requirements for the proposed use and the existing sewer line with associated easement
then set the location for the building. As the site slopes generally to the south, the
detention area is located along the southern property line. In order to minimize the
vehicular traffic in front of the proposed building and any future buildings on the parcels
to the north and south, and to maximize stacking for the drive -through lanes, cross -access
as required by the Access Control Plan is proposed in the rear of the property.
Land Use Code criteria variances
Due to the access constraints imposed on the site as described above, a Modification of
Standard was sought to allow vehicular circulation between the front of the building and
the street. This modification to Land Use Code Sections 3.5.3 (B) (1) and (2) was granted
by the Planning and Zoning Board on August 26`h, 2004. A well -marked crossing of a
single, one-way drive lane provides pedestrian connectivity to the building.
Conflicts between land uses or disturbances to natural features
No natural habitat, features, wetlands, or wildlife are present on the site. Surrounding
land uses include commercial to the north and east, vacant land (zoned commercial, but
likely undevelopable) to the south, and a rail corridor to the west. The proposed drive -
through coffee shop is not anticipated to create any conflicts with these uses.
A residence does exist on the commercial property to the north, screened by a 6' wooden
privacy fence. The fence will remain and be enhanced with shrub beds on the proposed
development parcel.
Concerns/issues raised at the neighborhood meeting
A neighborhood meeting was held on September 20`h, 2004. No neighbors participated.
Name of the project
The project is known as The Human Bean Coffee Drive-Thru.
Development construction schedule and phasing
The project will be built as a single phase. Construction is anticipated to begin in the
spring of 2005 and take approximately two to four months to complete.
Design Description
The proposed development is a drive -through coffee shop with two lanes of service and a
walk-up window. Vehicles enter from North College Avenue to the east and circulate
counter -clockwise around the building. One service window and associated stacking is
along the north face of the building, while the other is along the south. Cross access to
adjacent parcels and Alpine Street to the north is provided in the rear, cars are not
anticipated to stack in the outer lanes, allowing for circulation of vehicles not waiting for
service. Employee and patron parking is located to the south of the building.
Pedestrian patrons can reach the building via a walk that connects the public walk along
North College Avenue to the parking area. A concrete pedestrian crosswalk is provided
to reach the seating area, bike rack, and walk-up window in the front of the building. The
crosswalk crosses only one lane on the exiting side of the project to increase pedestrian
visibility and minimize conflicts with the potential higher speed vehicular movements
associated with inbound traffic off of North College Avenue. An existing bus stop
located at the northeast corner of the property will be enhanced with a concrete pad.
Landscaping and shrub beds are used throughout the site to screen and buffer use areas.
An existing wooden privacy fence along the north property line will be enhanced with
shrub plantings. The trash enclosure and parking area in the southwest corner of the
property are also screened with shrubs. Planting beds provide a buffer between the drive -
through lanes and the seating area.
No wetlands or natural areas exist on site, and a rail corridor separates the parcel from
nearby features to the west.
Ownership and maintenance of public and private open space areas
Maintenance of landscaping and open space areas will be the responsibility of the owner
or tenet, as specified by the lease agreement.
Estimated number of employees
It is estimated that there will be a maximum of two employees during normal operation
of the Human Bean coffee shop.
Rationale behind design assumptions and choices
The C.D.O.T. "Short Term" Access Control Plan for North College Avenue restricts the
proposed development parcel and the adjacent parcels to the north and south to a single,
undivided access point that must align with the existing drive on the east side of the
street. This was the key driving force behind the proposed site layout. The proposed
development parcel is approximately 100' in width. In order to align the entry drive
(which can be a maximum of 36' feet wide, and is proposed at 30') with the one across
College Avenue as required, it must be centered on the parcel. The vehicular circulation
3555 Stanford Road, Suite ro5
Fort Collins, Colorado 8o525
Phone: (970) zz6-4074
Fax: (970) zz6-4i96
The Human Bean www.cityscapeud.com
Statement of Planning Objectives e(a)cityscapeud.com
November 23`d. 2004
The Human Bean coffee drive through is located at 799 N. College Avenue. The project
is approximately 1.06 acres in size and meets the definition of a `drive-in restaurant' by the Fort
Collins Land Use Code. The parcel is zoned CN — Commercial North College District. The
project is subject to a Type II review.
City Plan Principles and Policies achieved by the proposed plan
Policy L U-4.6 Existing Plans — The proposed development is consistent with the North
College Avenue Plan.
Policy LU-4.7 Redevelopment /Inf:ll — The proposed development occurs on an unpaved
vacant lot currently used for the storage of rental trailers. The project is located within
the City of Fort Collins Infill Area as defined within the Land Use Code.
Policy T-5.2 Connections — While the primary proposed use is vehicular, pedestrian
connectivity and amenities have been provided, including a seating area and enhanced
pedestrian crossing.
Policy T-5.4 Sidewalks — Improvements constructed with this development will provide a
standard sidewalk along a busy arterial where none currently exists.
Policy CAD-3.1 Modification of Standardized Commercial Architecture — The proposed
architecture is consistent in material and form with several newer buildings in the area
represents a higher level of desired architectural character than many of the surrounding
existing buildings.
Policy CAD-3.2 Compatibility with Surrounding Development — The proposed
development is consistent with surrounding uses in both form and function, while the
architectural character is similar with recent development in the area.
Policy CD-3.1 Transit Facilities — The proposed development will improve an existing
transit stop by providing a larger area for the exiting bench, further from the flowline, and
a concrete instead of dirt surface.
Policy TC-4.5 Infill and Redevelopment - City Plan encourages infill development within
Transportation Corridors.
Policy TC-4.6 Facility Design — The project is enhancing the pedestrian mobility along
the project's frontage.