Loading...
HomeMy WebLinkAboutHOME INSTEAD PLAZA - PDP/FDP - FDP130042 - CORRESPONDENCE -Comment Number: ; Comment Originated: 11/05/2013 06/10/2014: Please add a note to the plans. 11/05/2013: All building -mounted and pole -mounted lighting needs to be down directional and shielded. Add a note to the plans. Comment Number: 6 Comment Originated: 11105/2013 O6/10/2014: Please provide drawings of the enclosed bicycle parking. 11105/2013: How will you achieve the 20% required enclosed bicycle parking? Note these enclosed spaces on the site plan. Page 9 of 9 Comment Number. s Comment Originated: 06/11/2014 06/11/2014: Internal vehicular circulation may be problematic. Traffic is concerned that people will not realize they have to use the mail drop lane to access this site and instead will drive through the post office parking aisle and then try to wrong way drive in the mail drop lane to get to the access location. Topic: Traffic Impact Study Comment Number. 9 Comment Originated: 06/11/2014 06/11/2014: The City will support a variance to the LCUASS standards for LOS at the Landings / Boardwalk intersection. Please contact me in traffic to refine the justification in the variance letter. Contact: Ward Stanford, 970.221.6820, wstanford(cDfcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 11/05/2013 11/05/2013: Please add an R3-2 (No Left Turn) sign back to back with an R5-1 (Do Not Enter) sign at the SE comer of the Boardwalk RI/Ro median (porkchop). The R3-2 should face exiting traffic and the R5-1 should face the SE bound traffic. Comment Number: 2 Comment Originated: 11/05/2013 11/05/2013: Please add R1-2 (Yield) Signs at the comers of the "tee" intersection of the Post Office mail -drop one-way, and the site access roadway. Topic: General Comment Number: 3 Comment Originated: 11/05/2013 11/05/2013: Please povide a copy of the "agreement" letter or access easement to share the Post Office's property and JFK access. Topic: Traffic Impact Study Comment Number: 5 Comment Originated: 11/06/2013 11/06/2013: At the Landings and Boardwalk intersection the overall LOS is not met. Per LCUASS table 4-3 for a stop controlled arterial -arterial intersection, the LOS must be C or better. Some available options include transportation demand measures, intersection improvements or request a variance to the LCUASS standard. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221.6854, rbuffingtonti8fcgov.com Topic: Construction Drawings Comment Number: 6 Comment Originated: 06/1012014 06/10/2014: See redlined utility plans for other comments. Topic: Landscape Plans Comment Number: 5 Comment Originated: 06110/2014 06110/2014: Show fire hydrant on landscape plan and adjust trees and shrubs to meet separation distance requirements. Department: Zoning Contact: Ali van Deutekom, 970.416.2743, avandeutekom@fcgov.com Topic: General Page 8 of 9 Comment Number: , Comment Originated: 11/05/2013 06/09/2014: The City has moved to the NAVD 1988 vertical datum. Please state the project datum on sheets &, and provide an equation to get from NAVD88 to NGVD29 unadjusted, i.e. NAVD88 = NGVD29 Unadjusted + 11/05/2013: Benchmark 6-94 no longer exists. Please change this to another benchmark on sheets 1 &2. Comment Number: 4 Comment Originated: 11/05/2013 06/09/2014: There are line over text issues on sheets 3, 4, 5 & 6. See redlines. 11/05/2013: There are line over text issues on sheets 3, 4 & 5. See redlines. Topic: Landscape Plans Comment Number: 5 Comment Originated: 11/05/2013 06/09/2014: There are still issues. See redlines. 11/0512013: There are line over text issues on sheet 3. See redlines. Topic: Plat Comment Number: 22 Comment Originated: 11/05/2013 06/09/2014: This has not been added. 11/05/2013: Please add the reception number for the Boardwalk Drive right of way. Comment Number: 23 Comment Originated: 11/05/2013 06/09/2014: This has not been changed. 11/05/2013: Please change the new right of way line for Boardwalk Drive to a solid line. See redlines. Comment Number: 26 Comment Originated: 06/09/2014 06/09/2014: Please make changes as marked. See redlines. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Topic: Site Plan Comment Number: 25 Comment Originated: 11/05/2013 06/09/2014: There are still issues. See redlines. 11/0512013: There are line over text issues on sheet 2. See redlines. Department: Traffic Operation Contact: Martina Wilkinson, 970.221-6887, mwilkinson(a)fcoov.com Topic: Construction Drawings Comment Number: 6 Comment Originated: 06/11/2014 06/11/2014: The review package did not include construction drawings for Traffic Operations. Therefore, the previous comments regarding signing remain until they can be determined to be resolved. Topic: General Comment Number: 10 Comment Originated: 06/11/2014 06/11/2014: Is the Post Office easement for an emergency access only, or for daily use? Topic: Site Plan Comment Number: 7 Comment Originated: 06/11/2014 06/11/2014: Transportation Planning has questions regarding pedestrian connectivity around the east side of the property. Page 7 of 9 Comment Number. , 06/10/2014: MARKING Comment Originated: 06/10/2014 2012 IFC503.3: Where required by the fire code official, approved signs or other approved notices that include the words NO PARKING - FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times ad be replaced or repaired when necessary to provide adequate visibility. Department: Stormwater Engineering Contact: Jesse Schlam, 970.218.2932, ischlamt@fcaov.com Topic: Erosion Control Comment Number: 7 Comment Originated: 11/05/2013 06/11/2014: Erosion Control Calculations do not meet City Standards. Please recalculate escrows based on 1.5 times the total for Reseeding costs and 1.5 times the total BMPs costs. Outlet structure also needs to be adequately protected. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com 11/05/2013: Erosion Control Calculation is needed. Redlines should be addressed specifically on 1) Protecting Inlets and Outlet Structure 2) Sequence Chart 3) Perimeter Protection 4) Porous Pavement specifically not storing materials on and in effect clogging the pavement. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970.416.2418, wlamargue(ftnov.com Topic: General Comment Number: 5 Comment Originated: 11/05/2013 06/11/2014: Please add some more landscaping on the bottom of the pond. Please call Wes Lamarque at 416-2418 for more information. 11/05/2013: The detention pond needs to meet the Detention Pond Landscape Standards. Comment Number: 8 06/11/2014: Please add a 2% slope on the bottom of the detention pond. Comment Number: 9 O6/11/2014: Please see redlines for additional comments. Department: Technical Services Contact: Jeff County, 970-221.6588, icounty caov.com Topic: Building Elevations Comment Number: 1 O6/09/2014: There are line over text issues on sheets 6, 7 & 8. See redlines. 11/05/2013: There are line over text issues on sheets 5, 6 & 7. See redlines. Topic: Construction Drawings Comment Originated: 06/11/2014 Comment Originated: 06/11/2014 Comment Originated: 11/05/2013 Page 6 of 9 Comment Number. Comment Originated: 11/05/2013 05/22/2014: 11/05/2013: A portion of the development fees was previously paid. Please contact Engineering at 970-221-6700 for details. Comment Number: 0512212014: 11/05/2013: Comment Originated: 11/05/2013 Power is existing along JFK Parkway. System modification fees may apply depending upons accessibility of existing facilities Department: PFA Contact: Jim Lynxwiler, 970.416.2869, ilvnxwiler .poudre-fire.ora Topic: General Comment Number: 1 6/11/14: FIRE LANES Comment Originated: 11/03/2013 The 7,192 sq. ft. office building is approximately 110' out of general fire access as defined by the International Fire Code, however as the building will have a fire sprinkler system, the 1 10'increase has been approved by the Fire Marshal. 11/03/2013: FIRE LANES The proposed buildings are bordered by arterial roads and it is understood that fire access is to be provided by an EAE on the south side of the property. As the issue of vehicle access remains under discussion between the applicant and the US Postal Service, final fire department approval of the EAE and site plan will be based on final plans. Also, building access is measured from the EAE drive aisle and the current site plan places the primary office building out off access. Further discussion is advised. O61FC 503.1.1: Fire Lanes shall be provided to within 150' of all portions of a building, as measured by an approved route around the exterior of the building or facility. Comment Number: 3 06/10/2014: TURNING RADII Comment Originated: 11/05/2013 > Turning radii into the site at Boardwalk Drive meets minimum fire code requirements (See curve table C2 & C3). > Turning radii near the west end of the site meets minimum fire code requirements (See curve table C4 & C5).. > Applicant must show that the turn created on the south side of the property where it connects with USPS property meets required turning radii at that location. 11/05/2013: TURNING RADII Please confirm that required turning radii for fire apparatus have been met at the connection with the existing US Postal Service drive aisle. 061FC 503.2.4 and Local Amendments: The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Page 5 of 9 Comment Number: . 11/06/2013: Comment Originated: 11/06/2013 Continued 6-11-14 Add a planting note that says that trees will be planted to provide for the following tree utility separations. Check tree placement on plans so that locations adheres to these separation standards. Forty feet between shade trees and street lights. Fifteen feet between ornamental trees and street. lights. Twenty feet between shade and/or ornamental trees traffic control signs and devices. Ten feet between trees and water or sewer mains. Six feet between trees and water or sewer service lines. Eight feet between drivewayslalleys and trees. Comment Number: 7 Comment Originated: 11/06/2013 11/06/2013: Continued 6-11-14 Have all existing trees on the site been identified? If there are any existing trees on the site schedule an on -site meeting with the City Forester to evaluate and obtain information to develop a tree inventory and mitigation plan. Comment Number: 9 Comment Originated: 06/11/2014 O6/1112014: Previous comments (11/06/14) 3, 4 and 7 have been continued. Department: Light And Power Contact: Doug Martine, 970.224-6152, dmartineOfcoov.com Topic: General Comment Number: 5 Comment Originated: 05/22/2014 05/22/2014: After plans are final, an AutoCad drawing (v.2008) of the utility site plan will need to be sent to Terry Cox at TCOX@FCGOV.COM. Contact: Janet McTague, 970-224-6154, imctaaue&fcaov.com Topic: General Comment Number: Comment Originated: 11/05/2013 05/22/2014: 11/0512013: Please provide a C-1 form and one -line diagram for each building Page 4 of 9 Department: Environmental Planning Contact: Lindsay Ex, 970-224.6143, lex@fcgov.com Topic: General Comment Number: 1 11/04/2013: No comments. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan(cDfcaov.com Topic: Landscape Plans Comment Number: 3 11/06/2013: Continued 6-11-14 Add these planting notes: Comment Originated: 11/04/2013 Comment Originated: 11/06/2013 6 The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. 4 A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. 6 The developer shall contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City Forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. Page 3 of 9 Comment Number: [0 Comment Originated: 06/11/2014 O6/11/2014: Mechanical/Utility Equipment (vents, flues, meters, boxes...) locations shall be identified with notes on how such things are screened. Contact: Ted Shepard, 970.221.6343, tshepardta&.fcpov.com Topic: General Comment Number: 1 Comment Originated: 11/11/2013 11/11/2013: As we have discussed, a Letter of Intent from the U.S.P.S. to allow sharing the access drive out to J.F.K. Parkway will be required prior to the public hearing. Comment Number: 3 Comment Originated: 11/11/2013 06/09/2014; The parking count on the cover sheet and the site plan still does not included the two accessibility spaces. Please correct this to include these spaces. 11/1112013: Please adjust the parking data as the two handicap stalls come out of the allowable maximum and are not added to the maximum. Comment Number: 11 Comment Originated: 11/11/2013 O6/09/2014: Where are the catalog cut -sheets of the lighting fixtures? 11/11/2013: For all exterior fixtures, additional data must be provided demonstrating that all fixtures are fully -shielded and down -directional. There is insufficient information to establish compliance with this criterion. Department: Engineering Development Review Contact: Tyler Siegmund, 970.221.6501, tsieamund(&fcpov.com Topic: General Comment Number: 5 Comment Originated: 11/05/2013 06/11/2014: A letter of intent from the USPS to grant an access easement has been received. Please forward a copy of the final signed access easement documents once executed. An executed, recorded easement will be needed prior to project approval. 11/05/2013: Please provide a copy of the access easement that is needed on the USPS property and reference the reception number on the plat. Comment Number: 9 Comment Originated: 11/05/2013 06/11/2014: It was discussed that the retaining wall will be moved to the north, away from the property line so that it does not affect the USPS property and require a temporary construction or grading easements. 11/05/2013: A grading easement or agreement will be needed from the USPS for the proposed grading along the south property line along the retaining wall. Comment Number: 11 Comment Originated: 06/11/2014 O6/11/2014: The proposed fire hydrant is located in the existing the handicap ramp. Please relocate to a location that will not interfere with the existing sidewalk or handicap ramp. Comment Number: 12 Comment Originated: 06/11/2014 06/11/2014: Please add LCUASS sidewalk detail 1601 to the details sheet Page 2 of 9 F6rt Collins June 12, 2014 Dan Bemth Doberstein lemburg 1401 Riverside Ave. Suite A Fort Collins, CO 80524 RE: Home Instead Plaza, FDP130042, Round Number 2 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov. com/developmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at 970416-2313 or nbeals@fcgov.com. Comment Summary: Department: Planning Services Contact: Noah Beals, 970.416.2313, nbealsofcaov.com Topic: General Comment Number: 14 Comment Originated: 06/09/2014 06/09/2014: On the landscape plan sheet 3of9 note number 17 refers to the plans as a PUD this is not a PUD and PUD should be corrected to Final Plans On the same sheet in note number 18 and 19 the word "shall" is mispelled. Comment Number: 15 Comment Originated: 06/09/2014 06/09/2014: On sheet 6of9 the call outs on the elevations are not pointing to the correct portions of the building. Comment Number: 16 Comment Originated: 06109/2014 06/09/2014: Please revise the signature block for the Planning to The Director of Community Development & Neighborhood Services (CDNS). Please remove Current Planning, this department has been renamed to Planning Services. Comment Number: 17 Comment Originated: 06/09/2014 06/09/2014: Add a tree or two to the sod area on the south side of the office buiding. Comment Number: 18 Comment Originated: 06/09/2014 06/09/2014: The enclosed bike spaces are identified on the plan but where are the fixed spaces? Comment Number: 19 Comment Originated: 06/09/2014 06/09/2014: On the elevation please label the bottom of the parapet wall, to verify that it is tall enough to provide screening the mechanical/utility equipment. Page 1 of 9