Loading...
HomeMy WebLinkAboutTIMNATH TAP - PDP - 21-04 - REPORTS - RECOMMENDATION/REPORTTimnath Tap, PDP - #21-04 September 15, 2004 Administrative Hearing Page 4 The proposal complies with the applicable design standards, requirements, and specifications for the services as set forth in this section. The property is not being platted with this development request. B. Division 3.5, Building Standards One new 1-story control building is being proposed, containing a total of 960 square feet of floor area. The building footprint will be 24'-0" x 40'-0", oriented west to east. Total height for the building would be 14'-6" at the top of the peak of the roof, running west to east. The primary building material is to be interlocking, 16" wide metal panels painted desert tan. Roofing material is to be 16" wide standing seam metal panels. FINDINGS OF FACT/CONCLUSIONS After reviewing the Timnath Tap, PDP, staff makes the following findings of fact and conclusions: 1. The proposed land use is permitted in the I — Industrial Zoning District. 2. The Project Development Plan complies with all applicable district standards of Section 4.23 of the Land Use Code, I — Industrial Zoning District. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. 4. City staff has reviewed only that portion of the property that is within the City of Fort Collins limits. The remainder of the property is not being required to be annexed at this time. RECOMMENDATION: Staff recommends approval of the Timnath Tap, Project Development Plan - #21-04, being that portion of the Timnath Switch Station property that is within the limits of the City of Fort Collins. Timnath Tap, PDP - #21-04 September 15, 2004 Administrative Hearing Page 3 The property has not been platted in the City of Fort Collins. 2. Project Description The existing electric power generation and transmission facility located east of the East Frontage Road along Interstate 25 and north of East Vine Drive. It is accessed from the Frontage Road by an existing dirt drive that runs along the north side of the Larimer and Weld Canal. This is a request for an expansion of an existing electric power generation and transmission facility located east of the East Frontage Road along Interstate 25 and north of East Vine Drive. The owner and operator of the property and facility (Tri-State Generation & Transmission Association) proposes to expand the existing Timnath Switch Station from 1.0 to 2.0 acres in size, replace the existing control building, and install a 115 kV circuit breaker and additional towers. The improvements will be done in 2 stages. The portions of the property that are within the limits of the City of Fort Collins are to the west of the existing facility (dimensions of 110' x 325') and to the south of the existing facility (dimensions of 50' x 158'). These 2 parcels are about 1 acre in size and will contain the new control building and new transmission line towers. The area will be enclosed by a new chain link fence 7' in height. 3. Division 4.23 of the Land Use Code — Industrial District The proposed expansion of an existing public facility (an electric power generation and transmission station) is permitted in the I - Industrial Zoning District subject to an administrative review. The PDP meets the applicable Land Use Standards and Development Standards in the Industrial District . 4. Article 3 of the Land Use Code — General Development Standards The PDP complies with all applicable General Development Standards, more specifically as follows: A. Division 3.3, Engineering Standards 1. Section 3.3.5, Engineering Design Standards Timnath Tap, PDP - #21-04 September 15, 2004 Administrative Hearing Page 2 • the standards located in Division 3.5 - Building Standards of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; and, • the standards located in Division 4.23 Industrial (1) of ARTICLE 4 — DISTRICTS. Public facilities are permitted in the I — Industrial Zoning District, subject to an administrative (Type 1) review. The purpose of the Industrial District is: "To provide a location for a variety of work processes and work places such as manufacturing, warehousing and distributing, indoor and outdoor storage, and a wide range of commercial and industrial operations. The Industrial District also accommodates complementary and supporting uses such as convenience shopping, child care centers and housing. While these Districts will be linked to the City's transportation system for multiple modes of travel, some may emphasize efficient commercial trucking and rail traffic as needed. Industrial and manufacturing processes used in this District may, by necessity, be characteristically incompatible with residential uses." This proposal complies with the purpose of the I - Industrial District as it proposes an expansion of an existing electric utility (a public facility) on property in the middle of agricultural lands. The property is in both the City of Fort Collins and Larimer County. City staff is reviewing only that portion of the property that is within the City of Fort Collins limits. COMMENTS: Background The surrounding zoning and land uses are as follows: N: I - Industrial in the City of Fort Collins; existing agriculture S: I - Industrial in the City of Fort Collins; existing agriculture E: FA1 - Farming in Larimer County; existing agriculture W: I - Industrial in the City of Fort Collins; existing agriculture The portion of the subject property within the limits of the City of Fort Collins was annexed into the City in August, 1988 as part of the Buckeye Farms, Inc. and Harold D. Einarsen Annexation. ITEM NO. MEETING DATE Q v5 E7 STAFF_ _a J� Dt t Citv of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: Timnath Tap, Project Development Plan - #21-04 APPLICANT: Tri-State Generation & Transmission Association, Inc. c/o Jerome Bensing 1100 West 116th Avenue Westminster Collins, CO. 80234 OWNER: Tri-State Generation & Transmission Association, Inc. 1100 West 116th Avenue Westminster, CO. 80234 PROJECT DESCRIPTION: This is a request for an expansion of an existing electric power generation and transmission facility located east of the East Frontage Road along Interstate 25 and north of East Vine Drive. The owner and operator of the property and facility (Tri-State Generation & Transmission Association) proposes to expand the existing Timnath Switch Station from 1.0 to 2.0 acres in size, replace the existing control building, and install a 115 kV circuit breaker and additional towers. The improvements will occur in 2 stages. The property is in both the City of Fort Collins and Larimer County. City staff is reviewing only that portion of the property that is within the City of Fort Collins limits, which is in the I - Industrial Zoning District. The remainder of the property is not being required to be annexed at this time. RECOMMENDATION: Approval EXECUTIVE SUMMARY: This Project Development Plan (PDP) complies with the following applicable requirements of the Land Use Code L( UC): • the process located in Division 2.2 - Common Development Review Procedures for Development Applications of ARTICLE 2 - ADMINISTRATION; • the standards located in Division 3.3 — Engineering Standards of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT