Loading...
HomeMy WebLinkAboutWILLOW STREET LOFTS - PDP - 24-04 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWaccess, and a formal application for vacation of same is in process. The alley will be reconfigured as part of the project as a public walkway connecting from Pine Street to the new Aztlan Center, as well as a privately maintained (at the project's HOA expense) landscape buffer strip between the United Way parking lot and the walkway. 8. Natural Resources — No significant trees will be removed. Other comments will be complied with. 9. Parks and Recreation — We are in agreement with and will comply with comment. 10. Current Planning —We agree and will be in compliance with comments. However, a neighborhood meeting, at Planning's discretion, may not be necessary. 11.Advanced Planning — Not applicable. This comment applies only to the Giddings Building, which in fact has been designated as a Local Landmark. Best regards. �) PVPI--- Jon Prouty J P/ks r July 8, 2004 Bob Barkeen City of Fort Collins - Current Planning 281 N. College Fort Collins, CO 80522 Re: Willow Loft Project/Response to Conceptual Review Comments Dear Bob: The conceptual review for the Willow Lofts Project occurred in conjunction with conceptual review for the Giddings Building Renovation. Only the comments related to the Willow Project, which is a separate project, will be addressed here. 1. Zoning — Multi -family Residential and Commercial/Retail uses are permitted in the RDR District, subject to administrative review. 2. Light and Power — We agree and will be in compliance with all comments 3. Poudre Fire Authority— All buildings will be fire sprinklered. We will be in compliance with all comments. 4. Water/Wastewater— We are in agreement and will be in compliance with all comments. 5. Engineering — A traffic study has been submitted. Willow frontage will be improved to meet the requirements of its final assigned or this obligation may be deferred to coordinate with other Willow Street improvements. All other comments will be complied with. 6. Storm Drainage — We are in agreement with Stormwater's comment that we convey storm runoff directly into the Poudre River by piping it under the United Way parking lot and then running it through a grassy swale to the river, with the approval of the Parks Department and the new Aztlan Center construction team. 7. Transportation Planning — No off -site or shared parking is planned. Alley vacation has been discussed with various City departments for the alley along the north side of the project which is no longer necessary for utilities or 3944 JFK Parkway, Fort Collins. CO 80525 - (970) 226-5000 • Fax (970) 226-5125