states that multi -family and commercial/retail are permitted as a Type 1. The applicants 7-8
letter is correct. It was the Giddings Building conversion to theater that triggered a Type 2,
but since that is no longer part of this particular PDP, then this project can now be
processed as a Type 1.
Number: 4 Created: 7/14/2004
[7/14/04] The Land Use Statistics table on the site plan should contain a better description
of the residential component. For instance, all that is stated is that there are 24 1-bedroom
units. However, it should be stated that there is one 8-plex (Q to X), one 4-plex (M-P) and
one mixed use building that contains what looks to be either 8 dwelling units (I - L and A-D)
or 12 dwelling units (I-L, A-D, and E-H). The number of bedrooms per unit still needs to be
indicated.
Number: 5 Created: 7/14/2004
[7/14/04] Provide information or a detail of the 'low fence".
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Printed and distributed by Sheri Wamhoff.
Gt
Page 7
Number: 43 Created: 7/29/2004
[7/29/04] Curb extensions shown at the driveway entrances are not necessary, typically curb
extensions are placed at intersections or mid -block crosswalks to shorten the crossing
distance of pedestrians and improve their safety and visibility.
Number: 44 Created: 7/29/2004
[7/29/04] Please show all necessary access ramps on all plan sets including utility plans.
Number: 45 Created: 7/29/2004
[7/29/04] Additional coordination may be necessary with the theater. I'm still not sure how
the residential parking stalls will be used only by residents and not theater patrons? Please
provide more information with the next submittal.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 50 Created: 7/30/2004
[7/30/04] Provide separate water and sewer services for each use and separate building.
Provide elevation views which clearly show this as one building.
Number: 51 Created: 7/30/2004
[7/30/04] How will remaining house on the northwest end of this development be provided
with water and sewer services if the existing services are being abandoned?
Number: 52 Created: 7/30/2004
[7/30/04] Include the standard general note to extend water and fire line for mixed use
portion into a mechanical room with back flow devices installed there.
Number: 53 Created: 7/30/2004
[7/30/04] Proposed sanitary sewer service for the mixed use portion must connect to the
sanitary trunk at a manhole.
Number: 54 Created: 7/30/2004
[7/30/04] Maintain 4 feet clear separation between the proposed curb stop/meter pit and
gas/electric mains. Will irrigation taps be need for this development.
Number: 55 Created: 7/30/2004
[7/30/04] Show all underground utilities in all utility profile views.
See site, landscape and utility plans for other comments.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 1 Created: 7/14/2004
[7/14/04] Need to show parking stall and drive aisle dimensions.
Number: 2 Created: 7/14/2004
[7/14/04] A modification to Section 3.2.2(K) will be required since not all of the required
parking spaces are located off-street.
Number: 3 Created: 7/14/2004
[7/14/04] The project is entered in the system as a Type 2. The 9-9-02 conceptual review
comment letter indicates that the uses required a Type 2. The applicants 7-8-04 letter
Page 6
asphalt, concrete, or building would be the pond. If so, please change the note to reflect
this.
4. Please delete all the notes on plan sheet 2 under the heading "Grading and Erosion
Control Notes", you have the correct notes on sheet #7.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 38 Created: 7/29/2004
[7/29/04] Further internal discussions need to take place within the City to determine what
the ultimate cross section or design of Willow and Pine St. will be and what type of
improvements this development will be responsible for.
Number: 39 Created: 7/29/2004
[7/29/04] The pathway show in the alley right of way on the north side of the proposal will
need to continue to the southeast across Pine St. Either remove the on -street parking to
allow the path to continue or realign the path so that the parking does not block the path's
extension or visibility of the path users. If the right of way is proposed to be vacated then this
walkway will need to be placed in a public access easement since it will not only serve this
property but the entire downtown river corridor by providing access to the Aztlan center,
United Way and other downtown destinations. The minimum path width needs to be 8' since
it will serve as a multi -use facility for people accessing the above mentioned destinations.
This pathway would also be in -line with the Downtown Strategic Plan's strategy for
improving pedestrian porosity in the downtown area. Further, the pathway could potentially
connect to the trail proposed along side Riverside Drive as called for in the access
management plan and lead directly into the downtown area.
Number: 40 Created: 7/29/2004
[7/29/04] Please contact Randy Hensley in Parking Services (416-2058) regarding the
future study that will address downtown residential parking requirements and possible new
strategies that can be applied. It may be difficult to get the modification to count the parking
on Willow to satisfy your parking requirements. However, I would strongly suggest you
contact the United Way to see if there is a possible shared parking scenario that can be
explored or locations where additional parking can be added, even restriping the lot
configuration may achieve a few additional spots.
Number: 41 Created: 7/29/2004
[7/29/04] Please use the standard driveway cut for the Willow St. and Pine St. driveways
and not the radial style curb returns, unless the landscaped areas are planned to remain.
Also sidewalks across the low volume driveways need to be continuous at grade, no access
ramps necessary. This would then allow the sidewalk scoring pattern or design to be
continued across the driveways.
Number: 42 Created: 7/29/2004
[7/29/04] The commercial or mixed use building will need to include a bike rack in the
furnishing zone of the sidewalk and street trees are also typically placed in this furnishing
zone next to the curb.
Page 5
(0) Proof of Compliance
(2) If the Director obtains credible information regarding threatened or pending regulatory
enforcement action related to an environmental condition of the property to be developed, or
an environmental impact related to the development plan, then the Director may require the
developer to provide to the city written statements from such governmental agencies as the
Director may designate as having related jurisdiction based on the nature of the threatened
enforcement action or environmental impact. Said statements shall verify that the
development plan fully complies with environmental regulations within the jurisdiction of the
writing agency. If the developer, after a diligent effort, is unable to obtain such written
verifications from one (1) of more of the designated agencies, the developer shall at least
provide to the city a written verification from said agency that the city's approval of the
development plan will not interfere with a threatened or pending environmental enforcement
action of said agency. All required written statements shall be provided to the Director prior
to the scheduling of the hearing for the project development plan.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 35 Created: 7/27/2004
[7/27/04] Light is generally good. There appear to be a couple of walkways toward the
north enc that do not have lighting values - these passageways should be well lit. The fixture
in the parking lot will be affected by the Patmore Ash - suggest relocating light.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 46 Created: 7/29/2004
The off -site conveyance from the site needs to be agreed upon with the City. The
contamination issues below the clay layer is a concern, as previously discussed. A pipe
may not be possible on the City property and a swale might be required. This could have an
impact with site grading. Another meeting may be warranted.
Number: 47 Created: 7/29/2004
The water quality pond should only accept drainage that is being treated for water quality.
The pond does not function properly when other flows drain through it. The water quality
volume should be sized for all impervious area that is draining to it or reroute the flows that
are not being treated.
Number: 49 Created: 7/29/2004
Drainage easements will be required for the outlet conveyance and the water quality pond.
Topic: Erosion/Sediment Control
Number: 48 Created: 7/29/2004
1. Please provide required calculations including PS, EFF, surety.
2. Please place a project schedule on sheet number 7 indicating when BMP's are to be
placed in sequence with the proposed constructions (e.g. overlot grading, pipe installation,
etc.). Use Month 1, 2, 3, not specific months of the year for the timeline.
3. A note on the plan indicates all disturbed areas are to be "seed" with an approved seed
mix and watered until established. It would appear that the only area not covered by
Page 4
Number: 65 Created: 7/27/2004
[7/27/04] On the demolition plan — notes on this plan indicate existing lot lines to be
replated. When and how — no plat was submitted with this project.
Number: 66 Created: 7/27/2004
[7/27/04] On the demolition plan - Need to provide more information than just the note that
services shall be abandoned at the mains. What street or alley do these services come off
of? We need to know to know what street patching if any is required.
Number: 67 Created: 7/27/2004
[7/27/04] How is the property to the west going to take access? With the improvements
you are showing you are cutting off all vehicular access to the property. They currently
appear to have a driveway that is coming off of Willow, but you plans are showing curbing
and parallel parking eliminating this. The improvements you are showing need to
accommodate the access to this lot.
Number: 68 Created: 8/2/2004
Building Doors can not open into the row. Make sure that the area for the doors is inset into
the building to accommodate this.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 6 Created: 7/15/2004
[7/15/04] It appears that two pad type transformers will be required, and there is little or no
space to place them. The developer will need to coordinate the power requirements,
transformer locations, and electric development charges with Light & Power Engineering
(221-6700).
Department: Natural Resources Issue Contact: Doug Moore
Topic: Air Quality
Number: 8 Created: 7/27/2004
[7/27/04] Prior to occupancy, indoor air quality must be measured properly and in
accordance with local, state, and federal health standards to ensure safe public use.
Number: 36 Created: 7/28/2004
[7/28/04] Characterization and proper handling and notification of any contaminated
materials encountered during construction must be made to all applicable local, state and
federal regulatory agency contacts.
Number. 37 Created: 7/28/2004
(7/28/04] Design and construction of sub -slab venting system for any new construction must
be incorporated due to contamination from the former Poudre Valley Gas Company which
may trigger unsafe indoor air quality.
Topic: General
Number: 7 Created: 7/27/2004
[7/27/04] This project will be needed to provide written statement verifying that the
development plan fully complies with environmental regulations.
3.4.1 Natural Habitats and Features
Page 3
Number: 32 Created: 7/27/2004
[7/27/04] Site and landscape plans -Please only show this project on these plans, the
adjacent areas need to be shown as they exist now. These adjacent projects have not been
approved as shown.
Number: 33 Created: 7/27/2004
[7127/04] Landscape plan — some of the trees being shown to be installed are shown off -
site. Will need to provide easements for the landscaping work in these areas.
Number: 56 Created: 7/27/2004
[7/27/04] Alley vacation — Per Ordinance No. 106, 2004 recently adopted by City Council I
need to receive the following in order to start pursuing the vacation. I need a legal
description of the area proposed for vacation in hard copy and electronic format prepared by
a licensed surveyor. I can use the map and letter you have already provided for the
justification. I don't believe a fee has yet been established for this process.
Number: 57 Created: 7/27/2004
[7/27/04] The plans were reviewed to determine if they met the minimum requirements as
identified in Appendix E-4. Please see returned check sheet for items that are needed for
this project to proceed to hearing.
Number: 58 Created: 7/27/2004
[7/27/04] Prior to being able to schedule this project for hearing letters of intent for off -site
easements are needed, all of the easements that will be needed on site and off site need to
be shown on the plans, and preliminary street plan and profile design information for Pine St
and Willow St per the check sheet requirements need to be provided.
Number: 59 Created: 7/27/2004
[7/27/04] Need to provide a design for Willow Street and Pine Street. The design needs to
tie to the end of the existing improvements on Willow west of the property and extend 500
feet east past the property line.
Number: 60 Created: 7/27/2004
[7/27/04] Are you planning on platting or processing all of the easements by separate
document?
Number: 61 Created: 7/27/2004
[7/27/04] No soils report was submitted — please submit soils report.
Number: 62 Created: 7/27/2004
[7/27/04] Need a typical Willow Street cross section — if wishing to do the inset parking you
will need to do two sections, one with the parking and one without the parking.
Number: 63 Created: 7/27/2004
[7/27/04] Where does the curb and gutter end on Willow St west of the project?
Number: 64 Created: 7/27/2004
[7/27/04] On the demolition plan — what is the boundary of this project? Any removal work
out side of the boundary of this project — such as on the Giddings site will require easements
as it is work outside of this projects boundaries. It has to be outside of the project boundary
because they are two different projects and each projects plans need to stand on there own.
Page 2
F�
f,.
STAFF PROJECT REVIEW
City of Fort Collins
LAGUNITAS COMPANIES Date: 8/2/2004
JON PROUTY
3944 JFK PKWY #12E
FT. COLLINS, CO 80525
Staff has reviewed your submittal for WILLOW STREET LOFTS PDP - TYPE II (LUC), and
we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
Number: 23 Created: 7/27/2004
[7/27/04] The flowline of the street for the inset parallel parking needs to follow the curb. No
pan on the outside edge of the pan is allowed at this time.
Number: 24 Created: 7/27/2004
[7/27/04] Will need to identify the driveway widths and locate them (either dimension from
property line or use stationing from street design).
Number: 25 Created: 7/27/2004
[7127/04] Will need to modify the high volume driveway detail to show how the ramp wings
will need to be built to accommodate ADA requirements since the entire area is proposed to
be paved. This is a 1:12 slope maximum.
Number: 26 Created: 7/27/2004
[7/27/04] The driveways need to be shown concrete to the property line.
Number: 27 Created: 7/27/2004
[7/27/04] If you are proposing to build the frontage improvements along the lot to the west
you also need to install the street tree in front of this lot as well.
Number: 28 Created: 7/27/2004
[7/27/04] The driveway off of Willow Street does not meet the driveway spacing requirement
for a high volume driveway and a street intersection (175 feet). Need to submit a variance
for this with justification and it will be reviewed.
Number: 29 Created: 7/27/2004
[7/27/04] Transition in gutter depth needs to occur over at least 5 feet, specify the length of
the transition.
Number: 30 Created: 7/27/2004
[7/27/04] The sidewalk width in front of the head in parking stalls need to be identified. It
will need to be 6.5 feet minimum. (4.5 foot required sidewalk width plus 2 feet for the
parking stall overhang).
Number: 31 Created: 7/27/2004
[7/27/04] Will need to provide the additional details noted on the plans. I will also provide
you with the truncated dome detail once we have one.