Loading...
HomeMy WebLinkAboutHOME INSTEAD PLAZA - PDP/FDP - FDP130042 - REPORTS - TRAFFIC STUDY0 I. INTRODUCTION Q This intermediate transportation impact study (MS) addresses ,the capacity, geometric, and control requirements at and near the proposed Home Instead development. The proposed Home Instead site is located in the southeast quadrant of the QJFK/Boardwalk intersection in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project developer (Doberstein Lemburg Commercial), the Fort Collins Traffic Engineering staff, and the Fort Collins Transportation Planning staff. This study generally conforms to the format set forth in the Fort Collins transportation impact study guidelines contained in the "Larimer County Urban Area Street Standards" (LCUASS). A Base Assumptions Form and related information are provided in Appendix A. The study involved the following steps: • Collect physical, traffic, and development data; • Perform trip generation, trip distribution, and trip assignment; Q• Determine peak hour traffic volumes; • Conduct capacity and operational level of service analyses on key intersections; • Analyze signal warrants; • Roundabout analysis; • Conduct level of service evaluation of pedestrian, bicycle, and transit modes of Qtransportation. IM O=�,11'L-DELICH Home Instead TIS, May 2014 -71irASSOCIATES Page 1 D123 M 122 u lJ LIST OF TABLES Q1. Current Peak Hour Operation......................................................... ...................... g 2. Trip Generation........................................................................................................ 9 3. Short Range (2018) Background Peak Hour Operation .......................................... 16 4. Short Range (2018) Total Peak Hour Operation..................................................... 18 LIST OF FIGURES p 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Site Location..................................................................... Existing Intersection Geometry ........................................... ... ................................... Recent Peak Hour Traffic... Balanced Recent Peak Hour Traffic ...............................:........ ............................... Site Plan.................................................................................................................. Trip Distribution....................................................................................................... Short Range (2018) Background Peak Hour Traffic ................................................ Site Generated Peak Hour Traffic........................................................................... Short Range (2018) Total Peak Hour Traffic ........................................................... ...................... Short Range (2018) Geometry ....................................... !.. 4 6 7 10 11 13 14 15 19 APPENDICES A. Base Assumptions Form QB. Recent Peak Hour Traffic C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS Standards D. Short Range (2018) Background Peak Hour Operation E. Short Range (2018) Total Peak Hour Operation F. Pedestrian/Bicycle Level of Service I ��L- _DELICH Home instead TiS, May 2014 T—ASSOCIATES Q121 120 0 I TABLE OF CONTENTS DI. INTRODUCTION.................................................................................... ................. 1 Q II. EXISTING CONDITIONS....................................................................................... Land Use...:....... Roads............................................................................................. 2 2 2 QExisting ExistingTraffic................................................................................................................ Operation.......................................•--...----........................................................... PedestriansFacilities...................................................................................................... BicycleFacilities..............................................................................:............................... Transit Facilities...... 5 5 8 8- 8 III. PROPOSED DEVELOPMENT....................:....................................... ................. 9 TripGeneration............................................................................................................... 9 TripDistribution............................................................................................................... 9 Background Traffic Projections ...................................... :.............................................. 12 TripAssignment..................................................................:......................................... 12 SignalWarrants............................................................................................................ 12 OperationAnalysis....................................................................................................... 12 RoundaboutAnalysis....................................................................................................17 Geometry...................................................................................................................... 17 Pedestrian Level of Service.......................................................................................... Bicycle Level of Service................................................................................................ TransitLevel of Service ................................................................................................. 20 20 20 aIV. CONCLUSIONS/RECOMMENDATIONS................. .............................................. 21 Ef Lill �r .DELICH Home Instead TIS, May 2014 7y,4r—ASSOCIATES 119 118 HOME INSTEAD TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2014 Prepared for: Doberstein Lemburg Commercial, Inc. 1401 Riverside Avenue Fort Collins, CO 80524 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Er,,,? ... FAX: 970-669-5034`. {0 1 11 Project #1359 117