HomeMy WebLinkAboutWILLOW STREET LOFTS - PDP - 24-04 - CORRESPONDENCE - (16)or 12 dwelling units (I-L, A-D, and E-H). The number of bedrooms per unit still needs to be
indicated.
Number: 77 Created: 10/17/2006
[10/17/06] Need to show/label and dimension the building footprint/envelope and setbacks
from building to lot lines.
You will not be required to have another formal round of review prior to hearing. However,
there are several items which we identified at the end of staff review which need to be
addressed and reviewed before hearing. These items are: architectural design and
compatibility; Letters of Intent from Helen Matson at the City's Real Estate Services and the
Bas Bleu Theatre; written acknowledgement that additional design work may be required for
Pine Street if not addressed with the CIP project; a plat if you choose to replat; a
maintenance agreement with Craig Foreman at the Parks Department for the United Way
parking lot; water quality measures to be incorporated into the design; and the modification
for the 4"' story on the Willow building. Once we have had a chance to review these
revisions, and assuming that the revisions are adequate, we will be able to schedule your
administrative hearing.
Be sure and return all of your redlined plans when you re -submit. You may either deliver the
whole packet to me to distribute or you may deliver to individual reviewers.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6206.
Sincerely,
PnneH. WAspe/kjj"
City Planner
Page 7
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 3 Created: 7/14/2004
(10/17/06] The routing cover sheet still states that this is a Type 2 project. It can be a Type
1 as long as the "commercial" uses are limited to those that are Type 1 uses. If they want
this to be a Type 1, then they should clearly indicate that the "commercial" in the Land Use
Statistics table is for "Type 1 commercial uses only".
[7/14/04] The project is entered in the system as a Type 2. The 9-9-02 conceptual review
comment letter indicates that the uses required a Type 2. The applicants 7-8-04 letter
states that multi -family and commercial/retail are permitted as a Type 1. The applicants 7-8
letter is correct. It was the Giddings Building conversion to theater that triggered a Type 2,
but since that is no longer part of this particular PDP, then this project can now be
processed as a Type 1.
Number: 4 Created: 7/14/2004
[10/17/06] 1 no longer have the original submittal plans to refer too, so I can't recall the
specifics of this comment. However, if this is now one big building, then some description
would be helpful. i.e. Mixed -use building with commercial uses and 20 dwelling units. If the
carport actually separates the building into multiple buildings, then there needs to be a
description of what each building is and how many dwelling units in each building.
[7/14/04] The Land Use Statistics table on the site plan should contain a better description
of the residential component. For instance, all that is stated is that there are 24 1-bedroom
units. However, it should be stated that there is one 8-plex (Q to X), one 4-plex (M-P) and
one mixed use building that contains what looks to be either 8 dwelling units (I - L and A-D)
or 12 dwelling units (I-L, A-D, and E-H). The number of bedrooms per unit still needs to be
indicated.
Number: 77 Created: 10/17/2006
[10/17/06] Need to show/label and dimension the building footprint/envelope and setbacks
from building to lot lines.
Be sure and return all of your redlined plans when you re -submit. You may either submit the
whole packet to me to distribute or you may deliver to the individual reviewers.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6206.
Sincerely,
Anne H. Aspen
City Planner
Page 7
Topic: Stormwater- Utility Plans
Number: 86 Created: 10/17/2006
[10/17/06] Please add to the legend a key to all the different line weights. Show all existing
and proposed utilities. -
Topic: Stormwater- water quality
Number:80 Created:10/17/2006
[10/17/06] No water quality measures are shown. The site needs to provide some
measures for water quality. A disconnected impervious areas concept would be ideal in
ultra urban areas such as this one.
Topic. Stormwater-Parking Lot Drainage
Number: 112 Created: 10/19/2006
[10/19/06] The current design concentrates the drainage in pans in the parking lot, this will
create adverse conditions in the long run, it is recommended that alternate drainage design
be used. A meeting is requested whereby alternative design ideas can be discussed with
the applicant and the engineer.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterlWW
Number: 100 Created: 10/18/2006
[10/18/06] Is a separate irrigation tap planned for the site?
Number:101 L Created: .10/18/2006
[10/18/06] For 20 residential units, a 2" water service is typically installed. If there is a
preference to use a 1-1/2", please provide sizing calculations for the water service. Keep in
mind, however,. that the development fees for multi -family are based upon number of units
and lot area rather than the size of water service.
Number: 102 Created: 10/18/2006
[10/18/06] Curb stops for the domestic water services must be within an easement.
Number:103 Created: 10/18/2006
[10/18/06] Include 6-inch GV in the note at the connection of the fire line to the existing fl-
inch water main.
Number: 104 Created: 10/18/2006
[10/18/06] Correct the size of the 90-degree bend on the fire line and remove the valve
shown downstream from this bend.
Number: 105 Created: 10/18/2006
[10/18/06] Show the existing water/sewer and fire line services to Bas Bleu.
Number:106 j Created: 10/18/2006
[10/18/06] Add thrust block details.
Number: 107 Created: 10/18/2006
[10/18/06] It may be possible to convert the remaining portion of the 6-inch sewer in the
alley/Poudre Street (NW of Pine) to a service line and eliminate the new MH being installed.
The final determination on this can be done during final compliance.
Page 6
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number. 95 Created: 10/18/2006
[10/18/06] FIRE DEPARTMENT CONNECTION: The fire department connections) shall be
installed on the street or fire -lane side of the building(s),'in close proximity to a fire hydrant,
fully visible and recognizable from the street or nearest point of fire department vehicle
access or as otherwise approved by the fire code official. . .
Number: 96 Created: 10/18/2006
[10/18/06] BREEZEWAY: Please provide me details as to the design of the breezeway,
e.g., width and whether it is open to the sky.
Number: 97 Created: 10/18/2006
[10/18/06] PREVIOUS COMMENTS: Previous comments from Michael Chavez in 2004 still
apply. i
Number: 98 Created: 10/18/2006
[10/18/06] STANDPIPE AND FIRE PUMP: Four-story buildings are required to be equipped
with an approved standpipe system capable of supplying 100 psi to the top floor. A fire
pump may be needed to achieve 100 psi.
Number: 99 Created: 10/18/2006
[10/18/06] STAIRWELL SIGNAGE: Approved stairwell identification signs shall be posted at
each floor level in all enclosed stairways.in buildings four.or more stories in height.
97UFC1210.4 and Appendix I-C
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Landscape Plan
Number: 108 Created: 10/18/2006
[10/18/06] Provide 10 feet separation between the proposed MH and trees.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamden
Topic: Plat
Number: 84 Created: 10/17/2006
[10/17/06] Please provide a copy of the plat if this development is being replatted. If not
than easements by separate document should be provided.
Topic. stonnwater- grading
Number: 78 Created: 10/17/2006
[10/17/06] Please show proposed Northside Aztlan grading, show how this site will tie into
the proposed elevations. Provide spot elevations along property boundaries.
Topic: stormwater- maintenance
Number: 79 Created: 10/17/2006
[10/17/06] Since all the flows are directed at the nearby United Way parking lot, a
maintenance agreement may be needed between the City and this development regarding
the long term maintenance of off -site drainage facilities.
Page 5
Number: 76
Created: 10/5/2006
[10/5/06] In order to determine the size of the new transformer(s), the developer will need to
coordinate the power requirements for the new buildings with Light & Power Engineering
(221-6700). Light & Power Development Charges will apply.
Department: Natural Resources Issue Contact: Doug Moore
Topic: Air Quality
Number: 8 Created: 7/27/2004
[10/19/061
[7/27/04] Prior to occupancy, indoor air quality must be measured properly and in
accordance with local, state, and federal health standards to ensure safe public use.
Number: 36 Created: 7/28/2004
[10/19/06]
[7/28/04] Characterization and proper handling and notification of any contaminated
materials encountered during construction must be made to all applicable local, state and
federal regulatory agency contacts.
Number: 37 Created: 7/28/2004
[10/19/06]
[7/28/04) Design and construction of sub -slab venting system for any new construction must
be incorporated due to contamination from the former Poudre Valley Gas Company which
may trigger unsafe indoor air quality.
Topic: General
Number: 7
Created: 7/27/2004
[10/19/061
[7/27/04] This project will be needed to provide written statement verifying that the
development plan fully complies with environmental regulations.
3.4.1 Natural Habitats and Features
(0) Proof of Compliance.
(2) If the Director obtains credible information regarding threatened or pending regulatory
enforcement action related to an environmental condition of the property to be developed, or
an environmental impact related to the development plan, then the Director may require the
developer to provide to the city written statements from such governmental agencies as the
Director may designate as having related jurisdiction based on the nature of the threatened
enforcement action or environmental impact. Said statements shall verify that the
development plan fully complies with environmental regulations within the jurisdiction of the
writing agency. If the developer, after a diligent effort, is unable to obtain such written
verifications from one (1) of more of the designated agencies, the developer shall at least
provide to the city a written verification from said agency that the cit 's approval of the
development plan will not interfere with a threatened or pending environmental enforcement
action of said agency. All required written statements shall be provided to the Director prior
to the scheduling of the hearing for the project development plan.
Page 4
Number: 94 Created: 10/18/2006
[10/18/06] Willow Street improvements need to be coordinated with Kathleen Bracke. On
the Northside Aztlan Community Center, rather than build public improvements along Willow
Street, a local street portion was collected at $95 per linear foot.
Number: 113
Created: 10/20/2006
[10/20/06] The plans indicate that Pine Street design is to be done by the City at a future
date. I'm not sure why this is to be the case. The plans should show a Pine Street design
including along the Bas Blau Theater property as evidence that the proposed frontage
improvements will tie into both existing and future improvements abutting the theater.
Department: Engineering
Topic: General
Number: 28
Issue Contact: Sheri Wamhoff
Created: 7/27/2004
[10/17/06 - mpv] A variance request was received and approved. Please consider this
response as the approval, unless a formal response letter is desired.
[7/27/04] The driveway off of Willow Street does not meet the driveway spacing requirement
for a high volume driveway and a street intersection (175 feet). Need to submit a variance
for this with justification and it will be reviewed.
Number: 56
Created: 8/2/2004
[10/17/06 - mpv] The alley has been vacated, with a utility easement reserved. As the
project proposes building over a portion of the easement, this can only take place if the
utility easement portion is vacated. Coordination needs to be done with the utility providers
for verification that the utilities can be relocated.
[7/27/04] Alley vacation — Per Ordinance No. 106, 2004 recently adopted by City Council I
need to receive the following in order to start pursuing the vacation. I need a legal
description of the area proposed for vacation in hard copy and electronic format prepared by
a licensed surveyor. I can use the map and letter you have already provided for the
justification. I don't believe a fee has yet been established for this process.
Number: 58 Created: 8/2/2004
[10/18/06 - mpv] Letters of intent from City real estate services are needed as well as Bas
Bleu Theater prior to a hearing..
[7/27/04] Prior to being able to schedule this project for hearing letters of intent for off -site
easements are needed, all of the easements that will be needed on site and off site need to
be shown on the plans, and preliminary street plan and profile design information for Pine St
and Willow St per the check sheet requirements need to be provided.
Number: 60 Created: 8/2/2004
[10/17/06 - mpv] Please keep in mind for reference that each dedication is subject to a
Transportation Development Review Fee of $250.
[7/27/04) Are you planning on platting or processing all of the easements by separate
document?
Department: Light & Power
Topic: Electric Utility
Issue Contact: Doug Martine
Number: 75 Created: 10/5/2006
[10/5/06] The original plan, at the time Bas Bleu was developed, did not have garages at
the N.E. comer of the site. There is an underground high voltage power line where these
garages are shown. It will be necessary to relocate these lines at the developer's expense.
Page 3
Topic: Architectural Elevations
Number: 88 Created: 10/17/2006
[10/17/061 Razor wire would be inappropriate on a 30" high decorative fence in the
downtown area.
Number. 93 Created: 10/17/2006
[10/17/061 This project needs to have architectural detailing that draws more from the rich
cues of downtown, the Giddings Building and even the new NACC. I'd be happy to discuss
this further if you wish. See Section 4.13 (D)(3)(e).
Topic: Landscape Plan
Number: 109 Created: 10/19/2006
[10/19/06] Tim Buchanan, City Forester comments as follows:
"1. Change the species along the west side of the site by the Aztlan center from Fall Gold
Ash to Marshall Green Ash. Marshall Ash is used at the Aztlan Center along this entry way,
and also Fall Gold is not a durable.
2. Change the row of trees along the north side of the project from Autumn Purple Ash to
Bur Oak, Honeyocust or another approved species."
Number:110 jp/:�- Created: 10/19/2006
[10/19/06] The four story building on W(f(D!)(3)@(1).
Street would only be allowed with a
modification of standard for Section 4.1 Please alter design to comply or submit
a request for modification letter. Contact me if you need assistance in drafting this letter.
Number: 111 Created: 10/19/2006
[10/19/06] Please return redlines when you resubmit.
Topic: Lighting Plan
Number: 92 Created: 10/17/2006
[10/17/06] The site plan of the photometric plot is not the same as the site plan. Please
update. There appears to be excessive light spill from the site beyond property lines.
Please address. House side shields may be in order.
Department: Engineering
Topic: General
Number: 83
Issue Contact: Marc Virata
Created: 10/17/2006
[10/17/06] Realizing that a previous comment noted that the flowline for the head -in parking
along Pine should be brought around to the front of the parking stalls, not continue as a pan
behind the parking stalls, I'd request that we explore a compromise design where the f-line
is brought back to the original design and the parking stalls are done in concrete. With such
small areas needing to be done in asphalt and the use of sidewalk culverts in the present
design, perhaps there is mutual benefit in looking at this further.
Number: 85 Created: 10/17/2006
[10/17/06] Please provide some spot elevations from the Northside Aztlan plan set to
confirm that the proposed plan ties into the improvements specified for the approved
Northside Aztlan drawings.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
LAGUNITAS COMPANIES Date: 10/23/2006
JON PROUTY
3944 JFK PKWY #12E
FT. COLLINS, CO 80525
Staff has reviewed your submittal for WILLOW STREET LOFTS PDP - TYPE I (LUC), and
we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number: 81 Created: 10/17/2006
[10/17/06] The following departments and agencies indicate that they have no further
concerns with this project: Technical Services, Park Planning, US Postal Service, GIS, and
Water Conservation.
Number: 82 Created: 10/17/2006
[10/17/06] Comcast comments as follows:
"Again Comcast will not vacate the alley way which has our current facilities that feed the
Aztlan Center which are shown on the site plan. We would also like to see 13-foot utility
easements along both Pine and Willow St."
Number: 87 Created: 10/17/2006
[10/17/06] Real Estate Services comments as follows: "Vacated alley has been reserved as
a utility easement - once the utilities are moved with the construction of the Northside Aztlan
Community Center (NACC), this easement can be vacated. Conveyance of our portion of
the alley will require Council approval."
Number: 114 Created: 10/23/2006
[10/23/06] Carol Tunner would like to see the Giddings Building elevation on the Arch
Elevation plans or at least an indication of the height of the Giddings building. Also, she
suggests that you add some ornamental trees in cut outs to the Southeast elevation.
Topic: Site Plan
Number: 89 Created: 10/17/2006
[10/17/06] How does a resident access the mailboxes?
Number: 90 Created: 10/17/2006
[10/17/06] Is the walkway between the buildings intended to be a through walkway to the
street sidewalk?
Number: 91 Created: 10/17/2006
[10/17/06] Please identify accessible parking spaces, the trash enclosure. Other minor
comments on redlines.
Page 1