Loading...
HomeMy WebLinkAboutEASTGATE PDP - 10-04 - DECISION - FINDINGS, CONCLUSIONS & DECISION2oo 2 __ ilrwl 14ALOtt2`Pf Wa rA-.aura CAIJ.^.J� �dSJ �. S P- L N G,' AJ F ZC_ j p-1 C� Eastgate 2nd Filing Administrative Hearing Findings, Conclusions, and Decision " August 11, 2004 Page 6 of 6 C. The Eastgate 2nd Filing Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code except for Section 3.2.2 where a Modification of Standards has been requested. D. With Respect to Section 3.2.2(L) (1) (a) which sets standards for the design and location of off-street parking spaces: Granting the requested modification would be detrimental to the public good and would impair the intent and purposes of the Land Use Code. 2. The plan as submitted will not advance or protect the public interests and purposes of the standard for which the modification is requested equally well than would a plan which complies with the standard for which a modification is requested. DECISION The Eastgate Project Development Plan and Modification of Standards, #10-04 Is hereby denied by the Hearing Officer. Dated this 25th day of August 2004, per authority granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. Cameron t3lops Current Planning Director Eastgate 2nd Filing Administrative Hearing Findings, Conclusions, and Decision August 11, 2004 Page 5 of 6 4. Evaluation of the Request of a Modification of Standards to Section 3.2.2 Access, Circulation and Parking: As part of the evaluation of this application, the applicant testified at the Administrative Hearing that three alternative designs were reviewed during the course of the site analysis. Of the three site planning options presented at the hearing, Plan "A" was brought forward by the applicant as the preferred option. The Hearing Officer's action is based upon Plan A. This option was used as the basis to modify the parking requirements of Section 3.2.2 of the Land Use Code The Land Use Code sets off-street parking requirements based on the number of bedrooms within each multi -family residential unit. In this case, one and three quarter (1 1/) parking spaces must be provided for each of the four (4) multi- family units, therefore, a total of seven (7) off-street parking spaces is required on -site. In order to be included in the parking calculations, all parking spaces must have unrestricted access. Therefore, "tandem" or back-to-back off-street parking spaces could not fulfill the requirements of this section. The applicant is requesting a design with a total of four off-street spaces, including 2 spaces within individual attached garages and two surface parking spaces. The Hearing Officer does not find that the proposed parking design complies with the modification criteria. The project site is located within a suburban setting, with relatively large lots and parking located predominantly off-street. None of the design options —shown as Plans B and C—submitted by the applicant, and used as a basis of comparison to the proposed development plan, meet the strict application of the City's Engineering Design Standards. To comply with the standards, driveways must be configured perpendicular to the street for a distance of at least twenty five feet and curb cuts must be separated a minimum of twelve feet apart. This proposed configuration does not result in a design that is as safe, convenient and attractive as a compliant plan. SUMMARY OF CONCLUSION A. The Eastgate 2nd Filing Project Development Plan is subject to administrative review and the requirements of the Land Use Code (LUC). B. The Eastgate 2nd Filing Project Development Plan complies with all applicable district standards of Section 4.4 of the Land Use.Code, (LMN) Low Density Mixed Use Neighborhood zone district. Eastgate 2nd Filing Administrative Hearing Findings, Conclusions, and Decision August 11, 2004 Page 4 of 6 Richard Roberts, owner of Lot 16, Eastgate Subdivision and President of the Eastgate Owners Association, identified concern over the lack of approval from the Eastgate Owners Association for use of Tract B as a multi -unit housing site. In addition, a letter from Brian R. Leone, legal representative to the Eastgate Owners Association, was part of the public record and reiterated those concerns and cited additional issues. The stated principal areas of concern are as follows: • Article III of the Declaration of Covenants, Conditions and Restrictions (CC& R's) associated with the Replat of Tract "A" Eastgate, First Filing, requires review and approval of this development to be submitted to and approved by the Architectural Control Committee of the Eastgate Owners' Association. At the time of the hearing, no such review had been completed. • Preamble, Article II of the CC&R's indicates that Tract B would remain an open -space park area and would be utilized for detention and drainage purposes as part of a common scheme and plan related to the subdivision. • Tract B was dedicated to the City of Fort Collins as a "detention and utility easement" on the Replat of Tract "A" Eastgate, First Filing. Note: The PDP application includes a request to vacate a portion of the easement encumbering Tract B. According to the Staff Report, the City staff has found that the drainage pond reconfigured to accommodate additional stormwater runoff from this site and other parcels within the development will function to City standards. Therefore, based on the evidence presented at the hearing, the Project complies with Section 3.3.3 Water Hazards and Section 3.3.5 Engineering Design Standards of the LUC. Although the Hearing Officer finds that the concerns raised by opponents of the PDP are insightful and there may possibly be a violation of private covenants governing the property, the PDP must be judged under the existing applicable regulations of the Fort Collins Land Use Code. The regulations provide sufficient specificity to determine that the Applicant and Owner have designed the PDP in conformance with the applicable regulations. There is no authority for the Hearing Officer to mandate that the Applicant or Owner comply with private covenants that exceed the minimum requirements of the Land Use Code in designing the development. Eastgate 2nd Filing Administrative Hearing Findings, Conclusions, and Decision August 11, 2004 Page 3 of 6 Joanne Perne, 37369 Lee Lake Ave., Windsor Brent Balik, 3109 Azalea Dr. Written Comments: Letter to David E. Phillips from Brian R. Leone, legal counsel to the Eastgate Owners Association, Inc. dated August 4, 2004. FACTS AND FINDINGS 1. Site Context/Background Information The surrounding zoning and land uses are as follows: N: E — undeveloped S: LMN — multi -family residential E: LMN — storm drainage detention pond W: RL — single family residential The property was annexed in October 1967 as part of the Burch Fourth Annexation. 2. Compliance with Article 4 and the LMN — Low Density Mixed Use Zoning District Standards: The Project Development Plan complies with all applicable requirements of Article 4 and the LMN zone district except for the requested modification to the off-street parking standards (see Section 4 below). The Staff Report summarizes the PDP's compliance with these standards and no specific evidence was presented to contradict or otherwise refute the compliance with Article 4 or the LMN District Standards. In particular, the proposed multi -family residential use (with fewer than eight units) is permitted within the LMN zone district subject to an administrative review. 3. Compliance with Article 3 of the Land Use Code — General Development Standards The project development plan complies with all applicable sections of Article 3 of the LUC as explained below. While there was no direct testimony or evidence presented at the public hearing to contradict the Project's compliance with these standards, the testimony of Mr. Eastgate 2nd Filing Administrative Hearing Findings, Conclusions, and Decision August 11, 2004 Page 2 of 6 SUMMARY OF HEARING OFFICER DECISION: Denial ZONING DISTRICTS: LMN — Low Density Mixed Use Neighborhood District STAFF RECOMMENDATION: Approval NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established no controversy or facts to refute that the hearing was properly posted, legal notices mailed and notice published. PUBLIC HEARING The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the hearing at approximately 4:30 p.m. on August 11, 2004 in Conference Rooms C and D, 281 N. College Avenue, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The Hearing Officer accepted during the hearing the following evidence: (1) Planning Department Staff Report; (2) application, plans, maps and other supporting documents submitted by the applicant and the applicant's representatives to the City of Fort Collins; and (3) a tape recording of the public hearing. The LUC, the City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City are all considered part of the evidence considered by the Hearing Officer. The following is a list of those who attended the meeting: From the City: Bob Barkeen, City Planner Katie Moore, Development Review Engineer Wes Lamarque, City Stormwater Engineer From the Applicant: Ric Hattman, Hattman Associates Brian Shear, Shear Engineering Dave and Kerri Phillips, 2932 Des Moines Dr. From the Public: Richard Roberts, 617 Colorado St City of Fort Collins Comn .city Planning and Environment. Services Current Planning CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION ADMINISTRATIVE HEARING DATE: PROJECT NAME: CASE NUMBER: APPLICANT: OWNER: HEARING OFFICER: PROJECT DESCRIPTION: August 11, 2004 Eastgate 2M Filing PDP #10-04 Hattman Associates 145 West Swallow Road Fort Collins, CO 80525 Dave Phillips 1420 Blue Spruce Drive Fort Collins, CO 80524 Cameron Gloss Current Planning Director The Applicant has submitted a request to construct a four -unit multi -family building on an existing tract of land at the southwest corner of Riverside Avenue and Montgomery Street. The site is 33,600 sq.ft. in area and is currently used for storm drainage detention and open space. A subdivision plat is accompanying the PDP. This plat will vacate a portion of the existing storm drainage detention pond to accommodate a 5,900 sq.ft. building envelope. This building is two stories in height and will gain vehicular access from the front of the lot off Montgomery Street. The remainder of the lot will continue to be used for storm drainage detention. A modification of standards request accompanies the PDP and is integral to the proposed design. This modification request is to allow three on -street parking spaces to be counted towards the minimum off-street parking spaces serving the multi -family residential units. The remainder of the parking would be provided in individual garages with each unit. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020