Loading...
HomeMy WebLinkAboutBRAZIL 2004 SUBDIVISION - FDP - 23-04A - CORRESPONDENCE -Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility Number: 26 Created: 1 /12/2005 [1/12/05] Curb stop and meter pit for Lot 2 must be in a landscaped area. Prefered location would be near fire hydrant. This can be addressed at the PDP stage. Instead of a resubmittal, please bring one paper set to JR in Technical Services to review for scanability. Then run that copy by Susan Joy to make sure all these issues are addressed sufficiently. Be sure to return her redlines. Once you have her thumbs up, you are ready to go to mylar. In the interest of saving time, you may bring your mylars in at the same time but make sure all the issues herein have been addressed to save having to redo them! If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Anne H. Aspen City Planner Page 2 • STAFF PROJECT REVIEW City of Port Collins ZTI GROUP/ARCHITECTURE Date: 01/12/2005 ED ZDENEK 2120 S. COLLEGE AVE. FT. COLLINS, CO 80525 Staff has reviewed your submittal for BRAZIL 2004 SUBDIVISION- TYPE I (LUC), Final Compliance, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: Plat Number: 17 Created: 1 /10/2005 [1/10/051 Please see the attached for the latest version of the Plat Language. I can also email you with this document so that you don't have to retype it all. Please send me an email at sjoy@fcgov.com if you would like this. Please see redlines for other corrections. Number: 18 Created: 1 /10/2005 (1/10/05] The 24' Access and Utility Easement needs to be called "24' Public Access and Utility Easement". Topic: Utility Number: 19 Created: 1 /10/2005 [1/10/05] Please remove the word "subdivision" from the title. The title needs to match the plat. Number: 20 Created: 1 /10/2005 [1/10/05] General Note 39 (should be 40) requires two project benchmarks. Number: 21 Created: 1 /10/2005 [1/10/05] There are 48 notes in all, one is missing from the plan set. Number: 22 Created: 1 /10/2005 (1/10/05] See Appendix E6 for scanning requirements. The shaded areas on the plans will not scan. You may want to see Tech Services and have them scan the plans to see if the grey tones will scan, they appear too light to scan well. Number: 23 Created: 1 /10/2005 (1/10/05] Sheet 3 -there are two objects that aren't labeled and are within the utility easement. One maybe a patio or building and the other is a median. No structures of any kind except a landscape median are allowed in utility easements and they will need to come out if existing or they can't be built there if proposed. There will need to be a ten foot separation between the 2 light fixtures shown and the sewer line Please clarify the drawings. Number: 24 Created: 1 /10/2005 [1/10/051 Sheet 3 - turn off the landscape layer. Number: 25 Created: 1 /10/2005 [1/10/05] See redlines for other comments. Page t