Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BRAZIL 2004 SUBDIVISION - PDP - 23-04 - CORRESPONDENCE -
PROJECT. COMMENT SHEET City of Fort Collins Current Planning DATE: June 22, 2004 TO: Xcel Energy PROJECT: #23-04 Brazil 2004 Subdivision - Type I (LUC) All comments must be received by Anne Aspen no later than the staff review meeting: RECEIVED July 14, 2004 j''` _ f . CURRENT PLANNING Note - PLEASE identify your redlines for suture reference ANY P.EtocATIVN . CUT -OF):-, . ©k IVEIAJ IIt.TA' tYTiOA/ ll/ FR=SL1TFff e EXI.ITIN6- FhC,)LITIEI CANNOT CRM ME [OT TO 6ET TO THE OTHEe. OUP REC RDI 60 Ha /NOICA-TE T///.I PkCRIFM. e nRs SERVICE VOULD 13E SERVE/3 FROM C/TV PRRk /-UE FOP, LOT Z 0 10T I COULD RE ..SERVED FROM CITV Mee our: iO l✓EfT EL12hdE7H AUE. PSCO SNoI!/._! Pr 6" ML✓ MnlN /N L✓. ELIZABET-14 ALC /tRD A 2'. M W Mq-lN IIl CITY PRRP XLIET Name (please print) ` CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS z-F art _Site _Drainage Report —Other ty _Redline Utility _Landscape City of Fort Collins Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Plat Number: 5 Created: 7/13/2004 [7/13/04] Brazil2000 Floodplain comments Susan Hayes 7-2-04 1. This site is located in the Canal Importation High Risk and Moderate Risk 100-year floodplain. Please show the limits of the floodplain on the plat and include a City benchmark and elevation on the plat. 2. Any redevelopment of the site will have to meet the floodplain regulations. You can contact Susan Hayes of the Stormwater Utility to get information on the regulations, 416- 2233. Department: Water Wastewater Issue Contact: Roger Buffington Topic: General Number: 7 Created: 7/14/2004 [7/14/04) How will Lot 2 connect to sewer? Will easement be needed across Lot 1? Nearest sewer to west is across City Park Avenue in an easement between liquor store and the apartment complex. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Anne H. Aspen City Planner Page 2 STAFF PROJECT REVIEW 219 Fort Collins ZTI GROUP/ARCHITECTURE Date: 07/16/2004 ED ZDENEK 2120 S. COLLEGE AVE. FT. COLLINS, CO 80525 Staff has reviewed your submittal for BRAZIL 2004 SUBDIVISION- TYPE I (LUC), and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: Plat Number: 3 Created: 7/8/2004 [7/8/04] Most of the plat language shown is incorrect. I have emailed the correct Plat Language to kevin@ztigroup.com on 7/12/04. Number: 4 Created: 7/8/2004 [7/8/04] West Elizabeth Avenue is considered a constrained 4 lane arterial. Because the centerline in Elizabeth wanders a little through the curve, the only way to tell whether or not the correct amount of row is being dedicated is to measure 15' from the back (not the face) of the existing curb. Please provide an exhibit (8.5xl 1 is fine) showing this information so that I can tell whether the plat is correct. No utility easement is required along this portion of Elizabeth. Department: Light & Power Issue Contact: Doug Martine Topic: Electric Number: 1 Created: 6/29/2004 [6/29/04] There is an existing underground electric powerline generally along the northerly side of lot 2. The developer will need to call Roger Fain at 221-6294 and have location of this line identified. The developer will then need to verify that the line is within the 5 ft. easement shown, provide a wider easement if necessary, or pay to have the existing line relocated. Number: 2 Created: 6/29/2004 [6/29/04) Power requirements, electric development charges for both lots, and system modifications/costs will need to be coordinated with Light & Power Engineering (221-6700). Department: Natural Resources Topic: General Number: 8 [7/14/04) No issues with replat. Department: Police Topic: General Number: 6 [7/13/04] No comments Issue Contact: Doug Moore Created: 7/14/2004 issue Contact: Joseph Gerdom Created: 7/13/2004 Page 1