HomeMy WebLinkAboutWILLOW STREET LOFTS - FDP - 24-04A - CORRESPONDENCE - (7)As we discussed in staff review, prior to going to mylars, you will need to address all of the
comments above and any on redlines, address the flowline grade issue (which was done
today, Oct 1), address the phasing plan issue, receive alignments and easements as
needed, and have a functioning outfall constructed (should be addressed within the week by
the City). We do not need another formal round of review prior to going to mylar but feel
free to run paper copies by any of us if you have any questions or concerns about what is
expected. If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at (970) 221-6206.
Sincerely,
Anne H. Aspen
City Planner
Page 4
3.4.1 Natural Habitats and Features
(0) Proof of Compliance.
(2) If the Director obtains credible information regarding threatened or pending regulatory
enforcement action related to an environmental condition of the property to be developed, or
an environmental impact related to the development plan, then the Director may require the
developer to provide to the city written statements from such governmental agencies as the
Director may designate as having related jurisdiction based on the nature of the threatened
enforcement action or environmental impact. Said statements shall verify that the
development plan fully complies with environmental regulations within the jurisdiction of the
writing agency. If the developer, after a diligent effort, is unable to obtain such written
verifications from one (1) of more of the designated agencies, the developer shall at least
provide to the city a written verification from said agency that the city's approval of the
development plan will not interfere with a threatened or pending environmental enforcement
action of said agency. All required written statements shall be provided to the Director prior
to the scheduling of the hearing for the project development plan.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 128 Created: 9/18/2007
[9/18/07] PFA has no comments or concerns at this time.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan
Topic: Stormwater
Number: 131 Created: 9/25/2007
[9/25/07] The outfall swale which this development drains into is no longer operational. It is
anticipated that this issue will be resolved by the Aztlan Center, however, the approval of
this site will be conditional on that issue being addressed.
Please provide a legal description for the alignment across City property that this site will
need in order to drain into the United Way parking lot swale.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/WW
Number: 129 Created: 9/24/2007
[9/24/07] Label sewer service clean -outs in paved areas as "traffic rated".
Number: 130 Created: 9/24/2007
[9/24/07] Label 6"sewer line from manhole in Pine Street to the building as a 6" sewer
service.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 77 Created: 10/17/2006
[9/20/07] 1 still don't see the distance.
[6/14/07] What's the distance from the building to the northwest lot line.
[10/17/06] Need to show/label and dimension the building footprint/envelope and setbacks
from building to lot lines. ALnl� .
Page 3
Number: 134 Created: 9/26/2007
[9/26/07] I'm confused why three separate Areas for easements are being specified when
all three have the same use and are continuous. Couldn't one area be specified with one
legal?
Number: 135 Created: 9/26/2007
[9/26/07] Is a 5' utility easement being granted by the Developer to the City for the usage of
utilities (Comcast and Qwest).
Number: 136 Created: 10/1 /2007
[10/1/07] It should be verified whether the observation wells on site require review and
approval by a third party.
Number: 137 Created: 10/1 /2007
[10/1/07] Technical Services offers the following comments:
- "fade back" lines of the surrounding areas on the site plan will not show on scanning.�y
- a legal description is needed on the site plan. 'Co acrid, �[ hsz �1d vteSS GCS'
- please provide a full site plan set for review. lL�tiS
Department: Environmental Planning Issue Contact: Dana Leavitt
Topic: Air Quality
Number: 8 Created: 7/27/2004
[9/25/07]
[10/19/06]
[7/27/04] Prior to occupancy, indoor air quality must be measured properly and in
accordance with local, state, and federal health standards to ensure safe public use.
Number: 36 Created: 7/28/2004
[9/25/07]
[10/19/06]
[7/28/04] Characterization and proper handling and notification of any contaminated
materials encountered during construction must be made to all applicable local, state and
federal regulatory agency contacts.
Number: 37 Created: 7/28/2004
[9/25/07]
[10/19/06]
[7/28/04] Design and construction of sub -slab venting system for any new construction must
be incorporated due to contamination from the former Poudre Valley Gas Company which
may trigger unsafe indoor air quality.
Topic: General
Number: 7 Created: 7/27/2004
[9/25/07]
[10/19/06]
[7/27/04] This project will be needed to provide written statement verifying that the
development plan fully complies with environmental regulations.
Pa,,e
a Am" )
STAFF PROJECT REVIEW
Citv of Fort Collins
LAGUNITAS COMPANIES Date: 10/1/2007
JON PROUTY
3944 JFK PKWY #12E
FT. COLLINS, CO 80525
Staff has reviewed your submittal for WILLOW STREET LOFTS PDP - TYPE I AND FINAL
PLANS, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 94 Created: 10/18/2006
[9/26/07] It would appear that in addition to the dollar amounts specified below additional
costs will need to be accounted for with the removal of the bump -outs (and associated
landscaping).
[6/21/07] In checking with Kathleen Bracke and the Willow Street designs we've received,
the following conclusions were made:
- The grading plan should show the centerline elevations specified on the Willow Street
design and then assume a 2% cross slope to establish the flowline of the new curb.
- The street trees being shown on the plans need to be moved, abutting the flowline of
Willow Street as the design for Willow indicates the street trees are within the 5' of width
behind the curb and gutter.
- The remaining 15' of sidewalk width behind the street tree zone to the building shall have a
cross slope meeting ADA requirements.
- For Willow Street, it was determined that the local street portion of pavement required to be
provided for the project is $2,840. This amount may be adjusted based on inflation at the
time the payment is made (required prior to a building permit).
- For Pine Street, it was determined that the local street portion of pavement required to be
provided for the project is $1,200. This amount may be adjusted based on inflation at the
time the payment is made (required prior to a building permit).
[10/18/06] Willow Street improvements need to be coordinated with Kathleen Bracke. On
the Northside Aztlan Community Center, rather than build public improvements along Willow
Street, a local street portion was collected at $95 per linear foot.
Number: 132 Created: 9/26/2007
[9/26/071 The revised design specifies a .33% cross slope along the Willow Street frontage,
which does not meet the minimum .5% specified in LCUASS. In looking at sheet 7 of the
ultimate design it appears to vary from the previous Sheet 7 that specified .56% and .4% in
the ultimate. Per the follow-up meeting on 10/1, please look into tweaking the flowline
grades to better achieve a grade that meets (or is closer to) our .5%. Please provide cross
section information to get an idea how the street will work in the interim condition.
Number: 133 Created: 9/26/2007
[9/26/071 It would appear that a phasing plan is of benefit and may include the creation of
the temporary asphalt sidewalk per our 10/1 meeting.