Loading...
HomeMy WebLinkAboutEASTGATE PDP - 10-04 - CORRESPONDENCE - (4)w 3. The project will be subject to the design standards in Sections 3.5.1 and 3.5.2 of the Land Use Code. 4. A replat of the property may be necessary to vacate and re -dedicate easements on the property. Otherwise, the easements may be vacated by ordinance. 4 m the plat. Actually everyone draining into it should contribute to the maintenance which was the original intent until the Homeowner's Association became inactive and Tract B�was sold at tax sale. It would need to be replatted and new drainage easements identified. 4. There is an existing 35-ft. easement along Montgomery St. This is for a future outfall system so it will need to remain. The actual design has not been done but it could be a channel in the future. If there is any proposed grading in this area the design engineer will have to show that the channel can still be constructed within the easement. 5. Since Tract B itself is a detention pond, if it were to change use the design engineer will need to stud)' the entire area this pond serves and show how the detention can be accommodated. 6. There is an outfall pipe from the pond that is not in an easement which will need to be obtained for this project to proceed. I think it ties into the inlet at the corner of Pitkin St. and Riverside Ave. The reason it is needed for this project is that the volume of runoff from this site \will increase and easements are required if the runoff changes in quality, quantity, or character. 7. This site is on the Stormwater inventory map I1J. Transportation Planning: 1. Alternative modes, including pedestrian. bicycle and transit, need to be included in the transportation impact stud;, if required. 2 Bicycle parking will need to be provided in a convenient location adjacent to the residential units, unless garages are provided. 3. A direct connecting walkway will need to be provided from the building entrance to the adjacent sidewalk. Natural Resources: 1. Any existing trees that are proposed to be removed will need to be reviewed by the City Forester (Tim Buchanan — (970) 221-6361). Significant trees that must be removed will need to mitigated. 2. The City requests that the applicant provide adequate room within the trash enclosure for recycling and use a single trash hauler to minimize trips. 3. The Natural Resources Department requests that the applicant pursues and uses native plants and grasses as much as possible within the project. Parks and Recreation: 1. Parkland Development Fees for each unit will be assessed at the time of building permit. This fee is based on the area of each dwelling. Current Planning: 1. A neighborhood meeting will need to be held for this application. Neighborhood meetings are typically held prior to submitting the project to the City for review. Please contact the Current Planning Department to coordinate this meeting. 2. The property will be subject to- the design and land use standards within the LMN zoning district. 3 Poudre Fire Authority: 1. Fire hydrants must be located within 300 feet of all buildings capable of delivering water flows of 1,500 gal/min at 20 psi. 2. Address for the buildings will need to visible from the street, with a minimum of 6 inch letters on a contrasting background 3. Buildings may need to be fire sprinklered, based on size and use. Water/Wastewater: 1. A 6" water line is located in Montgomery Street. 2. Sanitary Sewer is located in the nearby private drive, an easement will need to be acquired to extend this line to serve the site. 3. The water conservation standards for landscape and irrigation will apply. Plant Investment Fees, development review fees and water rights will be due at time of building permit. Engineering: 1. Street Oversizing Fee for Fort Collins of $1,624/unit for single family and $1,120/unit for multi -family will apply. The applicant may contact Matt Baker at (970) 224-6105 for an estimate of the fees. 2. Larimer County Street oversizing fees will apply as well. 3. Additional right-of-way for adjacent streets may need to be dedicated if the existing right-of-way is less than required pursuant to the Larimer County Urban Are Street Standards. Montgomery Street is a local street requiring a total of 51 feet or right-of-way, with a 9-foot easement. 4. A Traffic Impact Study may need to be submitted for this project. The applicant will need to contact Eric Bracke at (970) 224-6062 for a scoping meeting. 5. Adjacent damaged curb, gutter and sidewalk will need to be repaired or replaced. 6. Utility plans, development agreement and a development construction permit will need to be prepared for this project. 7. Driveway separation distances will need to be met. 8. Parking setbacks from the adjacent curb to first stall will need to be provided. Storm Drainage: 1. This site is in the Spring Creek drainage basin where the new development fee is $2175.00/acre which is it is subject to.the runoff coefficient reduction. 2. A drainage and erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. 3. Onsite detention is required with a 2 year historic release rate for water quantity and extended detention is required for water quality treatment. Water quality extended detention is only required for the new development so it could be provided onsite. If the existing pond on Tract B is to be used for water quality extended detention it would have to be sized for the entire area draining to it, not just the runoff from Tract B. The detention on Tract B needs to be maintained and it needs to be sized to accommodate the remaining undeveloped lots using present rainfall and water quality extended detention requirements. It can be modified as needed since it is dedicated as a "detention and utility easement" on 2 0 CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: October 6, 2003 ITEM: Replat of Tract A, East Gate First Subdivision APPLICANT: Dave Phillips Premiere Custom Builders 1420 Blue Spruce Drive Fort Collins. CO 80524 LAND USE DATA: A request to build a two to four unit multi -family residential on Tract A, East Gate First Subdivision at the southwest corner of Riverside Avenue and Montgomery Street. The property is within the City of Fort Collins and is currently zoned LMN — Low Density Residential Mixed Use Neighborhood District. The following departmental agencies have offered comments for this proposal. COMMENTS: Zoning: 1. The land uses within the project are permitted in the zoning district as a Type I (Administrative) Review. 2. The maximum density permitted within the LMN zone district is 8 units/acre, 12 units/acre for affordable housing projects as defined by the City. 3. The number of off-street parking spaces will be subject to the uses proposed within the project. Residential uses will have a minimum number of off-street parking spaces, subject to the standards Section 3.2.2(K)(1) of the Land Use Code. All parking lots will be subject to the design standards in Section 3.2.2(C) of the Land Use Code. 4. Site landscaping will be subject to the landscaping and tree protection standards in Section 3.2.1 of the Land Use Code. 5. The height limit for buildings within the LMN zone district is 2 1/2 stories. Light and Power: 1. Normal development fees will apply to the project. 2. The applicant will need to show the location of utility boxes, meters and service lines on the utility drawings and site plan. 3. Single Phase power source is located along Montgomery Road, adjacent to the site. CONI:NIUNITYPLANNINGAND ENVIROMMENTALSERVICES 281':.CullcgcAve. 1'0.1,,,\580 FurtCulhns,C0511522-0580 (970)221-6730 CURRENT ITANNINC I)ITARIMFNT Comr City Planning and Eneironmentz 'ervices Current Planning City of Fort Collins November 13, 2003 Dave Phillips Premiere Custom Builders 1420 Blue Spruce Drive Fort Collins, CO 80524 Re; East Gate First Subdivision, Tract A Dear Mr. Philips, Attached is a copy of the staffs comments concerning the multi -family residential on Tract A, East Gate First Subdivision presented before the Conceptual Review Team on October 6, 2003. The comments are offered informally by staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sir cerel Bob Barkeen r City Planner cc: file enclosure 281 .North COHL"a, Avenue • PO_ BOX 580 • Port Collim, CO 80522-0580 • �0710) 22t-o750 • FAX (970) 416-2020