HomeMy WebLinkAboutCSURF RESEARCH CAMPUS - ODP - 4-04B - REPORTS - RECOMMENDATION/REPORTCSURF Research Park, Overall Development Plan, #4-04B
December 6, 2007 P & Z Hearing
Page 8
RECOMMENDATION:
Staff recommends approval of Colorado State University Research Foundation O.D.P., #4-
04B.
CSURF Research Park, Overall Development Plan, #4-046
December 6, 2007 P & Z Hearing
Page 7
6. Section 2.3.2 (H) (6) — Drainage Basin Master Plan
This criterion requires an O.D.P. to be consistent with the appropriate Drainage Basin
Master Plan.
The O.D.P. is located in the Cooper Slough/Boxelder Master Drainage Basin. The majority
of the stormwater runoff will be routed to the proposed water quality and detention ponds.
The existing pond will be used for stormwater detention.
All ponds will release the detained 2-, 10-, 50-, and 100-year storm flows into Boxelder
Creek with sensitivity to the Erosion Control Buffer Limit. No new runoff will be directed
into the existing irrigation ditch. The water quality capture volume was calculated using the
Urban Drainage and Flood Control District's Storm Drainage Criteria Manual. This calls for
40-hour extended detention. At the time of Project Development Plan, a Final Drainage
Report will address erosion control and best management practices in accordance with the
City of Fort Collins.
7. Neighborhood Information Meeting
A neighborhood information meeting was held on November 14, 2007. In general,
concerns centered around traffic on East Prospect Road and the timing and funding of
constructing public improvements necessary to serve the site. A summary of this meeting
is attached.
8. Findings of Fact/Conclusion
In evaluating the request for Colorado State University Research Foundation Research
Park O.D.P., Staff makes the following findings of fact:
A. The O.D.P. complies with the applicable standards as stated in of 2.3.2(H)(1-7 ).
B. The City Council rezoned the parcel to E, Employment on November 6, 2007.
C. The City Council voted to trade these 142 acres of land to Colorado State
University Foundation in exchange for 267 acres of natural area in the northwest
area of the Growth Management Area next to Reservoir Ridge Natural Area also
on November 6, 2007. This transaction between the parties was closed on
November 20, 2007.
D. A neighborhood information meeting was held on November 14, 2007.
CSURF Research Park, Overall Development Plan, #4-04B
December 6, 2007 P & Z Hearing
Page 6
There are currently no pedestrian, bicycle or transit facilities at or near
the AVA Solar site. Pedestrian and bicycle facilities will be built when
the various streets are brought up to urban street standards.
4. Section 2.3.2 (H)(4) — Transportation Connections to Adjoining Properties
This criterion requires an O.D.P. to provide for the location of transportation connections to
adjoining properties to ensure connectivity into and through the O.D.P. from neighboring
properties for vehicles, pedestrians and bikes as per Sections 3.6.3 (F) and 3.2.2(C)(6).
A. With regard to Section 3.6.3 (F), this standard addresses continuing the existing
access drive over Boxelder Creek to the Colorado Welcome Center. Since the
balance of the western boundary adjoins the Running Deer Natural Area, there are
no other opportunities to make any other connections.
B. With regard to Section 3.2.2(C)(6), Direct On -site Access to Pedestrian and Bicycle
Destinations, this standard requires that the bike and pedestrian system be
designed to provide logical, safe and direct connections to origins and destinations.
The City Parks and Recreation Policy Plan show the "Boxelder Creek Trail' along
Boxelder Creek. The Parks and Recreation Department indicates that the east side
of the creek may be the best location. This is a long range improvement that will
require close coordination with CSURF to ensure that the best options are
preserved.
5. Section 2.3.2 (H)(5) — Natural Features
This criterion requires an O.D.P. to show the general location and size of all natural areas,
habitats and features within its boundaries and shall indicate the rough estimate of the
buffer zone as per Section 3.4.1(E).
Section 3.4.1 requires a plan to be compatible with and protect natural habitats and
features and minimize impacts through a variety of techniques. One of these techniques is
to use buffer zones.
The O.D.P. has identified Boxelder Creek and its riparian zone as the primary ecological
feature. Other natural features of importance include the existing pond and clumps of
existing Cottonwood trees. All of these natural areas and features will be buffered in
accordance with Section 3.4.1(E). Rough estimates and cross -sections of these possible
buffer zones have been indicated. Finally, an ecological characterization study has been
submitted which indicates those features requiring a buffer zone.
CSURF Research Park, Overall Development Plan, #4-046
December 6, 2007 P & Z Hearing
Page 5
manufacturing employees were assumed to not impact the roadways
during the peak times.
• Currently, the key intersections operate acceptably with existing
control and geometry.
• Intersections along the West Frontage Road, south of Prospect Road,
will not meet peak our signal warrants. All other key intersections are
currently signalized.
• In the short range (2012) future, assuming background traffic only and
no development of AVA Solar, the key intersections will operate
acceptably, except the Prospect/Southbound 1-25 Ramp intersection
in the aftemoon peak hour.
• In the short range (2012) assuming full development of AVA Solar,
plus an increase in background traffic, the key intersections will
operate acceptably, except the Prospect/Southbound 1-25 Ramp
intersection in the afternoon peak hour.
• The Prospect/Southbound 1-25 Ramp intersection will operate
acceptably with the addition of an eastbound right -turn lane.
(2) For the long range future (2030) assuming both and increase in
background traffic and full build -out of the O.D.P., the T.I.S.
concludes:
• The key intersections will operate acceptably but only if the 1-25/
Prospect Road interchange is reconstructed in accordance with the
geometry shown in the "North 1-25 E.I.S" with the addition of dual left -
turn lanes at the Prospect/West Frontage Road intersection.
(3) West Frontage Road Classification
• The T.I.S. recommends that the West Frontage Road be classified as
a major collector street. This cross-section includes two travel lanes,
two bike lanes and no on -street parking.
• The T.I.S. indicates that the City may require separate left turn lanes
on the West Frontage Road at the Prospect intersection.
(4) Pedestrian, Bicycle and Transit Levels of Service
CSURF Research Park, Overall Development Plan, #4-04B
December 6, 2007 P & Z Hearing
Page 4
This standard requires that additional non -signalized, potentially
limited movement, collector or local street intersections with arterial
streets shall be spaced at intervals not to exceed 660 feet between full
movement collector or local street intersections.
The Transportation Impact Study indicates that the West Frontage
Road will be the only intersection with Prospect Road. There will be
no other collector or local street intersections with Prospect Road
serving this O.D.P.
(3) 3.6.3 (F) — Utilization and Provision of Sub -Arterial Street Connections
to and from Adjacent Developments and Developable Parcels.
This standard requires that development plans incorporate and
continue all sub -arterial streets stubbed to the boundary.
The site is bounded by 1-25 on the east, the Poudre River on the south
and Boxelder Creek on the west. The West Frontage Road connects
the parcel to the north. The only opportunity to make a sub -arterial
connection to and from adjacent developments and the O.D.P. is to
maintain and improve the existing bridge over Boxelder Creek to the
Colorado Welcome Center. With this connection, the O.D.P. complies
with the standard.
C. With regard to the requirements of the Transportation Level of Service
Requirements, Section 3.6.4, states that the standards are intended to ensure that
"the project demonstrate that all adopted Level of Service standards will be
achieved for all modes of transportation. "
A Transportation Impact Study has been prepared for both the AVA Solar (Phase
One, short term future - 2012) and the O.D.P. (Future Phases, long term future —
2030).
(1) For Phase One — AVA Solar, the T.I.S. concludes:
• The development of AVA Solar is feasible from a traffic engineering
standpoint. Trip generation was calculated based on a mix of office
and manufacturing employees. There will be an estimated 158 office
employees working a typical 8:00 a.m. to 5:00 p.m. shift Monday
through Friday. In contrast, there will be an estimated 528
manufacturing employees divided between two 12-hour shifts. These
shifts are 7:00 a.m. to 7:00 p.m. and 7:00 p.m. to 7:00 a.m. and
operate 24 hours per day, seven days per week. In determining the
impacts on levels of service at the key intersections, the
CSURF Research Park, Overall Development Plan, #4-04B
December 6, 2007 P & Z Hearing
Page 3
2. Section 2.3.2 (H) (2) — Density Ranges of Residential Uses
This criterion requires that the O.D.P. be consistent with the required density range of
residential land uses if located in the L-M-N or M-M-N zone district.
This standard is not applicable as the entire site is anticipated to include light industrial
uses and support services. There are no planned residential uses.
3. Section 2.3.2 (H)(3) — Master Street Plan and Levels of Service
This criterion requires the O.D.P. to conform to the Master Street Plan and street pattern
and connectivity standards as required by Section 3.6.1 and 3.6.3 (A) through (F). In
addition, the O.D.P. shall also conform to the Transportation Level of Service
Requirements as contained in Section 3.6.4.
A. With regard to compliance with the Master Street Plan, Section 3.6.1, the O.D.P.
acknowledges that East Prospect Road is classified as a standard arterial and the
Southwest Frontage Road is classified as a collector. There are no other master -
planned future streets (defined as a collector or arterial) that traverse or bisect the
parcel.
B. With regard to Street Pattern and Connectivity, Section 3.6.3, the standards are
intended to ensure that the local street system is well designed with regard to
safety, efficiency, and convenience for cars, bikes, pedestrian and transit. There
are three specific sub -sections of the standard 3.6.3 (C), (D) and (F) that are
applicable.
(1) 3.6.3 (C) — Spacing of Full Movement Collector and Local Street
Intersections with Arterial Streets.
This standard requires that potentially signalized, full -movement
intersections of collector or local streets with arterial streets, shall be
provided at least every 1,320 feet, or one -quarter mile.
There is an existing traffic signal at the intersection of Prospect Road
and the West Frontage Road. Since the O.D.P. has only 950 feet of
frontage along East Prospect Road, this standard has been satisfied
by the existing condition.
(2) 3.6.3 (D) - Spacing of Limited Movement Collector or Local Street
Intersections with Arterial Streets.
CSURF Research Park, Overall Development Plan, #4-04B
December 6, 2007 P & Z Hearing
Page 2
COMMENTS:
Background:
The surrounding zoning and land uses are as follows:
N: C; Vacant (Interstate Lands O.D.P.)
S: P-O-L; City of Fort Collins Natural Area and Archery Range
E: C; Vacant (Galatia O.D.P.)
E: County — Commercial; Vacant and R.V. Sales
W: P-O-L; City of Fort Collins Running Deer Natural Area and Welcome Center
The site was originally owned by the City of Fort Collins Utilities and referred to as the
Resource Recovery Farm. Despite this euphemistic title, this operation was typically
called `The Sludge Farm" reflecting its true role in the management of our City's municipal
solid waste. In 2003, at the conclusion of the solid waste operation, the Utilities sold the
land to the Natural Areas Program. At this time, the property was rezoned into two
parcels. The northeast comer was zoned C, Commercial and the balance was zoned P-O-
L, Public Open Lands.
On November 6, 2007, the site was recently rezoned by City Council from C, Commercial
and P-O-L, Public Open Land to E, Employment. On November 20, 2007, the site was
traded by the City of Fort Collins to Colorado State University Research Foundation
(CSURF) in exchange for 267 acres of land in the northwest area of the Growth
Management Area near the foothills next to the Reservoir Ridge Natural Area.
OVERALL DEVELOPMENT PLAN — REVIEW CRITERIA
Section 2.3.2(H)(1) — Permitted Uses and District Standards
This criterion requires the O.D.P. to be consistent with the permitted uses and applicable
zone district standards and any applicable general development standards.
The site is zoned E, Employment. All of the uses depicted on the O.D.P. are permitted in
this zone. The Land Use Standards of the Employment zone are not applicable as there
are no buildings or structures proposed at this time. Such standards will be evaluated with
the P.D.P. associated with AVA Solar, a light industrial manufacturing facility with office
support functions.
ITEM NO. 4
MEETINGDATE 12/6/07
STAFF Ted Shepard
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Colorado State University Research Foundation Research Park,
Overall Development Plan, #4-04B
APPLICANT: Colorado State University Research Foundation
C/o BHA Design
4847 Innovation Drive
Fort Collins, CO 80525
OWNER: Colorado State University Research Foundation
P.O. Box 483
Fort Collins, CO 80522
PROJECT DESCRIPTION:
This is a request for an Overall Development Plan on 142 acres located at the southwest
quadrant of 1-25 and East Prospect Road. The site is the former City of Fort Collins
Resource Recovery Farm. It is located between the Colorado Welcome Center and 1-25.
The Overall Development Plan includes a future development phase for AVA Solar on
approximately 25 acres. This is a light industrial use that will manufacture solar
photovoltaic panels and include offices for support functions. An estimated 600 to 700
employees will be needed for this first phase. Future phases are expected to be a mix of
offices and light industrial.
The site was recently rezoned by City Council from C, Commercial and P-O-L, Public
Open Land to E, Employment. In addition, the site was traded by the City of Fort Collins to
Colorado State University Research Foundation (CSURF) in exchange for 267 acres of
land in the northwest area of the Growth Management Area near the foothills next to the
Reservoir Ridge Natural Area.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
The amended O.D.P. has been evaluated by the standards of Section 2.3.2 (H) (1-7) of the
Land Use Code and complies with these standards. This O.D.P. is being offered in
anticipation of a P.D.P. for AVA Solar, a light industrial use.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT