HomeMy WebLinkAboutCDOT POUDRE RIVER REST AREA - SITE PLAN ADVISORY REVIEW - 27-04 - CORRESPONDENCE - (3)12. The proposed changes to Prospect Road, lane widening and adding turn lanes,
do not appear to be addressed at all in the modeling. Please add if necessary, or at
least discuss in the report why these changes do not need to be modeled.
13. Does CDOT own property to the east of Boxelder Creek? Particularly, in the
area showing a rise?
14. Since the proposed project schedule has been delayed, the FEMA Map
Modernization project is now playing a part in how this project is reviewed. The
bottom line is, the City needs to submit the new Boxelder floodplain mapping to
FEMA by the end of September. Since this project will not be completed by then, we
need to ensure what is proposed will ensure approval by FEMA. Based on
conversations between CDOT (Pete Graham), the City (Susan Hayes) and FEMA
(Dan Carlson) it was agreed that the hydraulic analysis of the site would be
submitted to FEMA along with the City's mapping for the Map Modernization
process. This would assure CDOT that their proposed changes to the floodplain are
acceptable to FEMA and will be incorporated into the map upon completion of the
project.
Department: Transportation Planning Issue Contact: Mark Jackson
Topic: Transportation Planning
Number: 11 Created: 8/3/2004
[8/3/04] Per previous discussions with the CDOT/Stantec team, please add
pedestrian connections from rest area, along frontage road to Prospect. We had
talked about the importance of providing safe pedestrian facilities for rest area
visitors to walk over to interstate commercial areas when developed. Is the plan still
to construct the frontage road south of Prospect to match the cross section north of
Prospect (e.g. bike lanes, c&g, sidewalk, etc.?) Show bike lane detail on site plan for
frontage road.
Number: 12 Created: 8/3/2004
[8/3/04] Please make certain adequate bike parking is installed at rest area.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 3 Created: 7/16/2004
[7/16/04] No comments
Please return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
Cameron Gloss
Current Planning Director
Page 6
release rate that matches the historic flows from existing basin EX2, and not from
the entire area draining into the ponds. The release rate would be the 2-year historic
flow rate for basin EX2, or the 100-year historic flow rate for basin EX2 if previously
mentioned conditions are met. Again, if it is proven that there is no negative impact
to properties downstream, a release rate higher than the 100-year historic flow rate
of basin EX2 and equal to the 100-year historic flow rate of the entire area draining
into the ponds can be used.
A meeting may want to be scheduled to further clarify this issue.
Number: 26 Created: 8/6/2004
Further comments may follow once more information is submitted.
Topic: Floodplain
Number: 25 Created: 8/5/2004
1. The following comments are not complete since the modeling work of Stantec is
not complete (per Dawn Gladwell). There may be additional comments after the full
modeling report is submitted.
2. Please check the floodplain boundaries on the Site Plan. They don't appear to
be correct.
3. Any fencing in the floodway will have to be break -away and cabled to prevent
floating downstream.
4. Please add the floodplain/floodway to the Landscaping Plan and add a note
stating any changes to landscaping in the floodway must be approved by
Stormwater.
5. Make sure not only the grading, but also the landscaping material is modeled in
the Modeling Report. Shrubs and evergreen trees can be a barrier to flow.
6. With the revision of the new city mapping to show the as -built topo for the
Welcome Center, there is now a portion of the site that is outside the city floodplain
but still in the effective FEMA floodplain. This will not be changed until the new
mapping is adopted by FEMA, in approximately 18 months. The only way to change
the map is to submit a map revision to FEMA. This will be addressed with the
submittal in 14 below.
7. In the report, the building square footage is smaller than stated in the Planning
Objectives document. Please ensure you are modeling the correct building.
8. On page 4 there is a reference to "future plans will include the Welcome
Center." Please clarify if this means there will be a new building or the Welcome
Center will be housed in the building shown on the plans.
9. The proposed garage must also meet floodplain regulations. To meet the
floodplain regulations it can either be elevated or built at -grade with venting.
Unfinished up to the regulatory flood elevation and all hazardous materials inside
stored above the regulatory flood elevation.
10. On pages 6 and 12, please remove reference to the model being produced at
the master plan level. This is not applicable to floodplain mapping.
11. Page 6, Corrected Effective: add reference to using the as -built topo for the
Welcome Center in addition to the 1999 topo.
Page 5
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 13 Created: 8/3/2004
[8/3/04] No Comment
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 14 Created: 8/4/2004
As per conceptual review comments, the site requires detention for the 100-year
storm with a release rate equal to the 2-year historic flow, not the 100-year historic
flow. However, if an analysis can show that releasing at the 100-year historic rate
does not have a negative impact on the river and downstream property between the
site and the river, this 100-year historic rate can be used.
Number: 15 Created: 8/4/2004
Due to site flows draining from one detention pond to another, the conveyance
between the ponds needs to be sized for the entire 100-year flow of the upstream
basin or an Extran analysis needs to show the timing of the flows and tailwater
conditions will work with this design. Extran would normally be required for sites
larger than 20 acres.
Number: 16 Created: 8/4/2004
The developed flows from existing subbasin EX3 that drain to the south field are
draining into an area with no defined outfall. This is allowed without a drainage
easement downstream only if the flow has not increased in peak discharge,
increased in volume of flow, and changed in character or quality of flow. Due to the
site design redirecting some of the flows in basin EX3 to Boxleder Creek, the above
conditions are more likely possible. The report also needs to document what
condition the existing outfall swale is in and if any improvements are necessary.
The Natural Resource department will need to accept the runoff as shown. They
may require an easement. Please contact Doug Moore @ 224-6143.
Number: 23 Created: 8/5/2004
The report text has a lot of inconsistencies when compared to what is actually
designed. Please update the text to what is actually being proposed.
Number: 24 Created: 8/5/2004
The design is proposing to transfer flows from the Poudre Basin into the Boxelder
Creek Basin. Due to this site being at the downstream end of the basins and the
area in the Poudre Basin having no defined outfall, this design will be acceptable if
proven that no negative impacts are created downstream in the Boxelder Creek
Basin.
A general rule when transferring or redirecting flows from one basin to another is
that the detention ponds that release into Boxelder Creek would need to have a
Page 4
A fire lane is required. The fire lane shall be visible by painting and signage, and
maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
Number: 18 Created: 8/4/2004
[8/4/04] PREMISES IDENTIFICATION: Approved numerals or addresses shall be
provided for all new and existing building in such a position as to be plainly visible
and legible from the street or road fronting the property. 1997 UFC 901.4.4
A. In Multi -story buildings the following requirements shall pertain.
1. The first floor units shall be designated with 100's.
2. The second floor units with 200's
3. The third floor units with 300's, and so forth.
B. All brass letters and numerals shall be posted on a black background.
C. Some multi -family layouts may require address postings from the back side as
well as the front of the buildings.
D. A counter clockwise addressing pattern shall be maintained when ever possible.
E. An addressing scheme shall be submitted to the fire department for approval prior
to being posted on the building.
Number: 19 Created: 8/4/2004
[8/4/04] WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per
minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2
Number: 20 Created: 8/4/2004
[8/4/04] SPRINKLER REQUIREMENTS:
These proposed buildings shall be fire sprinklered.
1997 UFC 1003.2.9
NOTE: When any portion of the facility or any portion of an exterior wall of the first
story of the building is located more then 150 feet from fire apparatus access as
measured by an approved route around the exterior of the building or facility it shall
be fire sprinklered. 1997 UFC 902.2.1
Number: 21 Created: 8/4/2004
[8/4/04] KNOX BOX:
Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new
building equipped with a required fire sprinkler system or fire alarm system.
1997 UFC 902.4; PFA POLICY 88-20
Number: 22 Created: 8/4/2004
[8/4/04] FIRE LINE REQUIREMENT:
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line
unless hydraulic calculations can support a smaller fire line.
Page 3
Number: 10 Created: 8/3/2004
[8/3/04] Please see redlines for any additional comments.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light & Power
Number: 1 Created: 7/16/2004
[7/16/04] If the electric utility facilities are installed as shown on the utility plan, the
developer will need to provide the permit to cross Boxelder creek. Also, the location
of the electric facilities across the creek (bored under?) will need to be coordinated
with Light & Power.
Number: 2 Created: 7/16/2004
[7/16/04] The developer needs to coordinate the location of the electric facilities with
Light & Power Engineering. The electric transformer must be located within 10 ft. of
a paved surface for line truck access. Electric Development Charges will apply.
Light & Power will need a Commercial Service Information (C-1) Form completed
outlining the customer's power requirements. Contact Light & Power Engineering at
(970)221-6700.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 5 Created: 8/2/2004
[8/2/04] The design of the structures should comply with 3.4.1 (1) (1) & (2).
(1) Design and Aesthetics.
(1) Project design. Projects in the vicinity of large natural habitats and/or natural
habitat corridors, including, but not limited to, the Poudre River Corridor and the
Spring Creek Corridor, shall be designed to complement the visual context of the
natural habitat. Techniques such as architectural design, site design, the use of
native landscaping and choice of colors and building materials shall be utilized in
such manner that scenic views across or through the site are protected, and
manmade facilities are screened from off -site observers and blend with the natural
visual character of the area. These requirements shall apply to all elements of a
project, including any aboveground utility installations.
(2) Visual Character of Natural Features. Projects shall be designed to minimize the
degradation of the visual character of affected natural features within the site and to
minimize the obstruction of scenic views to and from the natural features within the
site.
Department: PFA
Topic: Drainage
Number: 17
[8/4/04] REQUIRED ACCESS:
Issue Contact: Michael Chavez
Created: 8/4/2004
Page 2
i STAFF PROJECT REVIEW
ON of Fort Collins
STANTEC CONSULTING, INC. Date:08/06/2004
DALE STEIN
209 S. MELDRUM
FT. COLLINS, CO 80521
Staff has reviewed your submittal for CDOT POUDRE RIVER REST AREA PDP -
SITE PLAN ADVISORY REVIEW - TYPE II, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number: 6 Created: 8/3/2004
[8/3/04] Through documents provided by Stantec, in conjunction with analyzing
additional documents with the City's Chief Surveyor, it appears that Prospect Road
is within City Right -of -Way to a point approximately 410 feet east of the centerline of
the frontage road intersection with Prospect. The frontage road is also City property,
with an overlying access easement granted to CDOT. Since both of these roadways
are City -owned, improvements to the roadways should be made to City standards.
Please see the Larimer County Urban Area Street Standards for the applicable
regulations. The frontage road is designated as a collector street on the City's
Master Street Plan, and should be improved to collector standards (without parking)
along the Rest Area property frontage. Design of the Frontage Road should be
provided for the property frontage, plus preliminary offsite design for 500' per
LCUASS. Please note that the City understands that the cross-section for Prospect
will not include curb and gutter. Please provide more detailed plan and profile
sheets for these street designs, and please show CDOT ROW/easements vs. City
ROW/easements very clearly on these plans.
Number: 7 Created: 8/3/2004
[8/3/04] Who will build, own, and maintain the traffic lights proposed? CDOT?
Number: 8 Created: 8/3/2004
[8/3/04] It appears that there is a small structure on the south side of the Rest Area
with a driveway that comes in from the south through a gate in the fence. This
driveway appears to cross over City property in some fashion. Please show where
this driveway goes. Is there an existing easement for it? If not, this is another
easement (in addition to the 50' temporary construction easement along the
northwest property line) that would need Council approval, and legals should be
submitted for processing very soon.
Number: 9 Created: 8/3/2004
[8/3/04] Please provide utility plans per LCUASS specs, with a standard cover
sheet, city signature blocks, etc.
Page 1