HomeMy WebLinkAboutWILLOW STREET LOFTS - PDP - 24-04 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYW
ND
v
d
`o
v
U
Qf
Y
r-rr-r
1n
O
Lm
O
.o -r i•4Yt(e
me
:.t
SITE
LOCATIO
Cherry
Maple
Ave
NE DRIVE
W Moun
in Ave
��
ut
E
E Oak St
a
_
o
CO
01
>
a
o
C
E Olive St
3
w
rn
o
o
o
a
E
Q
N
J�
a
o
cn
cn
cn
Cn
01
E Magnoli
i St
C�
a
0
E Mulberry
St (SHS
)
—'
W Myrt
e St
E Myrtle S
l
E Laurel
E Plum
SCALE: 1 "=1000'
PEDESTRIAN INFLUENCE AREA
n
in
Buckingham St
E Lincoln Ave
0
U o �
a�
° w �
a
Eastdale °
0
Dr U
APPENDIX E
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 6/23/2004
Analysis Time Period: PM
Intersection: Willow / Site Access
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Short Range (2006) Total
Project ID: 0453
East/West Street: Willow
North/South Street: Site Access
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
9 198
233
2
Peak -Hour Factor, PHF
0.85 0.85
0.85
0.85
Hourly Flow Rate, HFR
10 232
274
2
Percent Heavy Vehicles
0 -- --
--
__
Median Type/Storage
Undivided
/
RT Channelized?
Lanes
0 1
1 0
Configuration
LT
TR
Upstream Signal?
No
No
Minor Street: Approach
Northbound
Southbound
Movement
7 8 9
I 10 11
12
L T R
L T
R
Volume 1 7
Peak Hour Factor, PHF 0.85 0.85
Hourly Flow Rate, HFR 1 8
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config LT I I LR
v (vph) 10 9
C (m) (vph) 1299 728
v/c 0.01 0.01
95% queue length 0.02 0.04
Control Delay 7.8 10.0+
LOS A B
Approach Delay 10.0+
Approach LOS B
HCS2000: Unsignalized Intersections Release
4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 6/23/2004
Analysis Time Period: AM
Intersection: Willow / Site Access
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Short Range (2006) Total
Project ID: 0453
East/West Street: Willow
North/South Street: Site Access
Intersection Orientation: EW Study period
(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 4
5 6
L T R L
T R
Volume
4
140
113
1
Peak -Hour Factor, PHF
0.85
0.85
0.85
0.85
Hourly Flow Rate, HFR
4
164
132
1
Percent Heavy Vehicles
0
-- --
--
--
Median Type/Storage
Undivided
/
RT Channelized?
Lanes
0
1
1 0
Configuration
LT
TR
Upstream Signal?
No
No
Minor Street: Approach
Northbound
Southbound
Movement
7
8 9
10
11
12
L
T R
L
T
R
Volume
1
8
Peak Hour Factor, PHF
0.85
0.85
Hourly Flow Rate, HFR
1
9
Percent Heavy Vehicles
0
0
Percent Grade (o)
0
0
Flared Approach: Exists?/Storage
%
No /
Lanes
0
0
Configuration
LR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 10 11 12
Lane Config LT LR
v (vph) 4 10
C(m) (vph) 1464 893
v/c 0.00 0.01
95% queue length 0.01 0.03
Control Delay 7.5 9.1
LOS A A
Approach Delay 9.1
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 6/23/2004
Analysis Time Period: PM
Intersection: Willow / Linden
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Short Range (2006) Total
Project ID: 0453
East/West Street: Willow
North/South Street: Linden
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
43 89
7
11
99
41
Peak -Hour Factor, PHF
0.90 0.90
0.90
0.85 0.85
0.85
Hourly Flow Rate, HFR
47 98
7
12
116
48
Percent Heavy Vehicles
0 --
--
0
Median Type/Storage
Undivided
/
RT Channelized?
Lanes
0 1 0
0 1 0
Configuration
LTR
LTR
Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement
7 8
9
1 10
11
12
L T
R
I L
T
R
Volume 21
Peak Hour Factor, PHF 0.85
Hourly Flow Rate, HFR 24
Percent Heavy Vehicles 0
Percent Grade (o)
Flared Approach: Exists?/Storage
Lanes 0
Configuration
Approach
Movement
Lane Config
106
30
41
95
55
0.85
0.85
0.85
0.85
0.85
124
35
48
Ill
64
0
0
0
0
0
0
0
No
/
No
1 0
0
1
0
LTR
LTR
Delay, Queue Length, and Level of Service
NB SB Westbound Eastbound
1 4 1 7 8 9 1 10 11
LTR LTR I LTR I LTR
12
v (vph)
47
12
_ - 183
223
C(m) (vph)
1427
1499
552
568
v/c
0.03
0.01
0.33
0.39
95o queue length
0.10
0.02
1.44
1.86
Control Delay
7.6
7.4
14.7
15.4
LOS
A
A
B
C
Approach Delay
14.7
15.4
Approach LOS
B
C
HCS2000: Unsignalized Intersections
Release
4.1d
TWO-WAY STOP CONTROL
SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich,
P.E.
Date Performed: 6/23/2004
Analysis Time Period: AM
Intersection: Willow / Linden
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Short Range (2006)
Total
Project ID: 0453
East/West Street: Willow
North/South Street: Linden
Intersection Orientation: NS
Study
period
(hrs):
0.25
Vehicle Volumes and
Adjustments
Major Street: Approach Northbound
Southbound
Movement 1 2
3 1
4
5
6
L T
R I
L
T
R
Volume 27 62
7
8
71
25
Peak -Hour Factor, PHF 0.85 0.85
0.85
0.85
0.85
0.85
Hourly Flow Rate, HFR 31 72
8
9
83
29
Percent Heavy Vehicles 0 --
--
0
--
--
Median Type/Storage Undivided
/
RT Channelized?
Lanes 0 1 0
0
1 0
Configuration LTR
LTR
Upstream Signal? No
No
Minor Street: Approach Westbound
Eastbound
Movement 7 8
9
10
11
12
L T
R
L
T
R
Volume 7 56
10
21
71
25
Peak Hour Factor, PHF 0.94 0.94
0.94
0.88
0.88
0.88
Hourly Flow Rate, HFR 7 59
10
23
80
28
Percent Heavy Vehicles 0 0
0
0
0
0
Percent Grade (%) 0
0
Flared Approach: Exists?/Storage
No /
No %
Lanes 0 1 0
0
1 0
Configuration LTR
LTR
Delay,
Queue
Length, and Level of
Service
Approach
NB
SB
Westbound
Eastbound
Movement
1
4
1 7 8 9
I 10 11 12
Lane Config
LTR
LTR
I LTR
I LTR
v (vph)
31
9
76
131
C(m) (vph)
1490
1531
647
675
v/c
0.02
0.01
0.12
0.19
95% queue length
0.06
0.02
0.40
0.71
Control Delay
7.5
7.4
11.3
11.6
LOS
A
A
B
B
Approach Delay
11.3
11.6
Approach LOS
B
B
I�
HCS2000: Signalized Intersections Release 4.1d
Analyst: JMD Inter.: US287/Willow/Cherry
Agency: Matthew J. Delich Area Type: CBD or Similar
Date: 6/23/2004 Jurisd: Fort Collins
Period: PM Year Short Range (2006) Total
Project ID: 0453
E/W St: Willow/Cherry N/S St: US287
SIGNALIZED INTERSECTION SUMMARY
Eastbound I Westbound I Northbound I Southbound
L T R I L T R I L T R I L T R
No. Lanes
1 2 1 1 I 1 1 0
I 1 2 1
1 1 2 1 1
LGConfig
I L T R I L TR
I L T R
L T R I
Volume
1267 86 94 165 155 65
178 748 52
176 737 182 1
Lane Width
112.0 12.0 12.0 112.0 12.0
112.0 12.0 12.0
112.0 12.0 12.0 1
RTOR Vol
1 0 1 0
1 0
1 0 1
Duration 0.25
Area
Type: CBD or Similar
Signal Operations
Phase Combination
1
2
3 4 1
5
6
EB Left
A
A
1 NB Left
A
P
Thru
A
1 Thru
P
Right
A
1 Right
P
Peds
I Peds
WB Left
A
A
1 SB Left
A
P
Thru
A
1 Thru
P
Right
A
i Right
P
Peds
1 Peds
NB Right
A
1 EB Right
A
SB Right
A
I WB Right
A
Green
10.0
24.0
10.0
38.0
Yellow
3.0
3.0
3.0
3.0
All Red
1.0
2.0
1.0
2.0
Cycle
Length
Intersection
Performance Summary
7 8
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
100.0 secs
Eastbound
L 586
3152
0.50
0.38
22.8
C
T 410
1710
0.23
0.24
30.9
C
23.8
C
R 567
1454
0.18
0.39
20.2
C
Westbound
L 436
1624
0.17
0.38
20.5
C
TR 392
1634
0.66
0.24
38.3
D
34.3
C
Northbound
L 279
1624
0.31
0.52
15.4
B
T 1235
3249
0.67
0.38
28.8
C
26.6
C
R 771
1454
0.08
0.53
11.5
B
Southbound
L 290
1624
0.31
0.52
15.1
B
T 1235
3249
0.70
0.38
29.6
C
25.5
C
R 771
1454
0.28
0.53
13.1
B
Intersection
Delay
= 26.5
(sec/veh)
Intersection
LOS = C
HCS2000: Signalized Intersections Release 4.1d
Analyst: JMD Inter.: US287/Willow/Cherry
Agency: Matthew J. Delich Area Type: CBD or Similar
Date: 6/23/2004 Jurisd: Fort Collins
Period: AM Year : Short Range (2006) Total
Project ID: 0453 Bas Bleu Theatre and Willow Townhomes
E/W St: Willow/Cherry N/S St: US287
No. Lanes
LGConfig
Volume
Lane Width
RTOR Vol
SIGNALIZED INTERSECTION
SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound
I L T R
I
I L T R
I
I L
I
T R
I L T
I
R
I 2 1 1
1 1 1 0
1 1
2 1
1 1 2
1
I L T R
I L TR
L
T R
I L T
R
1133 110 138
134 61 31
153
431 28
131 686
150
112.0 12.0 12.0
112.0 12.0
112.0
12.0 12.0
112.0 12.0
12.0
1 0
1 0
1
0
1
0
Duration 0.25
Phase Combination 1
EB Left P
Thru
Right
Peds
WB Left P
Thru
Right
Peds
NB Right
SB Right
Area
Type: CBD or Similar
Signal Operations
2
3 4 1
P
I NB Left
P
I Thru
P
1 Right
Peds
P
I SB Left
P
I Thru
P
I Right
1 Peds
I EB Right
I WB Right
5 6 7
P P
P
P
P P
P
P
Green
10.0 22.0
10.0
40.0
Yellow
3.0 3.0
3.0
3.0
All Red
1.0 2.0
1.0
2.0
Cycle
Length: 100.0 secs
Intersection Performance
Summary
Appr/ Lane
Adj Sat Ratios
Lane Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s) v/c g/C
Delay LOS
Delay LOS
Eastbound
L
649
T
376
R
320
Westbound
L
399
TR
357
Northbound
3152 0.22 0.36 22.4 C
1710 0.32 0.22 35.0- C 32.0 C
1454 0.47 0.22 39.0 D
1624 0.10 0.36 21.7 C
1624 0.30 0.22 34.8 C 31.2 C
L 313
1624
0.19
T 1300
3249
0.37
R 582
1454
0.05
Southbound
L 442
1624
0.08
T 1300
3249
0.62
R 582
1454
0.30
Intersection
Delay
= 25.7
0.54
14.2
B
0.40
21.9
C 20.9 C
0.40
18.6
B
0.54
11.7
B
0.40
26.2
C 24.9 C
0.40
21.8
C
(sec/veh)
Intersection LOS = C
APPENDIX D
m
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 6/23/2004
Analysis Time Period: PM
Intersection: Willow / Linden
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Short Range (2006) Background
Project ID:
East/West Street: Willow
North/South Street: Linden
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound
Movement 1 2 3 I' 4
L T R I L
Volume
Peak -Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Median Type/Storage
RT Channelized?
Lanes
Configuration
Upstream Signal?
Minor Street: Approach
Movement
Southbound
5 6
T R
42 89 7
11 99
0.90 0.90 0.90
0.85 0.85
46 98 7
12 116
0 -- --
0 --
Undivided
/
0 1 0 0 1
LTR LTR
No No
Westbound Eastbound
7 8 9 1 10 11
L T R I L T
I
0.85
47
12
R
Volume
21
106
30
41
95
54
Peak Hour Factor,
PHF 0.85
0.85
0.85
0.85
0.85
0.85
Hourly Flow Rate,
HFR 24
124
35
48
ill
63
Percent Heavy Vehicles
0
0
0
0
0
0
Percent Grade (o)
0
0
Flared Approach:
Exists?/Storage
No
/
No /
Lanes
0
1
0
0
1
0
Configuration
LTR
LTR
Delay, Queue Length, and Level of Service
Approach
NB
SB
Westbound
Eastbound
Movement
1
4 17
8 9
1 .10 11, 12
Lane Config
LTR
LTR 1
LTR
LTR
v (vph)
46
12
183
222
C(m) (vph)
1428
1499
555
569
v/c
0.03
0.01
0.33
0.39
95% queue length
0.10
0.02
1.43
1.84
Control Delay
7.6
7.4
14.6
15.3
LOS
A
A
B
C
Approach Delay
14.6
15.3
Approach LOS
B
C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich,
P.E.
Date Performed: 6/23/2004
Analysis Time Period: AM
Intersection: Willow / Linden
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Short Range (2006)
Background
Project ID:
East/West Street: Willow
North/South Street: Linden
Intersection Orientation: NS
Study
period
(hrs):
0.25
Vehicle Volumes and
Adjustments
Major Street: Approach Northbound
Southbound
Movement 1 2
3
1 4
5
6
L T
R
I L
T
R
Volume 26 62
7
8
71
25
Peak -Hour Factor, PHF 0.85 0.85
0.85
0.85
0.85
0.85
Hourly Flow Rate, HFR 30 72
8
9
83
29
Percent Heavy Vehicles 0 --
--
0
Median Type/Storage Undivided
/
RT Channelized?
Lanes 0 1 0
0 1 0
Configuration LTR
LTR
Upstream Signal? No
No
Minor Street: Approach Westbound
Eastbound
Movement 7 8
9
1 10
11
12
L T
R
1 L
T
R
Volume 7 56
10
21
71
24
Peak Hour Factor, PHF 0.94 0.94
0.94
0.88 0.88
0.88
Hourly Flow Rate, HFR 7 59
10
23
80
27
Percent Heavy Vehicles 0 0
0
0
0
0
Percent Grade (%) 0
0
Flared Approach: Exists?/Storage
No
/
No
/
Lanes 0 1 0
0 1 0
Configuration LTR
LTR
Delay,
Queue
Length, and Level of
Service
Approach
NB
SB
Westbound
Eastbound
Movement
1
4
1 7 8 9
1 10 11 12
Lane Config
LTR
LTR
1 LTR
1 LTR
v (vph)
30
9
76
130
C(m) (vph)
1490
1531
650
675
v/c
0.02
0.01
0.12
0.19
95% queue length
0.06
0.02
0.40
0.71
Control Delay
7.5
7.4
11.3
11.6
LOS
A
A
B
B
Approach Delay
11.3
11.6
Approach LOS
B
B
HCS2000: Signalized Intersections Release 4.1d
Analyst: JMD Inter.: US287/Willow/Cherry
Agency: Matthew J. Delich Area Type: CBD or Similar
Date: 6/23/2004 Jurisd: Fort Collins
Period: PM Year Short Range (2006) Background
Project ID:
E/W St: Willow/Cherry N/S St: US287
SIGNALIZED INTERSECTION SUMMARY
I Eastbound 1 Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
I I I I I
No. Lanes I 2 1 1 1 1 1 0 I 1 2 1 1 1 2 1 1
LGConfig I L T R I L TR L T R I L T R I
Volume 1267 85 94 161 154 63 178 748 46 174 737 182 1
Lane Width 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 1
RTOR Vol 1 0 1 0 1 0 1 0 1
Duration 0.25
Area
Type: CBD or
Similar
Signal Operations
Phase Combination
1
2
3
4 1
5
6 7 8
EB Left
A
A
NB Left
A
P
Thru
A
I
Thru
P
Right
A
1
Right
P
Peds
1
Peds
WB Left
A
A
I
SB Left
A
P
Thru
A
I
Thru
P
Right
A
1
Right
P
Peds
1
Peds
NB Right
A
I
EB Right
A
SB Right
A
1
WB Right
A
Green
10.0
24.0
10.0
38.0
Yellow
3.0
3.0
3.0
3.0
All Red
1.0
2.0
1.0
2.0
Cycle
Length: 100.0 secs
Intersection
Performance
Summary
Appr/ Lane
Adj
Sat
Ratios
Lane Group
Approach
Lane Group
Flow
Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay LOS
Eastbound
L 585
3152
0.50
0.38
22.8
C
T 410
1710
0.23
0.24
30.8
C
23.8 C
R 567
1454
0.18
0.39
20.2
C
Westbound
L 436
1624
0.17
0.38
20.4
C
TR 393
1636
0.65
0.24
37.9
D
34.1 C
Northbound
L 279
1624
0.31
0.52
15.4
B
T 1235
3249
0.67
0.38
28.8
C
26.7 C
R 771
1454
0.07
0.53
11.5
B
Southbound
L 290
1624
0.30
0.52
15.1
B
T 1235
3249
0.70
0.38
29.6
C
25.5 C
R 771
1454
0.28
0.53
13.1
B
Intersection Delay
= 26.5
(sec/veh)
Intersection
LOS = C
HCS2000: Signalized Intersections Release 4.1d
Analyst: JMD Inter.: US287/Willow/Cherry
Agency: Matthew J. Delich Area Type: CBD or Similar
Date: 6/23/2004 Jurisd: Fort Collins
Period: AM Year Short Range (2006) Background
Project ID:
E/W St: Willow/Cherry NIS St: US287
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound I
I L T R I L T R L T R I L T R 1
I I I I I
No. Lanes 1 2 1 1 1 1 1 0 I 1 2 1 1 1 2 1 I
LGConfig I L T R I L TR I L T R I L T R
Volume 1133 110 138 129 60 29 153 431 25 130 686 150 1
Lane Width 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 1
RTOR Vol 1 0 1 0 1 0 1 0 1
Duration
0.25
Area
Type: CBD or Similar
Signal Operations
Phase Combination
1
2
3 4 1
5
6 7 8
EB Left
P
P
I NB Left
P
P
Thru
P
1 Thru
P
Right
P
1 Right
P
Peds
1 Peds
WB Left
P
P
i SB Left
P
P
Thru
P
Thru
P
Right
P
1 Right
P
Peds
1 Peds
NB Right
1 EB Right
SB Right
1 WB Right
Green
10.0
22.0
10.0
40.0
Yellow
3.0
3.0
3.0
3.0
All Red
1.0
2.0
1.0
2.0
Appr/ Lane
Lane Group
Grp Capacity
Eastbound
L
650
T
376
R
320
Westbound
L
399
TR
358
Northbound
Cycle Length: 100.0
_Intersection Performance Summary
Adj Sat Ratios Lane Group Approach
Flow Rate
(s) v/c g/C Delay LOS Delay LOS
3152 0.22 0.36
1710 0.32 0.22
1454 0.47 0.22
1624 0.09 0.36
1627 0.29 0.22
L 313
1624
0.19
T 1300
3249
0.37
R 582
1454.
0.05
Southbound
L 442
1624
0.08
T 1300
3249
0.62
R 582
1454
0.30
Intersection
Delay
= 25.7
0.54
0.40
0.40
22.4 C
35.0- C
39.0 D
21.5 C
34.6 C
14.2 B
21.9 C
18.5 B
32.0 C
31.4 C
20.9 C
0.54 11.7 B
0.40 26.2 C 24.9 C
0.40 21.8 C
(sec/veh) Intersection LOS = C
secs
APPENDIX C
Table 4-3
Fort Collins (City Limits)
Motor Vehicle LOS Standards (Intersections)
Land Use (from structure plan)
Other corridors within:
Mixed use
Low density
mixed use
All other
Intersection type
Commercial
corridors
districts
residential
areas
Signalized intersections
D
E'
D
D
(overall)
Any Leg
E
E
D
E
Any Movement
E
E
D
E
Stop sign control
N/A
F"
F**
E
(arterial/collector or local —
any approach leg)
Stop sign control
N/A
C
C
C
(collector/local—any
approach leg)
mitigating measures required
" considered normal in an urban environment
UNSIGNALIZED INTERSECTIONS
Leve"f-Service Avcra�ge Total Delay
-cx/vch
A _< 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
HCS2000: Unsignalized Intersections
Release
4.1d
TWO-WAY STOP CONTROL
SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich,
P.E.
Date Performed: 6/23/2004
Analysis Time Period: PM
Intersection: Willow / Linden
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Recent
Project ID:
East/West Street: Willow
North/South Street: Linden
Intersection Orientation: NS
Study
period
(hrs):
0.25
Vehicle Volumes and
Adjustments
Major Street: Approach Northbound
Southbound
Movement 1 2
3 1
4
5
6
L T
R I
L
T
R
Volume 40 86
7
11
95
38
Peak -Hour Factor, PHF 0.90 0.90
0.90
0.85
0.85
0.85
Hourly Flow Rate, HFR 44 95
7
12
ill
44
Percent Heavy Vehicles 0 --
--
0
--
--
Median Type/Storage Undivided
/
RT Channelized?
Lanes 0 1 0
0
1 0
Configuration LTR
LTR
Upstream Signal? No
No
Minor Street: Approach Westbound
Eastbound
Movement 7 8
9 1
10
11
12
L T
R
L
T
R
Volume 20 102
29
39
91
52
Peak Hour Factor, PHF 0.85 0.85
0.85
0.85
0.85
0.85
Hourly Flow Rate, HFR 23 119
34
45
107
61
Percent Heavy Vehicles 0 0
0
0
0
0
Percent Grade (o) 0
0
Flared Approach: Exists?/Storage
No /
No /
Lanes 0 1 0
0
1 0
Configuration LTR
LTR
Delay,
Queue
Length, and Level of
Service
Approach
NB
SB
Westbound
Eastbound
Movement
1
4
7 8 9
1 10 11 12
Lane Config
LTR
LTR
LTR
LTR
v (vph)
44
12
176
213
C(m) (vph)
1438
1503
568
584
v/c
0.03
0.01
0.31
0.36
95% queue length
0.09
0.02
1.31
1.66
Control Delay
7.6
7.4
14.2
14.7
LOS
A
A
B
B
Approach Delay
14.2
14.7
Approach LOS
B
B
HCS2000: Unsignalized Intersections
Release
4.1d
TWO-WAY STOP CONTROL
SUMMARY
Analyst: JMD
Agency/Co.: Matthew J. Delich,
P.E.
Date Performed: 6/23/2004
Analysis Time Period: AM
Intersection: Willow / Linden
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: Recent
Project ID:
East/West Street: Willow
North/South Street: Linden
Intersection Orientation: NS
Study
period
(hrs):
0.25
Vehicle Volumes and
Adjustments
Major Street: Approach Northbound
Southbound
Movement 1 2
3 1
4
5
6
L T
R 1
L
T
R
Volume 25 60
7
8
69
24
Peak -Hour Factor, PHF 0.85 0.85
0.85
0.85
0.85
0.85
Hourly Flow Rate, HFR 29 70
8
9
81
28
Percent Heavy Vehicles 0 --
--
0
--
--
Median Type/Storage Undivided
/
RT Channelized?
Lanes 0 1 0
0
1 0
Configuration LTR
LTR
Upstream Signal? No
No
Minor Street: Approach Westbound
Eastbound
Movement 7 8
9 1
10
11
12
L T
R I
L
T
R
Volume 7 54
10
20
68
23
Peak Hour Factor, PHF 0.94 0.94
0.94
0.88
0.88
0.88
Hourly Flow Rate, HFR 7 57
10
22
77
26
Percent Heavy Vehicles 0 0
0
0
0
0
Percent Grade M 0
0
Flared Approach: Exists'?/Storage
No %
No /
Lanes 0 1 0
0
1 0
Configuration LTR
LTR
Approach
Movement
Lane Config
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service
NB
SB
Westbound
Eastbound
1
4 1
7 8 9
1 10 11 12
LTR
LTR I
LTR
I LTR
29
9
74
125
1494
1533
658
683
0.02
0.01
0.11
0.18
0.06
0.02
0.38
0.67
7.5
7.4
11.2
11.4
A
A
B
B
11.2
11.4
B
B
HCS2000: Signalized Intersections Release 4.1d
Analyst: JMD Inter.: US287/Willow/Cherry
Agency: Matthew J. Delich Area Ty
pe: CBD or Similar
Date: 6/23/2004 Jurisd: Fort Collins
Period: PM Year Recent
Project ID:
E/W St: Willow/Cherry NIS St: US287
SIGNALIZED INTERSECTION
SUMMARY
I Eastbound I Westbound
I Northbound
I Southbound
I L T R I L T R
I I
I L
I
T R
I L T
I
R
No. Lanes
1 2 1 1 1 1 1 0
1 1
2 1
1 1 2
1
LGConfig
I L T R I L TR
I L
T R
I L T
R
Volume
1257 82 90 159 148 61
175
719 44
171 708
175
Lane Width
112.0 12.0 12.0 112.0 12.0
112.0
12.0 12.0
112.0 12.0
12.0
RTOR Vol
1 0 1 0
1
0
1
0
Duration
0.25
Area Type: CBD
or Similar
Signal
Operations
Phase Combination 1
2 3 4
1
5
6 7 £
EB Left
A
A
1 NB Left
A
P
Thru
A
I Thru
P
Right
A
1 Right
P
Peds
1 Peds
WB Left
A
A
1 SB Left
A
P
Thru
A
1 Thru
P
Right
A
1 Right
P
Peds
1 Peds
NB Right
A
1 EB Right
A
SB Right
A
1 WB Right
A
Green
10.0
24.0
10.0
38.0
Yellow
3.0
3.0
3.0
3.0
All Red
1.0
2.0
1 0
2 0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 581
T 410
R 567
Westbound
L 437
TR 392
Northbound
3152
0.49
0.38
22.6 C
1710
0.22
0.24
30.8 C
1454
0.17
0.39
20.1 C
1624
0.16
0.38
20.4 C
1635
0.63
0.24
37.2 D
L 289
1624
0.29
T 1235
3249
0.65
R 771
1454
0.06
Southbound
L 300
1624
0.28
T 1235
3249
0.67
R 771
1454
0.27
Intersection
Delay
= 26.0
0.52 15.0 B
0.38 28.1 C
0.53 11.5 B
23.6 C
33.5 C
26.1 C
0.52 14.7 B
0.38 28.8 C 24.9 C
0.53 13.1 B
(sec/veh) Intersection LOS = C
L
HCS2000: Signalized Intersections Release 4.1d
Analyst:
JMD
Inter.:
US287/Willow/Cherry
Agency:
Matthew J. Delich
Area Type: CBD or Similar
Date:
6/23/2004
Jurisd:
Fort Collins
Period:
AM
Year
Recent
Project
ID:
E/W St:
Willow/Cherry
N/S St:
US287
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound I
I L T R
I
I L T R
I
I L T
I
R
I L T
I
R 1
I
No. Lanes
1 2 1 1
1 1 1 0
( 1 2
1
1 1 2
1 1
LGConfig
I L T R
I L TR
L T
R
I L T
R
Volume
1128 106 133
128 58 28
151 414
24
129 659
144 1
Lane Width
112.0 12.0 12.0
112.0 12.0
112.0 12.0
12.0
112.0 12.0
12.0 1
RTOR Vol
1 0
1 0
1
0
1
0 1
Duration 0.25
Phase Combination 1
EB Left A
Thru
Right
Peds
WB Left A
Thru
Right
Peds
Area
Type: CBD
or Similar
Signal
Operations
2
3 4
1 5 6
A
1 NB Left A P
A
1 Thru P
A
1 Right P
I Peds
A
SB Left A P
A
I Thru P
A
I Right P
I Peds
7 8
NB Right
A
1 EB
Right
A
SB Right
A
1 WB
Right
A
Green
10.0 22.0
10.0
40.0
Yellow
3.0 3.0
3.0
3.0
All Red
1.0 2.0
1.0
2.0
Cycle
Length: 100.0 secs
Intersection
Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
V/c
g/C
Delay
LOS
Delay LOS
Eastbound
-
L 653
3152
0.22
0.36
21.7
C
T 376
1710
0.31
0.22
33.1
C
25.2 C
R 538
1454
0.27
0.37
22.3
C
Westbound
L 403
1624
0.08
0.36
21.1
C
TR 358
1626
0.28
0.22
32.9
C
30.0 C
Northbound
L 324
1624
0.18
0.54
12.9
B
T 1300
3249
0.35
0.40
21.7
C
20.2 C
R 800
1454
0.03
0.55
10.3
B
Southbound
L 451
1624
0.08
0.54
11.3
B
T 1300
3249
0.60
0.40
25.7
C
22.7 C
R 800
1454
0.21
0.55
11.6
B
Intersection Delay
= 23.0
(sec/veh)
Intersection
LOS = C
. A
APPENDIX B
3
w w
d >
_ W o
U o o N
O
Q Q ULU
m
Z m
Z QQ
= 0 W c
F N >O O
Q N J a
m N
N
y�
L M
0 •o
U L)
W {Lp
J 2 ioi
C)
d 0
WUj
m
m N
Li- O c
0
ca
Q O y
J
to
LU
`a
r Q
c
d
v
C
J
0
0
it w J
H
N d
.o
d
N
e
LO
LOofr
M
t
F-
0
C
O
N
M
N
M
N
rn
r�
qqr
qCr
N
d
J
M
N
+d-•
70
M
M=
M-=
N
A-
N
c
O
O
cD
m
M
LO
ooc0
co
co
cc
wco
F-j
co
co
N
H
12 �
�
N
O
M
d•
A
V
O
C
C
3
S
L
N
M
3
F
C
7
L
LF-i
co
O
t�
0
Z
co
c0
co
Cl)
d c
F m
A
A
c0
OO
�
^
O
ti
M
lVf-
Q
tea-
V
LO
(D
O
M
N
N
N
LO
Lr)
O
EVI=
N
Cr)
O
M
N
N
07
N
00
U')
o
LO
rn
O
t0
•a
ti
N
Q)
e-
to
M
M
-A.__
C7=
N
Y7.
N=
rN=
O
O
N
(D
N
N
00
M
N
to
N
M=
�
O
N
N
M
co
�
M
N
M
D
N
O
M
W
O
U')
v/
Z
N
C
O
o'
U
v
�'
s
J
-'
li
U
3
ui
:_
d
E
o
_
W
N
V_
C)
N O
CDN
�
N
.a
W
Z
W
00
O
LL.
.0
O
00
�Q"`�
O
3
h
LLI
-jg�
a
O
Q
r
J m
p
T
l6
�
41
Q
O.
H
C
J
�
�
s
M
W
r
T
cc
0
c Q
-u�
oppo
=rtp
ao=
FO— cc
a+
t0
O
M
C
N
Co
is
�
_
u->
c0
M
R
C
7
O
Gf
J
ao
cD
�
v
N
IQ—�
C
7
co
c0
co
W
N
C7)
N
m
N
N
J
N
ch
N
c)
w
O H
CD
M
co
M
co
O
F
Ic
t
N
SOON`
O
C
7
L
L
Nco
M
to
M
N
IA')
O
N
cD
m
w
qq7
LO
O
W
c0
w
m
�}
C
M
c0
m
c0
7
O
O
ZFj
(O
ap
M
V
N C
E w
h m
in
e`
it
f.-
co
00
rITINIco
W LO r �p
`oI^ILoIm
MINIINI M
I--INI—�ir°
C.0I`�ImIN
�co i�l�l�
co 1— M
N N O M
co com c�0
V co co
N
vlvl�iilvi
'Z.
APPENDIX A
Ch
AM/PM
A&
N
SHORT RANGE (2006) GEOMETRY Figure 8
TABLE 4
Short Range (2006) Total Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
US287/Willow/Cherry
(signal)
EB LT
C
C
EB T
C
C
EB RT
D
C
WB LT
C
C
WB T/RT
C
D
NB LT
B
B
NB T
C
C
NB RT
B
B
SB LT
B
B
SB T
C
C
SB RT
C
B
OVERALL
C
C
Willow/Linden
(stop sign)
NB LT/T/RT
A
A
SB LT/T/RT
A
A
WB LT/T/RT
B
B
EB LT/T/RT
B
C
Willow/Site Access
(stop sign)
EB LTrr
A
A
SB LT/RT
A
B
N Il
c0 M
Lo c
31 /65
J� CO °' 61/155
St f 34/65
133/267 ^\�
110/86 — f 710, 4,9
co c0 N 798
138/94 M1,� 7'��a
�n N
v
AM/PM
SHORT RANGE (2006) TOTAL
PEAK HOUR TRAFFIC
N
C�-
Figure 7
TABLE 3
Short Range (2006) Background Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
US287/Willow/Cherry
(signal)
EB LT
C
C
EB T
C
C
EB RT
D
C
WB LT
C
C
WB T/RT
C
D
NB LT
B
B
NB T
C
C
NB RT
B
B
SB LT
B
B
SB T
C
C
SB RT
C
B
OVERALL
C
C
Willow/Linden
(stop sign)
NB LT/T/RT
A
A
SB LT/T/RT
A
A
WB LTMRT
B
B
EB LT/T/RT
B
C
N !-
00 n V
29/63
Lo00o
`° °' 60/154
St i � 29/61
133/267
110/85 o arc
138/94 � �// h�� ��
M
Lo N 04, � ^�\
CQ
r
cn
��ss o��o
2y/S 9S �i2r rob
U
AM/PM
SHORT RANGE (2006) BACKGROUND
PEAK HOUR TRAFFIC
41161
N
Figure 6
Pei
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC
N
'flohl
st
Figure 5
Che
U
AM/PM
TRIP DISTRIBUTION
A
N
Figure 4
r
SCALE 1'=60"
A&
N
a
SITE PLAN Figure 3
t I I
TABLE I
Current (2004) Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
US287fWillow/Cherry
(signal)
EB LT
C
C
EBT
C
C
EB RT
C
C
WB LT
C
C
WB T/RT
C
D
NB LT
B
B
NB
C
C
NB RT
B
B
SB LT
B
B
SBT
C
C
SB RT
B
B
OVERALL
C
C
Willow/Linden
(stop sign)
NB LT/T/RT
A
A
S8 LTfTfRT
A
A
WB LTfT/RT
B
B
EB LT/T/RT
B
B
TABLE 2
Trip Generation
Code
.
`Use
AWDTE
aW.HouIr
ur
P WP41ak H`161-
f2ate
:Tripe ,Rate
In
Rate
Out
Rile
In.
- Rate
Outs.
441
Live Theater
150 Seats
.01
2
.01
2
710
General Office
6 employ.
3.32
20
0.42
3
0.06
0
0.08
1
0.38
2
230
Townhome
23 D.U.
5.86
135
0.07
2
0.37
9
0.35
8
0.17
4
Total
155
5
9
11
8
Loco
11-
O
Nrto0)
CO
N
St
128/257 —�
106/82 —�
133/90
28/61
58/148
28/59
AM/PM
RECENT PEAK HOUR TRAFFIC
A&
N
c;-
Figure 2
SITE
LOCATIO
Cherry
Maple
La POrtd Ave
NE DRIVE
Linden
enter
Dr
h
iL
W Mounloin
Ave
E
00
E Oak St
ul
o
e
a
E Olive St
.mac
3
0
0.E
a
w
N �o
o
S
0
0
U
a_
E Magnoli
St
N
N
O
E Mulberry
St (SH1
W Myrt
e St
I
E Myrtle S
E Laurel
E Plum
SCALE: 1 "=1000'
SITE LOCATION
in
Eastdole
Dr .
Buckingham St
E Lincoln Ave
oI -o I� JIo
Figure 1
This area of Fort Collins is within 0.25 miles transit Routes 1, 5,
8, 14 and 15. It is within 0.25 miles of the Downtown Transit Center.
Since this is an intermediate transportation impact study, the long range
transit system or level of service is not relevant. Transit level of
service will be the same as that which currently exists.
It is concluded that, with the Bas Bleu Theatre and Willow Townhomes
Project, the future level of service at the key intersections will be
acceptable. The level of service for bicycle and transit modes will be
acceptable. The minimum pedestrian level of service cannot be achieved
without significant improvements. This project cannot be expected to
build sidewalks throughout Old Town Fort Collins where they do not
currently exist.
the site. Trip Generation, 7ch Edition, ITE was used as a reference in
calculating the trip generation. Table 2 shows the trip generation for
the Bas Bleu Theatre Project.
The trip distribution for this site is shown in Figure 4. The trip
distribution was determined using the existing traffic counts, knowledge
of the existing and planned street system, development trends, and
engineering judgment. Figure 5 shows the site generated traffic
assignment of the Bas Bleu Theatre Project.
Figure 6 shows the short range (2006) background peak hour traffic
at the key intersections. Background traffic volume forecasts for the
short range (2006) future were obtained by reviewing historic counts in
the area. Compared to January 2002 peak hour counts at the
College/Willow/Cherry intersection, the June 2004 peak hour counts were
generally lower. However, in order to show an increase in traffic, the
June 2004 traffic at the key intersections was increased at the rate of 2
percent per year to the year 2006. Table 3 shows the short range (2006)
background peak hour operation at the key intersections. Calculation
forms are provided in Appendix C. The key intersections will operate
acceptably with existing control and geometry.
Figure 7 shows the short range (2006) total peak hour traffic at the
key intersections. Table 4 shows the short range (2006) total peak hour
operation at the key intersections. Calculation forms are provided in
Appendix D. The key intersections will operate acceptably during the
peak hours. Figure 8 shows the short range (2006) geometry at the key
intersections. This is the existing geometry at the two existing
intersections.
Willow Street is classified as a collector street on the Fort
Collins Master Street Plan. The turning volumes do not require either a
left -turn lane or a right -turn lane at the Willow Street access. The
posted speed limit on Willow is 25 MPH.
The Bas Bleu Theatre and Willow Townhomes Project site is the area
within which the City requires pedestrian and bicycle level of service
evaluations. Appendix E shows a map of the area that is within 1320 feet
of the Bas Bleu Theatre and Willow Townhomes Project site. There will be
three pedestrian destinations within a quarter mile of the project site.
These are: 1) the recreation trail east of the site (Poudre River Trail);
2) the commercial south of the site (Old Town Fort Collins); 3) the
recreation area north (adjacent) of the site. This site is in area type
termed "pedestrian district." The minimum level of service for these
area types is A for all measured categories, except for street crossings
which is B. As indicated on the Pedestrian LOS Worksheet, the minimum
level of service cannot be achieved. This project will add sidewalk
along their site frontage. The Pedestrian LOS worksheet is provided in
Appendix E.
Based upon Fort Collins bicycle LOS criteria, there is one
destination areas within 1320 feet of the Bas Bleu Theatre and Willow
Townhomes Project site. This is the Poudre River Trail east of the site.
There are bike lanes on Willow Street and on Linden Street, which would
place the bicycle connectivity at level of service B. The bicycle LOS
worksheet is provided in Appendix E.
MEMORANDUM RE
co
LO
C
Companies 0`4'�� !�`t
TO: Kaye Vincent, es
o
Cathy Mathis, VF Ripley Associates Usk 15� 5'4
a,
City of Fort Collins
o
0
o
FROM: Matt Delich cam'• �G
ASS,+A1
o
U
r
°'
DATE: June 28, 2004
•
X
Q
Z
SUBJECT: Bas Bleu Theatre and Willow Townhomes Project
z
w
transportation analyses
J
(File: 0453ME01)
•
(p
w
>_
C)
N
This memorandum addresses the transportation impacts of the
Cr
p
rn
cD
proposed Bas Bleu Theatre and Willow Townhomes Project. This
-----W
project is proposed to be located along Willow Street, just north of
Q
o
r
Pine Street in Fort Collins. The site location is shown in Figure
1. Currently, there is the Giddings Machine Shop on this lot. The
J
Z
Bas Bleu Theatre and Willow Townhomes Project will consist of a 150
(D
°
seat theatre with an office and 23 townhome dwelling units. The
N
theatre will open with 100 seats and then expand to 150 seats in a
few years depending on funding. For simplicity, the theatre was
N
assumed to have the full 150 seats for this study. The scope of
this study was discussed with the Fort Collins Traffic Operations
Engineer. A brief memorandum was requested. There are no sidewalks
along Willow Street and Linden Street, except for on the north side
of Willow for approximately 480 feet east of College Avenue. There
are sidewalks along both sides of College Ave (US287). There are no
bike lanes on College Ave (US287). There are bike lanes on Linden
Street and on Willow Street.
The hours of operation for the theatre portion of the site are
assumed to be after the afternoon peak hour (i.e. 6:30PM-11:OOPM).
Uj
It is assumed that the theatre patrons will use existing parking in
surrounding areas. This includes the two city parking garages
athe
z
and/or on street parking.
w
3^
Z
Figure 2 shows recent peak hour traffic counts at the
()
-0
US287/Willow/ Cherry and Willow/Linden intersections. The count
W
data was obtained in June 2004. Raw traffic data is provided in
o
Appendix A. Table 1 shows the current peak hour operation of the
®F
key intersections. Calculation forms are. provided in Appendix B. A
description of level of service for signalized and unsignalized
cc
o
intersections from the 2000 Highway Capacity Manual and a table
ran
showing the Fort Collins Motor Vehicle LOS Standards (Intersections)
are also provided in Appendix B. The key intersections operate
H
acceptably during the peak hours.
W
Ca
_
L)
Figure 3 shows the site plan for the Bas Bleu Theatre and
aWillow
Townhomes Project. This project is proposed as a 150 seat
theatre with a small office and 23 townhome dwelling units. Current
Q
H
access to the site is via a driveway to Willow Street and a driveway
access to Pine Street. These will continue to be the accesses to