Loading...
HomeMy WebLinkAboutEVERGREEN PARK, BLOCK 4, LOT 13 - PDP - 9-04 - CORRESPONDENCE - REVISIONSThis completes staff (and outside reviewing agencies) review and comments at this time. Additional comments and red -lined plans may be forthcoming. Another round of staff review is determined to be necessary. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being March 22, 2004) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your red -lined plans when you re -submit. The number of copies of each document to re -submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt City Planner cc: Marc Virata Mark Langel & Mike Sutton Page 9 to public hearing. S&A Response: The owner is working on a letter. 2. A letter of intent from WAPA, because of its easement on this property, is needed before this item can go to public hearing. S&A Response: Okay. 3. Too much storm water flows are being proposed to go over the drive. S&A Response: Revised 4. The wrong kind of stormwater discharge pipe is being used. S&A Response: Not in right-of-way. Okay. 5. Legal descriptions are needed. S&A Response: Acknowledged Water/Wastewater: 1. The utility plans must show where the gas main is. S&A Response: Done 2. The standard notes are needed on the utility plans. S&A Response: Done. Stormwater: 1. The lower 1/3 of the detention pond does not drain. S&A Response: Revised 2. The proposed grading plan puts this site back into the floodplain. S&A Response: Part of the site was always in the flood plain. 3. The whole site needs to be raised to get it out of the floodplain. S&A Response: This was discussed with Marsha and the building is out and the rest of the site can be in the floodplain. Also, the whole site was never totally out of the flood plain. Transportation Planning: 1. There are no connecting walkways to Blue Spruce Drive. Now is this facility to be used? Why are no pedestrian connections being provided? S&A Response: Added walkway. Page 8 Number: 18 Created: 3/16/2004 [3/16/04] Include all standard general notes on the utility plans (i.e. depth or bury, polywrapping, backf low, etc.). S&A Response: Added Number: 19 Created: 3/16/2004 [3/16/04] Show and label the location of the proposed curb stop and meter pit. See site, landscape and utility plans for other comments. S&A Response: Added to notes. Department: Zoning Topic: ZOAIIA16 Number: 1 [3/1/04] Site plan is incomplete S&A Response: Revised Number: 2 Issue Contact: Jenny Nuckols Created: 3/1/2004 Created: 3/1/2004 [3/1/04] Need to see bike rack location. Suggest on the end of the building near the landscaped area S&A Response: Added at end of building per your suggestion. Number: 3 Created: 3/1/2004 [3/1/04] There needs to be at least one handicap space and that needs to be van accessible - 16' total width. S&A Response: Revised to 1-16 foot -wide HC. Number: 4 Created: 3/1/2004 [3/1/04] Are the building envelope and footprint the same - please note on the site plan S&A Response: Yes. Number: 5 Created: 3/1/2004 [3/1/04] What is the proposed use of the building. Please clarify S&A Response: Light IndustriatlCommercial/Storage The following comments / concerns were expressed at staff review on March 17, 2004: Engineering: 1. A letter of intent from the Food Bank, to the north, is needed before this item Page 7 S&A Response: Raised to 69.9 per our meeting. 2. Please include a note on the plans and in the drainage report that no hazardous, explosive, flammable, toxic, or water reactive materials shall be stored in the outside storage area that is within the floodplain. S&A Response: Added note to Sheet No. 4. 3. A floodplain use permit is required for the site work and outdoor storage. S&A Response: Acknowledged 4. The fencing does not need to be above the floodplain elevation as stated in the drainage report. S&A Response: Removed from Drainage Report. Department: Transfort Topic: General Number: 6 [3/2/04] No comments S&A Response: Acknowledged Department: Transportation Planning Issue Contact: Garold Smith Created: 3/2/2004 Issue Contact: David Averill Topic: General Number: 20 Created: 3/16/2004 [3/16/04] Does this building have a common "main" entrance through which tenants access their work bays/units? Or does each unit have its own private entrance? In any case, there is no discernable connecting walkway or defined pedestrian access from the proposed sidewalk to the building. Please address the requirements of section 3.2.2(c.5.a) on future plan sets. S&A Response: We have added sidewalks now. However, each unit has their own entrance Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 16 Created: 3/16/2004 (3/16/04] Is the electric overhead or underground? Show and label the location of the gas main. S&A Response: The electric is underground The gas main is now shown as per Excel responses for location of their line. Number: 17 Created: 3/16/2004 [3/16/04] Maintain a 4 feet minimum separation between the curb stop/meter pit and the electric, gas, and any permanent structures. S&A Response: Added meter/curb stop to drawings Page 6 measured by an approved route around the exterior of the building or facility it shall be fire sprinklered. S&A Response: Acknowledged Department: Police Topic: General Number: 8 [3/11/04] Need Lighting Plan. S&A Response: The owner is working on one Department. Stormwater Utility Topic: Drainage Issue Contact: Joseph Gerdom Created: 3/11/2004 Issue Contact: Wes Lamarque Number: 27 Created: 3/16/2004 The outlet pipe does not drain the bottom .6 feet of the pond due to the outlet pipe invert set at 66.1. The entire depth of the pond needs to have a positive outfall. Please revise. S&A Response: Revised, however, with extended retention I thought that it would not matter. Topic: Erosion/Sediment Control Number: 26 Created: 3/16/2004 1. Please place the latest version of the City erosion control plan standard. notes ON THE SEDIMENT/EROSION CONTROL PLAN SHEET. Delete the old City notes on the cover sheet. S&A Response: The latest notes are on Sheet 7 and the old notes on Cover .Sheet are deleted 2. Please clarify your legend. Is the symbol that states "fence" silt fencing, or some other type of fencing? S&A Response: Added a silt fence to plan legend 3. Please place on the erosion control plan the note from your report that states the detention pond will be constructed first and utilized as a sediment trap during construction. Then indicate on the plan in the area of the detention pond whether the outlet is to be protected or if the pond is to be over -excavated. S&A Response: Added to Sheet 4. Topic: Floodplain Number: 28 Created: 3/17/2004 1. The building needs to be raised so that the ground surrounding the building and the finished floor elevation are above the most upstream BFE. Page 5 Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 21 Created: 3/16/2004 (3/16/04] Prairie Dog Removal. Before the commencement of grading or other construction on the development site, any prairie dogs inhabiting portions of the site within the LOD (Limits of Development) shall be relocated or eradicated by the developer using city -approved methods as set forth in Chapter 4 of the City Code and, when applicable, using methods reviewed and approved by the Colorado Division of Wildlife. Fort Collins land Use Code 3.4.1(N)(5) S&A Response: Acknowledged If Prairie Dogs continue to relocate to the site during construction the project will be required to install temporary barrier fencing. Contact either Doug Moore or Donna Dees at 221-6600 for detail on barriers fencing. S&A Response: Acknowledged Department: PFA Issue Contact: Michael Chavez Topic: General Number: 12 Created: 3/15/2004 [3/15/04] REQUIRED ACCESS: A fire lone is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC S&A Response: Acknowledged Number: 13 Created: 3/15/2004 [3/15/04] ADDRESS NUMERALS: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6 inch numerals on a contrasting background. 1997 UFC 901.4.4 S&A Response: Acknowledged Number: 14 Created: 3/15/2004 [3/15/04] WATER SUPPLY: No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2 S&A Response: Fire hydrant is shown on Sheet 3 of 7 and is directly across Blue Spruce Drive Number: 15 Created: 3/15/2004 [3/15/04] SPRINKLER REQUIREMENT: This proposed building shall be fire sprinklered. When any portion of the facility or any portion of an exterior wall of the first story of the building is located more then 150 feet from fire apparatus access as Page 4 Number: 25 Created: 3/16/2004 [3/16/04] Not required at this time but just as an FYI, provide legal descriptions for the additional utility easement emergency access easement and slope easement for review. The applicant will be required to provide the necessary deeds of dedication and recording fees for these easements. S&A Response: Thanks! I have the slope easement legal and will do the emergency access easement. Number: 29 Created: 3/17/2004 [3/17/04] In further discussion with PFA, the fire lone required specified in #12 consists of a 20' emergency access easement to be dedicated around the entire building connecting to the driveway and out to Blue Spruce Drive. S&A Response: Acknowledged in Number 25. We have made a 20' emergency access easement and will dedicate the easement to the City. Topic: Utility Number: 22 Created: 3/16/2004 (3/16/04] The amount of drainage directed over the sidewalk exceeds LCUA55 criteria. In general the City Engineer has ruled that an area of up to 750 sq. ft. is allowed to drain over the sidewalk which is exceeded in the present design. S&A Response: Highpoint has moved and there is only 744 square feet now flowing to the sidewalk. Number: 23 Created: 3/16/2004 (3/16/04] ADS is not allowed in right-of-way. 5pecify C900 or other City approved pipe. S&A Response: This pipe is not in the right-of-way. Therefore, I prefer to use ADS for this size pipe Number: 24 Created: 3/16/2004 (3/16/04] Is an asphalt Swale at 0.6% sufficient to carry drainage flow? It seems that the amount of slope isn't sufficient for asphalt and standing water. Degrading the pavement is likely. (thought or suggestion, not a requirement) S&A Response: Revised swale to 1 % and Thank you! Department: Light & Power Issue Contact: Doug Martine Topic: Light A Power Number: 7 Created: 3/3/2004 [3/3/04] The builder/developer will need to coordinate power availability, location and costs with Light & Power Engineering (221-6700). S&A Response: Acknowledged Page 3 Number: 32 Created: 3/22/2004 (3/22/04] The Broadmoor and Buffalo Junipers (especially the Buffalo), in conjunction with the Cotoneaster and Serviceberry, along the north and south property lines are a little too low to provide good screening of the vehicular use areas. These evergreens will be counted on to provide the bulk of the Winter screening. Please select a taller variety of evergreen material. S&A Response: Revised the Buffalo & Broadmoor - Can't get too high due to the overhead lines on the North side. Number: 33 Created: 3/22/2004 (3/22/04] How is the "outside gravel storage" area, on the west side of the building, to be screened from adjacent properties? Also, what is to be stored? S&A Response: 6' high wood fence Number: 34 Created: 3/22/2004 (3/22/04] Please see red -lined plans for Planning comments that may not be included in this letter. S&A Response: Revised red -lined plans Department: Engineering Issue Contact: Marc Virata Topic: General Number: 9 Created: 3/15/2004 [3/15/04] The owner of the transmission line easement will need to provide a letter of intent agreeing in principle to the development proposal. In general, having the driveway access within this easement seems to be unusual, will the developer secure permanent legal right for the operation of the driveway? S&A Response: We created an approval block on Sheet 3 for their signature Number: 10 Created: 3/15/2004 [3/15/04] The slope easement directly north of the site requires a letter of intent from both the Food Bank and the power line easement holder. S&A Response: We are working with the owners to get a slope easement. Number: 11 Created: 3/15/2004 (3/15/04] The development illustrates a radius style driveway approach on the plans. The Street Standards allow for the radial access in cases where there are more than 350 trips a day. The traffic report states that the site will generate less than 200 daily trips, thus the use of a radius style driveway is not to standards. S&A Response: This site is commerciablindustrial, which uses the radius style driveway. I believe the 200 TPD is for multi-family/residential Page 2 `�"j STAFF PROJECT REVIEW E'ih� n€ iari t'n ll.i: ss STEWART & ASSOCIATES RESPONSES TO STAFF PROJECT REVIEW 4-20-04 Stewart & Associates Date: 03/22/2004 c/o Jack Blake 103 South Meldrum Street Fort Collins, CO. 80521 Staff has reviewed your submittal for EVERC,REEN PARK, BLOCK 4, LOT 13 - PDP, and we offer the following comments: ISSUES: Department: Current Planning Topic: 6enerol Issue Contact: Steve Olt Number: 30 Created: 3/19/2004 (3/19/04] Rick Lee of the Building Department offered the following comments: a. The toilet rooms do not satisfy the requirements of accessibility, so an overview of the requirements is attached to this letter. S&A Response: The units are to be tenant finish; all we are doing is installing the services. b. It appears as if the use of each space in the building will fall within an F-1 occupancy as regulated by the Uniform Building Code. S&A Response: Acknowledged C. Be aware that there may be some occupancy separation requirements between other occupancies such as auto repair. Without proper separation the use of these spaces may be limited. S&A Response: Acknowledged d. A copy of the various codes that the Building Department will enforce is attached to this letter. S&A Response: Acknowledged Number: 31 Created: 3/22/2004 [3/22/04] Western Area Power Authority (WAPA) has a 37.5' wide transmission line easement along the north line of this property. Does this applicant have permission from WAPA to use the easement for driveway and landscaping? S&A Response: A place on the plans has been established for their approval signatures. Page 1