HomeMy WebLinkAboutBRAZIL 2004 SUBDIVISION - PDP - 23-04 - CORRESPONDENCE - (8)Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 9 Created: 7/27/2004
[7/27/04] Poudre Fire Authority has no comments regarding the replat however, Poudre Fire
Authority reserves the right to comment on any future construction pertaining to these two
lots.
Number: 11 Created: 8/3/2004
[8/3/04] Pevious comments dated 7/27/04 still pertain.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 12 Created: 8/6/2004
Please provide a City Benchmark with elevation on the plat.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 10 Created: 8/3/2004
[8/3/04] no comments
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Anne Aspen
City Planner
Page 2
1. STAFF PROJECT REVIEW
City of Fort Collins
ZTI GROUP/ARCHITECTURE Date: 08/09/2004
ED ZDENEK
2120 S. COLLEGE AVE.
FT. COLLINS, CO 80525
Staff has reviewed your submittal for BRAZIL 2004 SUBDIVISION- TYPE I (LUC), and we
offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number: 14 Created: 8/6/2004
[8/6/04] West Elizabeth is referred to as an Avenue on the plat but it is actually West
Elizabeth Street.
Topic: Plat
Number: 13 Created: 8/6/2004
[8/6/04] A second plat was submitted to Engineering (only) just prior to staff review on
August 4. There are discrepancies between that plat and the one received in the submittal,
and there remain some unanswered questions around utility easements. Since these issues
will likely not be resolved before hearing, and in order to facilitate what we presume is an
interest in selling Lot 2 as a platted lot, we are recommending a meeting on Monday August
9th to figure out how best to proceed.
Department: Engineering Issue Contact: Susan Joy
Topic: Plat
Number: 3
[7/30/04] Corrections are still required, see redlines.
eric@northernengineering.com on 8/2/4.
[7/8/04] Most of the plat language shown is incorrect
Language to kevin@ztigroup.com on 7/12/04.
Created: 7/8/2004
1 emailed the correct plat language to
I have emailed the correct Plat
Number: 15 Created: 8/6/2004
[8/6/04] Will need to dedicate a 24' Public Access Easement so that Lot 2 can share the
(future?) drive entrance with Lot 1 off city Park Avenue. Lot 1 will NOT be allowed to have
its own driveway off of City Park due to the spacing requirements on Collectors.
Number: 16 Created: 8/6/2004
[8/6/04] The proposed utility easement locations are determined by the engineered utility
plan designs. Since this hasn't been done yet and we haven't seen a proposed site layout
for the two lots, the comments we are making today may be incomplete. Also, once the
utility plans are done, they may change where the plat is proposing the utility easements
and the property owner would then have to vacate the old easements by separate document
and dedicate new easements by separate document OR replat the property again. This
may get harder and more expensive with two property owners involved once Lot 2 is sold
off.