] Western Area Power Authority (WAPA) has a 37.5' wide transmission line
easement along the north line of this property. Does this applicant have permission
from WAPA to use the easement for driveway and landscaping?
S&A Response: A place on the plans has been established for their approval signatures.