HomeMy WebLinkAboutBRAZIL 2004 SUBDIVISION - PDP - 23-04 - CORRESPONDENCE - CORRESPONDENCEAnne Aspen _Re: Brazil 2004 �.. Page 1
From:
Susan Joy
To:
Anne Aspen
Date:
7/12/04 9:55AM
Subject:
Re: Brazil 2004
Hi Anne! Ok on the plat language and the row is going to be a little tricky. I talked with both Tom Reiff
and Erika (the capital project engineer on the Elizabeth Street Improvements project) and the only way to
tell if they have accounted for enough row is to measure 15' from the back of the existing curb (not face of
curb). If they can do that then they should be fine. You see, the centerline of Elizabeth wanders around in
that area a little bit and it hard to say "just give me another 8 or 9 feet". If the engineer could send me a
little 8.5x11 exhibit showing me where the existing curb is and that he's measured 15' back from the back
of curb then that will really help me a lot.
>>> Anne Aspen 07/09/04 02:30PM >>>
Susan,
Just spoke with Ed Zdenik at ZTI. He wants to get an emailed copy of the plat language sent to
kevin @ztigrouo.com. Also, he says the 8.5' ROW figure on Eliz came from Tom Reiff and Helen Mattson.
Is that incorrect?
Please advise. You can call him at 227-0693 or email.
Thanks,
Anne
CC: kevin@ztigroup.com
15' froyyL