HomeMy WebLinkAboutBRAZIL 2004 SUBDIVISION - PDP - 23-04 - DECISION - FINDINGS, CONCLUSIONS & DECISION'I
�I
'
07
cJ
sZOr!Ijq io
s /�y to �d�3
_ 3833 — - XX-5
�' 2evi (�VCcr�/o� 2 F�/ ti Ce�l(.e� ZZ/ — LvLvDS
Brazil 2004 Subdivision (#23-04)
August 13, 2004 Administrative Hearing
Findings, Conclusion and Decision
Page 5
DECISION
The Brazil 2004 Subdivision (#23-04) is hereby approved by the Hearing Officer
with the condition that the Plat not be filed until access easements have been
dedicated for Lot 2.
Dated this 13t' day of August 14, 2004, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
Joe FraR
Advan Planning Director
Brazil 2004 Subdivision (#23-04)
August 13, 2004 Administrative Hearing
Findings, Conclusion and Decision
Page 4
of any building shall be permitted until the subdivision plat is filed and
recorded in the City of Fort Collins.
B. The subdivision plat is in compliance with Section 3.3.1(B) Lots in that:
• The two lots are over 10,000 square feet in size and Division 4.14
Community Commercial District does not set forth minimum lot
dimensions; each lot has direct vehicular access to a public street or
public alley (West Elizabeth and City Park Avenue respectively), and the
side lot lines are substantially at right angles or radial to street and alley
lines.
• The general layout of lots, roads, driveways, utilities, drainage facilities
and other services within the proposed lots has been previously
established in the Campus West area.
C. The subdivision plat is in compliance with Section 3.3.1(C) Public Sites,
Reservations and Dedications in that:
• The applicant shall be required to dedicate rights -of way for public streets,
drainage easements, utility easements and access easements as needed
to serve the area being platted. This has been mostly done, and when the
utility plans are finalized these will be revised as needed by separate
document.
• Reservation of sites for flood control, open space and other municipal
uses shall be made in accordance with the requirements of this Land Use
Code.
SUMMARY OF CONCLUSIONS
1. The Brazil 2004 Subdivision meets the procedural requirements located in
Division 2.1 - General Procedural Requirements, Division 2.2 - Common
Development Review Procedures for Development Applications, and
Section 2.4 - Project Development Plan located in Article 2 -
Administration.
2. The Brazil 2004 Subdivision meets the plat requirements located in
Section 3.3.1 - Plat Standards located in Article 3 - General
Development Standards.
Brazil 2004 Subdivision (#23-04)
August 13, 2004 Administrative Hearing
Findings, Conclusion and Decision
Page 3
E: CC: Existing commercial (Campus West Self Serve Car Wash and John
XXIII University Center)
S: CC: Existing single family house and undeveloped land (John XXIII
University Center)
W: CC: Existing commercial and retail (Schrader's Gas Station and Country
Store, Campus West Liquor Depot)
The purpose of the Brazil 2004 Subdivision is to create two legally subdivided
lots on a property that is currently one lot. The existing lot is 1.546 acres. The
requested subdivision would create two lots: a 1.315 acre lot (57,291 sf)
containing the vacant theater building fronting on West Elizabeth St. and a .231
acre lot (10,077 sf) fronting City Park Avenue.
The expressed intent of the applicant is to sell Lot 2 to a commercial
establishment; however, no site layout or building plans for new structures are
being reviewed at this time. The existing Campus West theatre will remain on the
Lot 1. Staff has determined that there is no detriment to the development plan
associated with the platting of the two lots.
2. Article 2 — Administration
The Brazil 2004 Subdivision complies with the applicable requirements of the
LUC, specifically the procedural requirements located in Division 2.1 - General
Procedural Requirements, Division 2.2 - Common Development Review
Procedures for Development Applications, and Section 2.4 - Project
Development Plan located in Article 2 - Administration.
3. Article 3 of the Land Use Code — General Development Standards
Brazil 2004 Subdivision complies with the applicable requirements of the LUC,
specifically the plat requirements located in Section 3.3.1 - Plat Standards
located in Article 3 - General Development Standards.
A. The subdivision plat is in compliance with Section 3.3.1(A) General
Provisions in that:
• The subdivision plat will be filed and recorded only after having been
approved by the Director of Planning, with such approval evidenced in
writing on the plat and signed by the City Clerk.
• No building permit or certificate of occupancy shall be issued for
construction of any new principal building or no act which changes the use
Brazil 2004 Subdivision (#23-04)
August 13, 2004 Administrative Hearing
Findings, Conclusion and Decision
Page 2
NOTICE OF PUBLIC HEARING:
Evidence presented to the Hearing Officer established no controversy or facts to
refute that the hearing was property posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code,
opened the hearing at approximately 9:00 a.m. on Friday, August 13, 2004 in
Conference Room A at 281 N. College Avenue, Fort Collins, CO
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE
The Hearing Officer accepted during the hearing the following evidence: 1)
Planning Department Staff Report; 2) application, plans, maps and other
supporting documents submitted by the applicant and the applicant's
representatives to the City of Fort Collins; and 3) a tape recording of testimony
provided during the hearing. The LUC, the City's Comprehensive Plan (City
Plan), and the formally promulgated policies of the City are all considered part of
the evidence considered by the Hearing Officer.
The following is a list of those who attended the Hearing:
Sheri Wamhoff, Engineering, City of Fort Collins
Anne Aspen, Current Planning, City of Fort Collins
Ed Zdenick, applicant
Rex Miller, representing the owner
David McLaughlin, affected party
There were no written comments.
FACTS AND FINDINGS
Compatibility with Surrounding Uses:
The surrounding zoning and land uses are as follows:
N: CC: Existing restaurant and retail (McDonald's and the Patterson
Building)
City of Fort Collins
Comma ty Planning and Environmenta. 2rvices
Current Planning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE 1 ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE:
PROJECT:
APPLICANT:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
August 13, 2004
Brazil 2004 Subdivision (#23-04)
Ed Zdenek
ZTI Group/Architecture
2120 S. College
Fort Collins, CO 80525
Alvin Miller Trust
C/o Rex Miller
3833 Spruce Drive
Fort Collins, CO 80526
Joe Frank
Advance Planning Director
This is a request to subdivide unplatted parcel of land into two lots. The existing
lot is located near the corner of City Park Avenue and West Elizabeth Street and
is zoned CC, Community Commercial.
SUMMARY OF HEARING OFFICER DECISION: Approval with conditions
STAFF RECOMMENDATION: Approval with conditions. The Staff
recommendation contains a condition that will allow the applicant to proceed with
real estate transactions once access easements are dedicated for Lot 2. The
proposed utility easement locations cannot be determined until the engineering
design is complete. Platting easements now may require the applicant and staff
to dedicate new easements and vacate old easements by separate document
once the utility plans determine their correct location.
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020